-
1
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
DOI 10.1016/j.ejor.2006.06.060, PII S0377221706008174
-
Allahverdi, A., et al., 2008. A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187 (3), 985-1032. (Pubitemid 350236619)
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
2
-
-
58049221027
-
Hybrid flow shop scheduling with parallel batching
-
Amin-Naseri, M.R. and Beheshti-Nia, M.A., 2009. Hybrid flow shop scheduling with parallel batching. International Journal of Production Economics, 117 (1), 185-196.
-
(2009)
International Journal of Production Economics
, vol.117
, Issue.1
, pp. 185-196
-
-
Amin-Naseri, M.R.1
Beheshti-Nia, M.A.2
-
3
-
-
56749182367
-
Scheduling hybrid flowshop with parallel batching machines and compatibilities
-
Bellager, A. and Oulamara, A., 2009. Scheduling hybrid flowshop with parallel batching machines and compatibilities. Computers and Operations Research, 36 (6), 1982-1992.
-
(2009)
Computers and Operations Research
, vol.36
, Issue.6
, pp. 1982-1992
-
-
Bellager, A.1
Oulamara, A.2
-
4
-
-
59049093514
-
A branch and bound algorithm for two-stage hybrid flow shops: Minimizing the number of tardy jobs
-
Choi, H.-S. and Lee, D.-H., 2007. A branch and bound algorithm for two-stage hybrid flow shops: Minimizing the number of tardy jobs. Journal of the Korean Institute of Industrial Engineers, 33, 213-220.
-
(2007)
Journal of the Korean Institute of Industrial Engineers
, vol.33
, pp. 213-220
-
-
Choi, H.-S.1
Lee, D.-H.2
-
5
-
-
59049095231
-
Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops
-
Choi, H.-S. and Lee, D.-H., 2009. Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops. Computer & Industrial Engineering, 56 (1), 113-120.
-
(2009)
Computer & Industrial Engineering
, vol.56
, Issue.1
, pp. 113-120
-
-
Choi, H.-S.1
Lee, D.-H.2
-
8
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
Graham, R.L., et al., 1979. Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics, 5, 287-326.
-
(1979)
Annals of Discrete Mathematics
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
-
9
-
-
0036722154
-
Heuristics for hybrid flow shops with controllable processing times and assignable due dates
-
DOI 10.1016/S0305-0548(01)00040-5, PII S0305054801000405
-
Gupta, J., et al., 2002. Heuristics for hybrid flow shop with controllable processing times and assignable due dates. Computers and Operations Research, 29 (10), 1417-1439. (Pubitemid 34409655)
-
(2002)
Computers and Operations Research
, vol.29
, Issue.10
, pp. 1417-1439
-
-
Gupta, J.N.D.1
Kruger, K.2
Lauff, V.3
Werner, F.4
Sotskov, Y.N.5
-
10
-
-
0026190509
-
Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
-
Gupta, J.N.D. and Tunc, E.A., 1991. Schedules for a two-stage hybrid flowshop with parallel machines at the second stage. International Journal of Production Research, 29 (10), 1489-1502.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.10
, pp. 1489-1502
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
11
-
-
0032166084
-
Minimizing tardy jobs in a two-stage hybrid flowshop
-
Gupta, J.N.D. and Tunc, E.A., 1998. Minimizing tardy jobs in a two-stage hybrid flowshop. International Journal of Production Research, 36 (9), 2397-2417. (Pubitemid 128670856)
-
(1998)
International Journal of Production Research
, vol.36
, Issue.9
, pp. 2397-2417
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
12
-
-
0031955940
-
A two-stage hybrid flowshop with uniform machines and setup times
-
DOI 10.1016/S0895-7177(97)00258-6, PII S0895717797002586
-
Huang, W. and Li, S., 1998. A two-stage hybrid flowshop with uniform machines and setup times. Mathematical and Computer Modelling, 27 (2), 27-45. (Pubitemid 28153723)
-
(1998)
Mathematical and Computer Modelling
, vol.27
, Issue.2
, pp. 27-45
-
-
Huang, W.1
Li, S.2
-
14
-
-
0031258498
-
Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stage
-
PII S0305048397000157
-
Kim, J.S., Kang, S.H., and Lee, S.M., 1997. Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stage. Omega, 25 (5), 547-555. (Pubitemid 127169590)
-
(1997)
Omega
, vol.25
, Issue.5
, pp. 547-555
-
-
Kim, J.-S.1
Kang, S.-H.2
Lee, S.M.3
-
15
-
-
33748432308
-
A note on makespan minimization in two-stage flexible flow shops with uniform machines
-
DOI 10.1016/j.ejor.2005.06.017, PII S0377221705005199
-
Kyparisis, G.J. and Koulamas, C., 2006. A note on makespan minimization in two-stage flexible flow shop with uniform machines. European Journal of Operation Research, 175 (2), 1321-1327. (Pubitemid 44345083)
-
(2006)
European Journal of Operational Research
, vol.175
, Issue.2
, pp. 1321-1327
-
-
Kyparisis, G.J.1
Koulamas, C.2
-
16
-
-
84874661859
-
Modeling and heuristics for operators' efficiency in a flexible flow line
-
under review
-
Lanzetta, M., et al., 2013. Modeling and heuristics for operators' efficiency in a flexible flow line. Production Planning and Control (under review).
-
(2013)
Production Planning and Control
-
-
Lanzetta, M.1
-
17
-
-
9744269106
-
A branch-and-bound algorithm for a two-stage hybrid flow shop scheduling problem minimizing total tardiness
-
Lee, G.-C. and Kim, Y.-D., 2004. A branch-and-bound algorithm for a two-stage hybrid flow shop scheduling problem minimizing total tardiness. International Journal of Production Research, 42 (22), 4731-4743.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.22
, pp. 4731-4743
-
-
Lee, G.-C.1
Kim, Y.-D.2
-
18
-
-
0141509086
-
A case study in a two-stage hybrid flow shop with setup time and dedicated machines
-
Lin, H. and Liao, C., 2003. A case study in a two-stage hybrid flow shop with setup time and dedicated machines. International Journal of Production Economics, 86 (2), 133-143.
-
(2003)
International Journal of Production Economics
, vol.86
, Issue.2
, pp. 133-143
-
-
Lin, H.1
Liao, C.2
-
19
-
-
77649189522
-
An effective hybrid particle swarm optimization for batch scheduling of polypropylene processes
-
Liu, B., et al., 2010. An effective hybrid particle swarm optimization for batch scheduling of polypropylene processes. Computers & Chemical Engineering, 34 (4), 518-528.
-
(2010)
Computers & Chemical Engineering
, vol.34
, Issue.4
, pp. 518-528
-
-
Liu, B.1
-
20
-
-
78650623486
-
Hybrid flowshop scheduling with batch-discrete processors and machine maintenance in time windows
-
Luo, H., et al., 2011. Hybrid flowshop scheduling with batch-discrete processors and machine maintenance in time windows. International Journal of Production Research, 49 (6), 1575-1603.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.6
, pp. 1575-1603
-
-
Luo, H.1
-
21
-
-
84985846638
-
A comparison of sequencing rules for a two-stage hybrid flow shop
-
Narasimhan, S.L. and Mangiameli, P.M., 1987. A comparison of sequencing rules for a two-stage hybrid flow shop. Decision Sciences, 18 (2), 250-265.
-
(1987)
Decision Sciences
, vol.18
, Issue.2
, pp. 250-265
-
-
Narasimhan, S.L.1
Mangiameli, P.M.2
-
22
-
-
0021466086
-
Scheduling in a two stage manufacturing process
-
Narasimhan, S.L. and Panwalkar, S.S., 1984. Scheduling in a two stage manufacturing process. International Journal of Production Research, 22 (4), 555-564.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.4
, pp. 555-564
-
-
Narasimhan, S.L.1
Panwalkar, S.S.2
-
23
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
DOI 10.1016/0305-0483(83)90088-9
-
Nawaz, M., Enscore Jr. , E.E., and Ham, I., 1983. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. OMEGA, The International Journal of Management Science, 11 (1), 91-95. (Pubitemid 13193807)
-
(1983)
Omega
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
24
-
-
37849186110
-
Batch scheduling of jobs with identical process times on flexible flow lines
-
DOI 10.1016/j.ijpe.2004.04.013, PII S0925527305002367, Scheduling in Batch-Processing Industries and Supply Shains
-
Quadt, D. and Kuhn, H., 2007. Batch scheduling of jobs with identical process times on flexible flow lines. International Journal of Production Economics, 105 (2), 385-401. (Pubitemid 44827608)
-
(2007)
International Journal of Production Economics
, vol.105
, Issue.2
, pp. 385-401
-
-
Quadt, D.1
Kuhn, H.2
-
25
-
-
34247624966
-
Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method
-
DOI 10.1016/j.rcim.2006.06.004, PII S0736584506000810
-
Rossi, A. and Dini, G., 2007. Flexible job-shop scheduling with routing flexibility and separable setup time using ant colony optimisation method. Robotics and Computer Integrated Manufacturing, 23, 503-16. (Pubitemid 46670678)
-
(2007)
Robotics and Computer-Integrated Manufacturing
, vol.23
, Issue.5
, pp. 503-516
-
-
Rossi, A.1
Dini, G.2
-
26
-
-
84874663922
-
Featuring native metaheuristics for non-permutation flowshop scheduling
-
under review
-
Rossi, A. and Lanzetta, M., 2012. Featuring native metaheuristics for non-permutation flowshop scheduling. Journal of Intelligent Manufacturing (under review).
-
(2012)
Journal of Intelligent Manufacturing
-
-
Rossi, A.1
Lanzetta, M.2
-
27
-
-
73449099561
-
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
-
Ribas, I., Leinsten, R., and Framiñ an, M., 2010. Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective. Computers & Operations Research, 37 (8), 1439-1454.
-
(2010)
Computers & Operations Research
, vol.37
, Issue.8
, pp. 1439-1454
-
-
Ribas, I.1
Leinsten, R.2
Framiñ An, M.3
-
28
-
-
33846601882
-
Scheduling a hybrid flowshop with batch production at the last stage
-
DOI 10.1016/j.cor.2005.10.014, PII S0305054805003370
-
Xuan, H. and Tang, L., 2007. Scheduling a hybrid flow shop with batch production at the last stage. Computers and Operations Research, 34 (9), 2718-2733. (Pubitemid 46176402)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.9
, pp. 2718-2733
-
-
Xuan, H.1
Tang, L.2
|