2
-
-
33947276768
-
An integrated production and preventive maintenance planning model
-
10.1016/j.ejor.2006.06.032
-
E. H. Aghezzaf M. A. Jamali D. Ait-Kadi 2007 An integrated production and preventive maintenance planning model European Journal of Operational Research 181 679 685 10.1016/j.ejor.2006.06.032
-
(2007)
European Journal of Operational Research
, vol.181
, pp. 679-685
-
-
Aghezzaf, E.H.1
Jamali, M.A.2
Ait-Kadi, D.3
-
3
-
-
45849131693
-
Integrated production planning and preventive maintenance in deteriorating production systems
-
10.1016/j.ins.2008.05.007
-
E. H. Aghezzaf N. M. Najid 2008 Integrated production planning and preventive maintenance in deteriorating production systems Information Sciences 178 3382 3392 10.1016/j.ins.2008.05.007
-
(2008)
Information Sciences
, vol.178
, pp. 3382-3392
-
-
Aghezzaf, E.H.1
Najid, N.M.2
-
4
-
-
0026243299
-
Bicriteria scheduling problem involving total tardiness and total earliness penalties
-
10.1016/0925-5273(91)90044-T
-
M. Azizoglu S. Kondakci O. Kirca 1991 Bicriteria scheduling problem involving total tardiness and total earliness penalties International Journal of Production Economics 23 17 24 10.1016/0925-5273(91)90044-T
-
(1991)
International Journal of Production Economics
, vol.23
, pp. 17-24
-
-
Azizoglu, M.1
Kondakci, S.2
Kirca, O.3
-
5
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
10.1287/opre.38.1.22
-
K. R. Baker G. D. Scudder 1990 Sequencing with earliness and tardiness penalties: a review Operations Research 38 22 36 10.1287/opre.38.1.22
-
(1990)
Operations Research
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
6
-
-
0032671338
-
Scheduling maintenance and semiresumable jobs on a single machine
-
10.1002/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#
-
H. G. Graves C.-Y. Lee 1999 Scheduling maintenance and semiresumable jobs on a single machine Naval Research Logistics 46 845 863 10.1002/(SICI)1520- 6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#
-
(1999)
Naval Research Logistics
, vol.46
, pp. 845-863
-
-
Graves, H.G.1
Lee, C.-Y.2
-
8
-
-
57649175652
-
Lower bounds for tardiness minimization on a single machine with family setup times
-
I. Kacem 2007 Lower bounds for tardiness minimization on a single machine with family setup times International Journal of Operations Research 4 18 31
-
(2007)
International Journal of Operations Research
, vol.4
, pp. 18-31
-
-
Kacem, I.1
-
10
-
-
0000049036
-
Minimising the makespan in the two machine scheduling scheduling problem with an availability constraint
-
10.1016/S0167-6377(96)00041-7
-
C.-Y. Lee 1996 Minimising the makespan in the two machine scheduling scheduling problem with an availability constraint Operational Research Letters 20 129 139 10.1016/S0167-6377(96)00041-7
-
(1996)
Operational Research Letters
, vol.20
, pp. 129-139
-
-
Lee, C.-Y.1
-
11
-
-
0034159705
-
Scheduling jobs and maintenance activities on parallel machines
-
10.1002/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3
-
C.-Y. Lee Z.-L. Chen 2000 Scheduling jobs and maintenance activities on parallel machines Naval Research Logistics 47 145 165 10.1002/(SICI)1520- 6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3
-
(2000)
Naval Research Logistics
, vol.47
, pp. 145-165
-
-
Lee, C.-Y.1
Chen, Z.-L.2
-
12
-
-
0031076201
-
Single machine earliness and tardiness scheduling
-
G. Li 1997 Single machine earliness and tardiness scheduling European Journal of Operational Research 26 546 558
-
(1997)
European Journal of Operational Research
, vol.26
, pp. 546-558
-
-
Li, G.1
-
13
-
-
0033165933
-
A branch and bound algorithm for the single machine earliness and tardiness scheduling problem
-
10.1016/S0305-0548(98)00081-1
-
C.-F. Liaw 1999 A branch and bound algorithm for the single machine earliness and tardiness scheduling problem Computers & Operations Research 26 679 693 10.1016/S0305-0548(98)00081-1
-
(1999)
Computers & Operations Research
, vol.26
, pp. 679-693
-
-
Liaw, C.-F.1
-
14
-
-
33847618314
-
Minimising total earliness and tardiness on a single machine using a hybrid heuristic
-
10.1016/j.cor.2005.11.021
-
R. M'Halla 2006 Minimising total earliness and tardiness on a single machine using a hybrid heuristic Computers & Operation Research 34 3126 3142 10.1016/j.cor.2005.11.021
-
(2006)
Computers & Operation Research
, vol.34
, pp. 3126-3142
-
-
M'Halla, R.1
-
15
-
-
0000245614
-
The single machine early/tardy problem
-
10.1287/mnsc.35.2.177
-
P. S. Ow E. T. Morton 1989 The single machine early/tardy problem Management Science 35 331 342 10.1287/mnsc.35.2.177
-
(1989)
Management Science
, vol.35
, pp. 331-342
-
-
Ow, P.S.1
Morton, E.T.2
-
16
-
-
0022023671
-
A branch and bound algorithm for the total weighted tardiness problem
-
10.1287/opre.33.2.363
-
C. N. Potts L. N. Van Wassenhove 1984 A branch and bound algorithm for the total weighted tardiness problem Operations Research 33 363 377 10.1287/opre.33.2.363
-
(1984)
Operations Research
, vol.33
, pp. 363-377
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
17
-
-
0035371947
-
Single machine weighted earliness/tardiness penalty problem with a common due date
-
10.1016/S0305-0548(99)00153-7
-
A. M. Sakib K. S. Anup 2001 Single machine weighted earliness/tardiness penalty problem with a common due date Computers & Operation Research 28 649 669 10.1016/S0305-0548(99)00153-7
-
(2001)
Computers & Operation Research
, vol.28
, pp. 649-669
-
-
Sakib, A.M.1
Anup, K.S.2
-
18
-
-
40849083523
-
Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates
-
10.1016/j.ejor.2006.05.052
-
F. Sourd S. Keded-Sidhoum Y. Rio Solis 2008 Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates European Journal of Operational Research 189 1305 1319 10.1016/j.ejor.2006.05.052
-
(2008)
European Journal of Operational Research
, vol.189
, pp. 1305-1319
-
-
Sourd, F.1
Keded-Sidhoum, S.2
Rio Solis, Y.3
-
19
-
-
0002066821
-
Various optimizers for single-stage production
-
10.1002/nav.3800030106
-
W. E. Smith 1956 Various optimizers for single-stage production Naval Research Logistics Quarterly 3 59 66 10.1002/nav.3800030106
-
(1956)
Naval Research Logistics Quarterly
, vol.3
, pp. 59-66
-
-
Smith, W.E.1
-
20
-
-
11844270172
-
Combining column generation and lagrangean relaxation to solve a single-machine common due date problem
-
10.1287/ijoc.14.1.37.7706
-
M. Van den Akker J. A. Hoogeveen S. van deVelde 2002 Combining column generation and lagrangean relaxation to solve a single-machine common due date problem INFORMS Journal on Computing 14 37 51 10.1287/ijoc.14.1.37.7706
-
(2002)
INFORMS Journal on Computing
, vol.14
, pp. 37-51
-
-
Van Den Akker, M.1
Hoogeveen, J.A.2
Van Develde, S.3
-
21
-
-
77949457036
-
Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties
-
10.1504/EJIE.2010.029572
-
J. M. S. Valente J. E. Shaller 2010 Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties European Journal of Industrial Engineering 4 99 129 10.1504/EJIE.2010.029572
-
(2010)
European Journal of Industrial Engineering
, vol.4
, pp. 99-129
-
-
Valente, J.M.S.1
Shaller, J.E.2
-
22
-
-
84969451575
-
Heuristics for the single machine scheduling problem with early and quadratic tardy penalties
-
J. M. S. Valente 2010 Heuristics for the single machine scheduling problem with early and quadratic tardy penalties European Journal Industrial Engineering 4 431 448
-
(2010)
European Journal Industrial Engineering
, vol.4
, pp. 431-448
-
-
Valente, J.M.S.1
|