메뉴 건너뛰기




Volumn 23, Issue 6, 2012, Pages 2271-2280

Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints

Author keywords

Dispatching; Flow shop with multiple processors; Heuristic algorithm; Makespan; Mixed integer programming; Scheduling

Indexed keywords

COMPUTATIONAL EXPERIMENT; DISPATCHING; DISPATCHING RULES; FIRST-IN-FIRST-OUT; FLOW SHOP WITH MULTIPLE PROCESSORS; HEURISTIC APPROACH; LOCAL SEARCH HEURISTICS; MACHINE ELIGIBILITY CONSTRAINT; MAKESPAN; MIXED INTEGER PROGRAMMING; PARALLEL BATCH; RELEASE TIME; REOPTIMIZATION; SCHEDULING PROBLEM; SEMICONDUCTOR MANUFACTURING INDUSTRY; TWO-STAGE HYBRID FLOW SHOP;

EID: 84870869927     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-011-0571-z     Document Type: Article
Times cited : (32)

References (14)
  • 1
    • 56749182367 scopus 로고    scopus 로고
    • Scheduling hybrid flowshop with parallel batching machines and compatibilities
    • Bellanger, A., & Oulamara, A. (2009). Scheduling hybrid flowshop with parallel batching machines and compatibilities. Computers and Operations Research, 36, 982-1992.
    • (2009) Computers and Operations Research , vol.36 , pp. 982-1992
    • Bellanger, A.1    Oulamara, A.2
  • 2
    • 1242265218 scopus 로고    scopus 로고
    • Minimizing makespan on parallel machines with release time and machine eligibility restrictions
    • Centeno, G., & Armacost, R. L. (2004). Minimizing makespan on parallel machines with release time and machine eligibility restrictions. International Journal of Production Research, 42, 1243-1256.
    • (2004) International Journal of Production Research , vol.42 , pp. 1243-1256
    • Centeno, G.1    Armacost, R.L.2
  • 3
    • 0035000239 scopus 로고    scopus 로고
    • The batch loading and scheduling problem
    • Dobson, G., & Nambimadom, R. S. (2001). The batch loading and scheduling problem. Operations Research, 49, 52-65.
    • (2001) Operations Research , vol.49 , pp. 52-65
    • Dobson, G.1    Nambimadom, R.S.2
  • 6
    • 0028766172 scopus 로고
    • Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment
    • Hunsucker, J. L., & Shah, J. R. (1994). Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment. European Journal of Operational Research, 72, 102-114.
    • (1994) European Journal of Operational Research , vol.72 , pp. 102-114
    • Hunsucker, J.L.1    Shah, J.R.2
  • 7
    • 34548626399 scopus 로고    scopus 로고
    • A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes
    • Kashan, A. H., Karimi, B., & Jenabi, M. (2008). A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes. Computers and Operations Research, 35, 1084-1098.
    • (2008) Computers and Operations Research , vol.35 , pp. 1084-1098
    • Kashan, A.H.1    Karimi, B.2    Jenabi, M.3
  • 8
    • 34547778459 scopus 로고    scopus 로고
    • Simulation metamodel development using uniform design and neural networks for automated material handling systems in semiconductor wafer fabrication
    • Kuo, Y., Yang, T., Peters, B. A., & Chang, I. (2007). Simulation metamodel development using uniform design and neural networks for automated material handling systems in semiconductor wafer fabrication. Simulation Modeling Practice and Theory, 15, 1002-1015.
    • (2007) Simulation Modeling Practice and Theory , vol.15 , pp. 1002-1015
    • Kuo, Y.1    Yang, T.2    Peters, B.A.3    Chang, I.4
  • 9
    • 0031077278 scopus 로고    scopus 로고
    • Scheduling with agreeable release times and due dates on a batch processing machine
    • Li, C. L., & Lee, C. Y. (1997). Scheduling with agreeable release times and due dates on a batch processing machine. European Journal of Operational Research, 96, 564-569.
    • (1997) European Journal of Operational Research , vol.96 , pp. 564-569
    • Li, C.L.1    Lee, C.Y.2
  • 10
    • 33847709085 scopus 로고    scopus 로고
    • A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families
    • Malve, S., & Uzsoy, R. (2007). A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families. Computer and Operations Research, 34, 3016-3028.
    • (2007) Computer and Operations Research , vol.34 , pp. 3016-3028
    • Malve, S.1    Uzsoy, R.2
  • 11
    • 33746921229 scopus 로고    scopus 로고
    • A literature review, classification and simple meta-Analysis on scheduling of batch processors in semiconductor
    • Mathirajan, M., & Sivakumar, A. I. (2006). A literature review, classification and simple meta-Analysis on scheduling of batch processors in semiconductor. International Journal of Advanced Manufacturing Technology, 29, 990-1001.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , pp. 990-1001
    • Mathirajan, M.1    Sivakumar, A.I.2
  • 12
    • 0036497435 scopus 로고    scopus 로고
    • A fuzzy logic based methodology to rank shop floor dispatch rules
    • Petroni, A., & Rizzi, A. (2002). A fuzzy logic based methodology to rank shop floor dispatch rules. International Journal of Production Economics, 76, 99-108.
    • (2002) International Journal of Production Economics , vol.76 , pp. 99-108
    • Petroni, A.1    Rizzi, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.