메뉴 건너뛰기




Volumn 23, Issue 4, 2012, Pages 1207-1224

Earliness-tardiness minimization on a single machine to schedule preventive maintenance tasks: Metaheuristic and exact methods

Author keywords

Branch and bound; Genetic algorithm (GA); Linear programming; Local search; Maintenance; Scheduling

Indexed keywords

BRANCH AND BOUNDS; COMPUTATIONAL EXPERIMENT; COMPUTATIONAL RESULTS; EARLINESS-TARDINESS; EXACT METHODS; LOCAL SEARCH; MAINTENANCE RESOURCES; MAINTENANCE TASKS; META HEURISTIC ALGORITHM; META HEURISTICS; METAHEURISTIC; SCHEDULING PROBLEM; TOTAL PREVENTIVE MAINTENANCE;

EID: 84865270625     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-010-0425-0     Document Type: Article
Times cited : (32)

References (22)
  • 2
    • 33947276768 scopus 로고    scopus 로고
    • An integrated production and preventive maintenance planning model
    • 10.1016/j.ejor.2006.06.032
    • E. H. Aghezzaf M. A. Jamali D. Ait-Kadi 2007 An integrated production and preventive maintenance planning model European Journal of Operational Research 181 679 685 10.1016/j.ejor.2006.06.032
    • (2007) European Journal of Operational Research , vol.181 , pp. 679-685
    • Aghezzaf, E.H.1    Jamali, M.A.2    Ait-Kadi, D.3
  • 3
    • 45849131693 scopus 로고    scopus 로고
    • Integrated production planning and preventive maintenance in deteriorating production systems
    • 10.1016/j.ins.2008.05.007
    • E. H. Aghezzaf N. M. Najid 2008 Integrated production planning and preventive maintenance in deteriorating production systems Information Sciences 178 3382 3392 10.1016/j.ins.2008.05.007
    • (2008) Information Sciences , vol.178 , pp. 3382-3392
    • Aghezzaf, E.H.1    Najid, N.M.2
  • 4
    • 0026243299 scopus 로고
    • Bicriteria scheduling problem involving total tardiness and total earliness penalties
    • 10.1016/0925-5273(91)90044-T
    • M. Azizoglu S. Kondakci O. Kirca 1991 Bicriteria scheduling problem involving total tardiness and total earliness penalties International Journal of Production Economics 23 17 24 10.1016/0925-5273(91)90044-T
    • (1991) International Journal of Production Economics , vol.23 , pp. 17-24
    • Azizoglu, M.1    Kondakci, S.2    Kirca, O.3
  • 5
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • 10.1287/opre.38.1.22
    • K. R. Baker G. D. Scudder 1990 Sequencing with earliness and tardiness penalties: a review Operations Research 38 22 36 10.1287/opre.38.1.22
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 6
    • 0032671338 scopus 로고    scopus 로고
    • Scheduling maintenance and semiresumable jobs on a single machine
    • 10.1002/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#
    • H. G. Graves C.-Y. Lee 1999 Scheduling maintenance and semiresumable jobs on a single machine Naval Research Logistics 46 845 863 10.1002/(SICI)1520- 6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#
    • (1999) Naval Research Logistics , vol.46 , pp. 845-863
    • Graves, H.G.1    Lee, C.-Y.2
  • 8
    • 57649175652 scopus 로고    scopus 로고
    • Lower bounds for tardiness minimization on a single machine with family setup times
    • I. Kacem 2007 Lower bounds for tardiness minimization on a single machine with family setup times International Journal of Operations Research 4 18 31
    • (2007) International Journal of Operations Research , vol.4 , pp. 18-31
    • Kacem, I.1
  • 10
    • 0000049036 scopus 로고    scopus 로고
    • Minimising the makespan in the two machine scheduling scheduling problem with an availability constraint
    • 10.1016/S0167-6377(96)00041-7
    • C.-Y. Lee 1996 Minimising the makespan in the two machine scheduling scheduling problem with an availability constraint Operational Research Letters 20 129 139 10.1016/S0167-6377(96)00041-7
    • (1996) Operational Research Letters , vol.20 , pp. 129-139
    • Lee, C.-Y.1
  • 11
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • 10.1002/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3
    • C.-Y. Lee Z.-L. Chen 2000 Scheduling jobs and maintenance activities on parallel machines Naval Research Logistics 47 145 165 10.1002/(SICI)1520- 6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3
    • (2000) Naval Research Logistics , vol.47 , pp. 145-165
    • Lee, C.-Y.1    Chen, Z.-L.2
  • 12
    • 0031076201 scopus 로고    scopus 로고
    • Single machine earliness and tardiness scheduling
    • G. Li 1997 Single machine earliness and tardiness scheduling European Journal of Operational Research 26 546 558
    • (1997) European Journal of Operational Research , vol.26 , pp. 546-558
    • Li, G.1
  • 13
    • 0033165933 scopus 로고    scopus 로고
    • A branch and bound algorithm for the single machine earliness and tardiness scheduling problem
    • 10.1016/S0305-0548(98)00081-1
    • C.-F. Liaw 1999 A branch and bound algorithm for the single machine earliness and tardiness scheduling problem Computers & Operations Research 26 679 693 10.1016/S0305-0548(98)00081-1
    • (1999) Computers & Operations Research , vol.26 , pp. 679-693
    • Liaw, C.-F.1
  • 14
    • 33847618314 scopus 로고    scopus 로고
    • Minimising total earliness and tardiness on a single machine using a hybrid heuristic
    • 10.1016/j.cor.2005.11.021
    • R. M'Halla 2006 Minimising total earliness and tardiness on a single machine using a hybrid heuristic Computers & Operation Research 34 3126 3142 10.1016/j.cor.2005.11.021
    • (2006) Computers & Operation Research , vol.34 , pp. 3126-3142
    • M'Halla, R.1
  • 15
    • 0000245614 scopus 로고
    • The single machine early/tardy problem
    • 10.1287/mnsc.35.2.177
    • P. S. Ow E. T. Morton 1989 The single machine early/tardy problem Management Science 35 331 342 10.1287/mnsc.35.2.177
    • (1989) Management Science , vol.35 , pp. 331-342
    • Ow, P.S.1    Morton, E.T.2
  • 16
    • 0022023671 scopus 로고
    • A branch and bound algorithm for the total weighted tardiness problem
    • 10.1287/opre.33.2.363
    • C. N. Potts L. N. Van Wassenhove 1984 A branch and bound algorithm for the total weighted tardiness problem Operations Research 33 363 377 10.1287/opre.33.2.363
    • (1984) Operations Research , vol.33 , pp. 363-377
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 17
    • 0035371947 scopus 로고    scopus 로고
    • Single machine weighted earliness/tardiness penalty problem with a common due date
    • 10.1016/S0305-0548(99)00153-7
    • A. M. Sakib K. S. Anup 2001 Single machine weighted earliness/tardiness penalty problem with a common due date Computers & Operation Research 28 649 669 10.1016/S0305-0548(99)00153-7
    • (2001) Computers & Operation Research , vol.28 , pp. 649-669
    • Sakib, A.M.1    Anup, K.S.2
  • 18
    • 40849083523 scopus 로고    scopus 로고
    • Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates
    • 10.1016/j.ejor.2006.05.052
    • F. Sourd S. Keded-Sidhoum Y. Rio Solis 2008 Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates European Journal of Operational Research 189 1305 1319 10.1016/j.ejor.2006.05.052
    • (2008) European Journal of Operational Research , vol.189 , pp. 1305-1319
    • Sourd, F.1    Keded-Sidhoum, S.2    Rio Solis, Y.3
  • 19
    • 0002066821 scopus 로고
    • Various optimizers for single-stage production
    • 10.1002/nav.3800030106
    • W. E. Smith 1956 Various optimizers for single-stage production Naval Research Logistics Quarterly 3 59 66 10.1002/nav.3800030106
    • (1956) Naval Research Logistics Quarterly , vol.3 , pp. 59-66
    • Smith, W.E.1
  • 20
    • 11844270172 scopus 로고    scopus 로고
    • Combining column generation and lagrangean relaxation to solve a single-machine common due date problem
    • 10.1287/ijoc.14.1.37.7706
    • M. Van den Akker J. A. Hoogeveen S. van deVelde 2002 Combining column generation and lagrangean relaxation to solve a single-machine common due date problem INFORMS Journal on Computing 14 37 51 10.1287/ijoc.14.1.37.7706
    • (2002) INFORMS Journal on Computing , vol.14 , pp. 37-51
    • Van Den Akker, M.1    Hoogeveen, J.A.2    Van Develde, S.3
  • 21
    • 77949457036 scopus 로고    scopus 로고
    • Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties
    • 10.1504/EJIE.2010.029572
    • J. M. S. Valente J. E. Shaller 2010 Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties European Journal of Industrial Engineering 4 99 129 10.1504/EJIE.2010.029572
    • (2010) European Journal of Industrial Engineering , vol.4 , pp. 99-129
    • Valente, J.M.S.1    Shaller, J.E.2
  • 22
    • 84969451575 scopus 로고    scopus 로고
    • Heuristics for the single machine scheduling problem with early and quadratic tardy penalties
    • J. M. S. Valente 2010 Heuristics for the single machine scheduling problem with early and quadratic tardy penalties European Journal Industrial Engineering 4 431 448
    • (2010) European Journal Industrial Engineering , vol.4 , pp. 431-448
    • Valente, J.M.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.