-
1
-
-
0003075019
-
Optimal two and three-stage production schedules with setup times included
-
Johnson, S. M., Optimal two and three-stage production schedules with setup times included. Naval Research Logistics Quarterly, 1954, 1, 69-81.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 69-81
-
-
Johnson, S.M.1
-
2
-
-
0020177876
-
Sequencing n jobs on two machines with setup, processing and removal times separated
-
Sule, D. R., Sequencing n jobs on two machines with setup, processing and removal times separated. Naval Research Logistics Quarterly, 1982, 29(3), 517-519.
-
(1982)
Naval Research Logistics Quarterly
, vol.29
, Issue.3
, pp. 517-519
-
-
Sule, D.R.1
-
3
-
-
0029632622
-
Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
-
Allahverdi, A. and Mittenthal, J., Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function. European Journal of Operational Research , 1995, 81, 376-387.
-
(1995)
European Journal of Operational Research
, vol.81
, pp. 376-387
-
-
Allahverdi, A.1
Mittenthal, J.2
-
4
-
-
0018520161
-
Optimal two-stage production scheduling with setup times separated
-
Yoshida, T. and Hitomi, K., Optimal two-stage production scheduling with setup times separated . AIIE Transactions, 1979, 11(3), 261-263.
-
(1979)
AIIE Transactions
, vol.11
, Issue.3
, pp. 261-263
-
-
Yoshida, T.1
Hitomi, K.2
-
5
-
-
0020816005
-
Sequencing on two and three machines with setup, processing and removal times separated
-
Sule, D. R. and Huang, K. Y., Sequencing on two and three machines with setup, processing and removal times separated, . International Journal of Production Research , 1983, 21(5), 723-732.
-
(1983)
International Journal of Production Research
, vol.21
, Issue.5
, pp. 723-732
-
-
Sule, D.R.1
Huang, K.Y.2
-
6
-
-
0029343965
-
Two-stage production scheduling with separated set-up times and stochastic breakdowns
-
Allahverdi, A., Two-stage production scheduling with separated set-up times and stochastic breakdowns. Journal of the Operational Research Society , 1995, 46, 896-904.
-
(1995)
Journal of the Operational Research Society
, vol.46
, pp. 896-904
-
-
Allahverdi, A.1
-
7
-
-
0030270129
-
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
-
Allahverdi, A., Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Computers & Operations Research , 1996, 23, 909-916.
-
(1996)
Computers & Operations Research
, vol.23
, pp. 909-916
-
-
Allahverdi, A.1
-
8
-
-
0025493441
-
Stochastic minimization of the makespan in flowshops with identical machines and buffers of arbitrary size
-
Kijima, M., Makimoto, N. and Shirakawa, H., Stochastic minimization of the makespan in flowshops with identical machines and buffers of arbitrary size. Operations Research , 1990, 38, 924-928.
-
(1990)
Operations Research
, vol.38
, pp. 924-928
-
-
Kijima, M.1
Makimoto, N.2
Shirakawa, H.3
-
9
-
-
0019899745
-
Minimizing the expected makespan in stochastic flowshops
-
Pinedo, M., Minimizing the expected makespan in stochastic flowshops. Operations Research , 1982, 30, 148-162.
-
(1982)
Operations Research
, vol.30
, pp. 148-162
-
-
Pinedo, M.1
-
10
-
-
0025498911
-
Single-machine scheduling subject to stochastic breakdowns
-
Birge, J., Frenk, J. B. G., Mittenthal, J. and Rinnooy Kan, A. H. G., Single-machine scheduling subject to stochastic breakdowns. Naval Research Logistics , 1990, 37, 661-677.
-
(1990)
Naval Research Logistics
, vol.37
, pp. 661-677
-
-
Birge, J.1
Frenk, J.B.G.2
Mittenthal, J.3
Rinnooy Kan, A.H.G.4
-
11
-
-
0021585421
-
Stochastically minimizing the makespan in flowshops
-
Foley, R. D. and Suresh, S., Stochastically minimizing the makespan in flowshops. Naval Research Logistics Quarterly , 1984, 31, 551-557.
-
(1984)
Naval Research Logistics Quarterly
, vol.31
, pp. 551-557
-
-
Foley, R.D.1
Suresh, S.2
-
12
-
-
0022659628
-
Scheduling n nonoverlapping jobs and two stochastic jobs in a flowshop
-
Foley, R. D. and Suresh, S., Scheduling n nonoverlapping jobs and two stochastic jobs in a flowshop. Naval Research Logistics Quarterly , 1986, 33, 123-128.
-
(1986)
Naval Research Logistics Quarterly
, vol.33
, pp. 123-128
-
-
Foley, R.D.1
Suresh, S.2
-
13
-
-
0022569338
-
On Johnson's two-machine flowshop with random processing times
-
Ku, P. S. and Niu, S. C., On Johnson's two-machine flowshop with random processing times. Operations Research , 1986, 34, 130-136.
-
(1986)
Operations Research
, vol.34
, pp. 130-136
-
-
Ku, P.S.1
Niu, S.C.2
-
14
-
-
38149147609
-
Two-machine ordered flowshop scheduling under random breakdowns
-
Allahverdi, A. and Mittenthal, J., Two-machine ordered flowshop scheduling under random breakdowns, . Mathematical and Computer Modelling, 1994, 20(2), 9-17.
-
(1994)
Mathematical and Computer Modelling
, vol.20
, Issue.2
, pp. 9-17
-
-
Allahverdi, A.1
Mittenthal, J.2
|