메뉴 건너뛰기




Volumn 24, Issue 10, 1997, Pages 955-960

Scheduling in stochastic flowshops with independent setup, processing and removal times

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; PROBLEM SOLVING; PROCESS CONTROL; RANDOM PROCESSES; SCHEDULING;

EID: 0031258858     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(97)00006-3     Document Type: Article
Times cited : (31)

References (14)
  • 1
    • 0003075019 scopus 로고
    • Optimal two and three-stage production schedules with setup times included
    • Johnson, S. M., Optimal two and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1954, 1, 69-81.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 69-81
    • Johnson, S.M.1
  • 2
    • 0020177876 scopus 로고
    • Sequencing n jobs on two machines with setup, processing and removal times separated
    • Sule, D. R., Sequencing n jobs on two machines with setup, processing and removal times separated. Naval Research Logistics Quarterly, 1982, 29(3), 517-519.
    • (1982) Naval Research Logistics Quarterly , vol.29 , Issue.3 , pp. 517-519
    • Sule, D.R.1
  • 3
    • 0029632622 scopus 로고
    • Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
    • Allahverdi, A. and Mittenthal, J., Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function. European Journal of Operational Research , 1995, 81, 376-387.
    • (1995) European Journal of Operational Research , vol.81 , pp. 376-387
    • Allahverdi, A.1    Mittenthal, J.2
  • 4
    • 0018520161 scopus 로고
    • Optimal two-stage production scheduling with setup times separated
    • Yoshida, T. and Hitomi, K., Optimal two-stage production scheduling with setup times separated . AIIE Transactions, 1979, 11(3), 261-263.
    • (1979) AIIE Transactions , vol.11 , Issue.3 , pp. 261-263
    • Yoshida, T.1    Hitomi, K.2
  • 5
    • 0020816005 scopus 로고
    • Sequencing on two and three machines with setup, processing and removal times separated
    • Sule, D. R. and Huang, K. Y., Sequencing on two and three machines with setup, processing and removal times separated, . International Journal of Production Research , 1983, 21(5), 723-732.
    • (1983) International Journal of Production Research , vol.21 , Issue.5 , pp. 723-732
    • Sule, D.R.1    Huang, K.Y.2
  • 6
    • 0029343965 scopus 로고
    • Two-stage production scheduling with separated set-up times and stochastic breakdowns
    • Allahverdi, A., Two-stage production scheduling with separated set-up times and stochastic breakdowns. Journal of the Operational Research Society , 1995, 46, 896-904.
    • (1995) Journal of the Operational Research Society , vol.46 , pp. 896-904
    • Allahverdi, A.1
  • 7
    • 0030270129 scopus 로고    scopus 로고
    • Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
    • Allahverdi, A., Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Computers & Operations Research , 1996, 23, 909-916.
    • (1996) Computers & Operations Research , vol.23 , pp. 909-916
    • Allahverdi, A.1
  • 8
    • 0025493441 scopus 로고
    • Stochastic minimization of the makespan in flowshops with identical machines and buffers of arbitrary size
    • Kijima, M., Makimoto, N. and Shirakawa, H., Stochastic minimization of the makespan in flowshops with identical machines and buffers of arbitrary size. Operations Research , 1990, 38, 924-928.
    • (1990) Operations Research , vol.38 , pp. 924-928
    • Kijima, M.1    Makimoto, N.2    Shirakawa, H.3
  • 9
    • 0019899745 scopus 로고
    • Minimizing the expected makespan in stochastic flowshops
    • Pinedo, M., Minimizing the expected makespan in stochastic flowshops. Operations Research , 1982, 30, 148-162.
    • (1982) Operations Research , vol.30 , pp. 148-162
    • Pinedo, M.1
  • 11
    • 0021585421 scopus 로고
    • Stochastically minimizing the makespan in flowshops
    • Foley, R. D. and Suresh, S., Stochastically minimizing the makespan in flowshops. Naval Research Logistics Quarterly , 1984, 31, 551-557.
    • (1984) Naval Research Logistics Quarterly , vol.31 , pp. 551-557
    • Foley, R.D.1    Suresh, S.2
  • 12
    • 0022659628 scopus 로고
    • Scheduling n nonoverlapping jobs and two stochastic jobs in a flowshop
    • Foley, R. D. and Suresh, S., Scheduling n nonoverlapping jobs and two stochastic jobs in a flowshop. Naval Research Logistics Quarterly , 1986, 33, 123-128.
    • (1986) Naval Research Logistics Quarterly , vol.33 , pp. 123-128
    • Foley, R.D.1    Suresh, S.2
  • 13
    • 0022569338 scopus 로고
    • On Johnson's two-machine flowshop with random processing times
    • Ku, P. S. and Niu, S. C., On Johnson's two-machine flowshop with random processing times. Operations Research , 1986, 34, 130-136.
    • (1986) Operations Research , vol.34 , pp. 130-136
    • Ku, P.S.1    Niu, S.C.2
  • 14
    • 38149147609 scopus 로고
    • Two-machine ordered flowshop scheduling under random breakdowns
    • Allahverdi, A. and Mittenthal, J., Two-machine ordered flowshop scheduling under random breakdowns, . Mathematical and Computer Modelling, 1994, 20(2), 9-17.
    • (1994) Mathematical and Computer Modelling , vol.20 , Issue.2 , pp. 9-17
    • Allahverdi, A.1    Mittenthal, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.