-
1
-
-
33846194282
-
An intelligent process planning system for prismatic parts using STEP features
-
Amaitik, S. M., and S. E. Kili?. 2007. "An Intelligent Process Planning System for Prismatic Parts Using STEP Features." The International Journal of Advanced Manufacturing Technology 31: 978-993. doi:10.1007/s00170-005-0269-5.
-
(2007)
The International Journal of Advanced Manufacturing Technology
, vol.31
, pp. 978-993
-
-
Amaitik, S.M.1
Kili, S.E.2
-
2
-
-
0004176585
-
-
London: Chapman & Hall
-
Bauer, A., R. Bowden, J. Browne, J. Duggan, and G. Lyons. 1994. Shop Floor Control Systems -From Design to Implementation. London: Chapman & Hall.
-
(1994)
Shop Floor Control Systems -From Design to Implementation
-
-
Bauer, A.1
Bowden, R.2
Browne, J.3
Duggan, J.4
Lyons, G.5
-
3
-
-
0000955243
-
A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling
-
Brandimarte, P., and M. Calderini. 1995. "A Hierarchical Bicriterion Approach to Integrated Process Plan Selection and Job Shop Scheduling." International Journal of Production Research 33 (1): 161-181. doi:10.1080/00207549508930142.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.1
, pp. 161-181
-
-
Brandimarte, P.1
Calderini, M.2
-
4
-
-
36249009507
-
Adaptive setup planning of prismatic parts for machine tools with varying configurations
-
Cai, N., L. Wang, and H.-Y. Feng. 2008. "Adaptive Setup Planning of Prismatic Parts for Machine Tools with Varying Configurations." International Journal of Production Research 46 (3): 571-594. doi:10.1080/00207540600849125.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.3
, pp. 571-594
-
-
Cai, N.1
Wang, L.2
Feng, H.-Y.3
-
5
-
-
70449585726
-
GA-based adaptive setup planning toward process planning and scheduling integration
-
Cai, N., L. Wang, and H.-Y. Feng. 2009. "GA-Based Adaptive Setup Planning toward Process Planning and Scheduling Integration." International Journal of Production Research 47 (10): 2745-2766. doi:10.1080/00207540701663516.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.10
, pp. 2745-2766
-
-
Cai, N.1
Wang, L.2
Feng, H.-Y.3
-
6
-
-
84863785857
-
Nested partitions for global optimization in nonlinear model predictive control
-
Chauhdry, H. M., and P. B. Luh. 2012. "Nested Partitions for Global Optimization in Nonlinear Model Predictive Control." Control Engineering Practice 20: 869-881. doi:10.1016/j.conengprac.2012.05.003.
-
(2012)
Control Engineering Practice
, vol.20
, pp. 869-881
-
-
Chauhdry, H.M.1
Luh, P.B.2
-
7
-
-
77957121799
-
Metaheuristics to minimise makespan on parallel batch processing machines with dynamic job arrivals
-
Chen, H., B. Du, and G. Q. Huang. 2010. "Metaheuristics to Minimise Makespan on Parallel Batch Processing Machines with Dynamic Job Arrivals." International Journal of Computer Integrated Manufacturing 23 (10): 942-956. doi:10.1080/0951192X.2010.495137.
-
(2010)
International Journal of Computer Integrated Manufacturing
, vol.23
, Issue.10
, pp. 942-956
-
-
Chen, H.1
Du, B.2
Huang, G.Q.3
-
8
-
-
0032045604
-
Setup planning using hopfield net and simulated annealing
-
Chen, J., Y. F. Zhang, and A. Y. C. Nee. 1998. "Setup Planning Using Hopfield Net and Simulated Annealing." International Journal of Production Research 36 (4): 981-1000. doi:10.1080/002075498193480.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.4
, pp. 981-1000
-
-
Chen, J.1
Zhang, Y.F.2
Nee, A.Y.C.3
-
9
-
-
33746031638
-
Integration of process planning and scheduling functions
-
Chen, Q., and B. Khoshnevis. 1990. "Integration of Process Planning and Scheduling Functions." Journal of Intelligent Manufacturing 1 (3): 165-176.
-
(1990)
Journal of Intelligent Manufacturing
, vol.1
, Issue.3
, pp. 165-176
-
-
Chen, Q.1
Khoshnevis, B.2
-
10
-
-
84876152333
-
Scheduling with flexible process plans
-
Chen, Q., and B. Khoshnevis. 1993. "Scheduling with Flexible Process Plans." Production Planning and Control 4 (4): 333-343. doi:10.1080/09537289308919455.
-
(1993)
Production Planning and Control
, vol.4
, Issue.4
, pp. 333-343
-
-
Chen, Q.1
Khoshnevis, B.2
-
11
-
-
55749109213
-
Differentiated service inventory optimization using nested partitions and MOCBA
-
Chew, E. P., H.-L. Lee, S. Teng, and H.-C. Koh. 2009. "Differentiated Service Inventory Optimization Using Nested Partitions and MOCBA." Computers & Operations Research 36 (5): 1703-1710. doi:10.1016/j.cor.2008.04.006.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.5
, pp. 1703-1710
-
-
Chew, E.P.1
Lee, H.-L.2
Teng, S.3
Koh, H.-C.4
-
13
-
-
2042481348
-
Machine capability and fixturing constraints-imposed automatic machining setups generation
-
Gologlu, C. 2004. "Machine Capability and Fixturing Constraints-Imposed Automatic Machining Setups Generation." Journal of Materials Processing Technology 148 (1): 83-92. doi:10.1016/j.jmatprotec.2004.01.043.
-
(2004)
Journal of Materials Processing Technology
, vol.148
, Issue.1
, pp. 83-92
-
-
Gologlu, C.1
-
14
-
-
42449093835
-
Setup planning for machining the features of prismatic parts
-
Hebbal, S. S., and N. K. Mehta. 2008. "Setup Planning for Machining the Features of Prismatic Parts." International Journal of Production Research 46 (12): 3241-3257. doi:10.1080/00207540601070937.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.12
, pp. 3241-3257
-
-
Hebbal, S.S.1
Mehta, N.K.2
-
15
-
-
0344584403
-
Automatic setup planning for metal cutting: An integrated methodology
-
Huang, S. H., and N. Xu. 2003. "Automatic Setup Planning for Metal Cutting: An Integrated Methodology." International Journal of Production Research 41 (18): 4339-4356. doi:10.1080/0020754031000153351.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.18
, pp. 4339-4356
-
-
Huang, S.H.1
Xu, N.2
-
16
-
-
79251627866
-
A progressive approach for the integration of process planning and scheduling
-
Huang, S. H., H.-C. Zhang, and M. L. Smith. 1995. "A Progressive Approach for the Integration of Process Planning and Scheduling." IIE Transactions 27 (4): 456-464. doi:10.1080/07408179508936762.
-
(1995)
IIE Transactions
, vol.27
, Issue.4
, pp. 456-464
-
-
Huang, S.H.1
Zhang, H.-C.2
Smith, M.L.3
-
18
-
-
0037410965
-
A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
-
Kim, Y. K., K. Park, and J. Ko. 2003. "A Symbiotic Evolutionary Algorithm for the Integration of Process Planning and Job Shop Scheduling." Computers and Operations Research 30 (8): 1151-1171. doi:10.1016/S0305-0548(02)00063-1.
-
(2003)
Computers and Operations Research
, vol.30
, Issue.8
, pp. 1151-1171
-
-
Kim, Y.K.1
Park, K.2
Ko, J.3
-
19
-
-
33751504128
-
A simulated annealing-based optimization approach for integrated process planning and scheduling
-
Li, W. D., and C. A. McMahon. 2007. "A Simulated Annealing-Based Optimization Approach for Integrated Process Planning and Scheduling." International Journal of Computer Integrated Manufacturing 20 (1): 80-95. doi:10.1080/09511920600667366.
-
(2007)
International Journal of Computer Integrated Manufacturing
, vol.20
, Issue.1
, pp. 80-95
-
-
Li, W.D.1
McMahon, C.A.2
-
20
-
-
33947229517
-
Sequencing of interacting prismatic machining features for process planning
-
Li, Z., and L. Wang. 2007. "Sequencing of Interacting Prismatic Machining Features for Process Planning." Computers in Industry 58: 295-303. doi:10.1016/j.compind.2006.07.003.
-
(2007)
Computers in Industry
, vol.58
, pp. 295-303
-
-
Li, Z.1
Wang, L.2
-
21
-
-
0032642660
-
Genetic algorithms in integrated process planning and scheduling
-
Morad, N., and A. Zalzala. 1999. "Genetic Algorithms in Integrated Process Planning and Scheduling." Journal of Intelligent Manufacturing 10 (2): 169-179. doi:10.1023/A:1008976720878.
-
(1999)
Journal of Intelligent Manufacturing
, vol.10
, Issue.2
, pp. 169-179
-
-
Morad, N.1
Zalzala, A.2
-
22
-
-
0034427464
-
Optimal selection probability in the two-stage nested partitions method for simulation-based optimization
-
Ólafsson, S., and N. Gopinath 2000 Optimal Selection Probability in the Two-Stage Nested Partitions Method For Simulation-Based Optimization In Proceedings of the 2000 Winter Simulation Conference. Doi:10.1109/WSC.2000.899787.
-
(2000)
Proceedings of the 2000 Winter Simulation Conference
-
-
Ólafsson, S.1
Gopinath, N.2
-
23
-
-
0037115840
-
Hybrid GA and SA dynamic setup planning optimization
-
Ong, S. K., J. Ding, and A. Y. C. Nee. 2002. "Hybrid GA and SA Dynamic Setup Planning Optimization." International Journal of Production Research 40 (18): 4697-4719. doi:10.1080/00207540210155864.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.18
, pp. 4697-4719
-
-
Ong, S.K.1
Ding, J.2
Nee, A.Y.C.3
-
24
-
-
0032648655
-
Integrating flexible process plans with scheduling in flexible manufacturing systems
-
Saygin, C., and S. E. Kilic. 1999. "Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems." The International Journal of Advanced Manufacturing Technology 15 (4): 268-280. doi:10.1007/s001700050066.
-
(1999)
The International Journal of Advanced Manufacturing Technology
, vol.15
, Issue.4
, pp. 268-280
-
-
Saygin, C.1
Kilic, S.E.2
-
25
-
-
80052993037
-
Agent-based distributed manufacturing process planning and scheduling: A state- of - The-art survey
-
Shen, W., L. Wang, and Q. Hao. 2006. "Agent-Based Distributed Manufacturing Process Planning and Scheduling: A State- Of-The-Art Survey." IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) 36 (4): 563-577. doi:10.1109/TSMCC.2006.874022.
-
(2006)
IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews)
, vol.36
, Issue.4
, pp. 563-577
-
-
Shen, W.1
Wang, L.2
Hao, Q.3
-
26
-
-
0033307339
-
Simultaneous simulation experiments and nested partition for discrete resource allocation in supply chain management
-
Shi, L., C. H. Chen, E. Yucesan, P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans. 1999. Simultaneous Simulation Experiments and Nested Partition For Discrete Resource Allocation in Supply Chain Management." In Proceedings of the I999 Winter Simulation Conference. doi:10.1145/324138.324257.
-
(1999)
Proceedings of the I999 Winter Simulation Conference
-
-
Shi, L.1
Chen, C.H.2
Yucesan, E.3
Farrington, P.A.4
Nembhard, H.B.5
Sturrock, D.T.6
Evans, G.W.7
-
27
-
-
42949178687
-
A nested partitions framework for solving large-scale multicommodity facility location problems
-
Shi, L., R. R. Meyer, M. Bozbay, and A. J. Miller. 2004. "A Nested Partitions Framework for Solving Large-Scale Multicommodity Facility Location Problems." Journal of Systems Science and Systems Engineering 13 (2): 158-179. doi:10.1007/s11518-006-0159-x.
-
(2004)
Journal of Systems Science and Systems Engineering
, vol.13
, Issue.2
, pp. 158-179
-
-
Shi, L.1
Meyer, R.R.2
Bozbay, M.3
Miller, A.J.4
-
28
-
-
0034179713
-
Nested partitions method for global optimization
-
Shi, L., and S. Ólafsson. 2000. "Nested Partitions Method for Global Optimization." Operations Researches 48 (3): 390-407. doi:10.1287/opre.48.3.390.12436.
-
(2000)
Operations Researches
, vol.48
, Issue.3
, pp. 390-407
-
-
Shi, L.1
Ólafsson, S.2
-
29
-
-
0032782385
-
New parallel randomized algorithms for the traveling salesman problem
-
Shi, L., S. Ólafsson, and N. Sun. 1999. "New Parallel Randomized Algorithms for the Traveling Salesman Problem." Computers and Operations Research 26: 371-394. doi:10.1016/S0305-0548(98)00068-9.
-
(1999)
Computers and Operations Research
, vol.26
, pp. 371-394
-
-
Shi, L.1
Ólafsson, S.2
Sun, N.3
-
30
-
-
27944473615
-
Feature-based design for process planning of machining processes with optimization using genetic algorithms
-
Singh, D. K. J., and C. Jebaraj. 2005. "Feature-Based Design for Process Planning of Machining Processes with Optimization Using Genetic Algorithms." International Journal of Production Research 43 (18): 3855-3887. doi:10.1080/00207540500032160.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.18
, pp. 3855-3887
-
-
Singh, D.K.J.1
Jebaraj, C.2
-
31
-
-
79957473902
-
Weighted nested partitions based on differential evolution (WNPDE) algorithm-based scheduling of parallel batching processing machines (BPM) with incompatible families and dynamic lot arrival
-
Su, G., and X. Wang. 2011. "Weighted Nested Partitions Based on Differential Evolution (WNPDE) Algorithm-Based Scheduling of Parallel Batching Processing Machines (BPM) with Incompatible Families and Dynamic Lot Arrival." International Journal of Computer Integrated Manufacturing 24 (6): 552-560. doi:10.1080/0951192X.2011.562545.
-
(2011)
International Journal of Computer Integrated Manufacturing
, vol.24
, Issue.6
, pp. 552-560
-
-
Su, G.1
Wang, X.2
-
32
-
-
0033885605
-
Integration of process planning and scheduling - A review
-
Tan, W., and B. Khoshnevis. 2000. "Integration of Process Planning and Scheduling -A Review." Journal of Intelligent Manufacturing 11 (1): 51-63. doi:10.1023/A:1008952024606.
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, Issue.1
, pp. 51-63
-
-
Tan, W.1
Khoshnevis, B.2
-
33
-
-
78650612970
-
Agent-based dynamic integrated process planning and scheduling in flexible manufacturing systems
-
Tehrani, H., N. Sugimura, and K. Iwamura. 2011. "Agent-Based Dynamic Integrated Process Planning and Scheduling in Flexible Manufacturing Systems." International Journal of Production Research 49 (5): 1373-1389. doi:10.1080/00207543.2010.518741.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.5
, pp. 1373-1389
-
-
Tehrani, H.1
Sugimura, N.2
Iwamura, K.3
-
34
-
-
73849132295
-
ASP: An adaptive setup planning approach for dynamic machine assignment
-
Wang, L., N. Cai, H. Yung, and J. Ma. 2010. "ASP: An Adaptive Setup Planning Approach for Dynamic Machine Assignment." IEEE Transactions on Automation Science and Engineering 7 (1): 1-14.
-
(2010)
IEEE Transactions on Automation Science and Engineering
, vol.7
, Issue.1
, pp. 1-14
-
-
Wang, L.1
Cai, N.2
Yung, H.3
Ma, J.4
-
35
-
-
3042550638
-
Architecture design for distributed process planning
-
Wang, L., H.-Y. Feng, and N. Cai. 2003. "Architecture Design for Distributed Process Planning." Journal of Manufacturing Systems 22 (2): 99-115. doi:10.1016/S0278-6125(03)90008-2.
-
(2003)
Journal of Manufacturing Systems
, vol.22
, Issue.2
, pp. 99-115
-
-
Wang, L.1
Feng, H.-Y.2
Cai, N.3
-
36
-
-
33745683970
-
Embedding machining features in function blocks for distributed process planning
-
Wang, L., W. Jin, and H. Y. Feng. 2006. "Embedding Machining Features in Function Blocks for Distributed Process Planning." International Journal of Computer Integrated Manufacturing 19 (5): 443-452. doi:10.1080/09511920500399060.
-
(2006)
International Journal of Computer Integrated Manufacturing
, vol.19
, Issue.5
, pp. 443-452
-
-
Wang, L.1
Jin, W.2
Feng, H.Y.3
-
37
-
-
0042204356
-
Integrated production planning and scheduling on automobile assembly lines
-
Yan, H. S., Q. F. Xia, M. R. Zhu, X. L. Liu, and Z. M. Guo. 2003. "Integrated Production Planning and Scheduling on Automobile Assembly Lines." IIE Transactions 35 (8): 711-725. doi:10.1080/07408170304348.
-
(2003)
IIE Transactions
, vol.35
, Issue.8
, pp. 711-725
-
-
Yan, H.S.1
Xia, Q.F.2
Zhu, M.R.3
Liu, X.L.4
Guo, Z.M.5
-
38
-
-
33846952197
-
Computer aided manufacturing planning for mass customization: Part 2, automated setup planning
-
Yao, S., X. Han, Y. Yang, Y. Rong, S. H. Huang, D. W. Yen, and G. Zhang. 2007. "Computer Aided Manufacturing Planning for Mass Customization: Part 2, Automated Setup Planning." The International Journal of Advanced Manufacturing Technology 32: 205-217. doi:10.1007/s00170-005-0328-y.
-
(2007)
The International Journal of Advanced Manufacturing Technology
, vol.32
, pp. 205-217
-
-
Yao, S.1
Han, X.2
Yang, Y.3
Rong, Y.4
Huang, S.H.5
Yen, D.W.6
Zhang, G.7
-
39
-
-
33847059708
-
Development of group setup strategies for makespan minimisation in PCB assembly
-
Yilmaz, I. O., M. Grunow, H.-O. Günther, and C. Yapan. 2007. "Development of Group Setup Strategies for Makespan Minimisation in PCB Assembly." International Journal of Production Research 45 (4): 871-897. doi:10.1080/00207540600690735.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.4
, pp. 871-897
-
-
Yilmaz, I.O.1
Grunow, M.2
Günther, H.-O.3
Yapan, C.4
-
40
-
-
0032668985
-
A hybrid-graph approach for automated setup planning in CAPP
-
Zhang, H.-C., and E. Lin. 1999. "A Hybrid-Graph Approach for Automated Setup Planning in CAPP." Robotics and Computer-Integrated Manufacturing 15 (1): 89-100. doi:10.1016/S0736-5845(98)00031-3.
-
(1999)
Robotics and Computer-Integrated Manufacturing
, vol.15
, Issue.1
, pp. 89-100
-
-
Zhang, H.-C.1
Lin, E.2
-
41
-
-
26644469880
-
Integrated optimization of production planning and scheduling for a kind of job-shop
-
Zhang, X. D., and H. S. Yan. 2006. "Integrated Optimization of Production Planning and Scheduling for a Kind of Job- Shop." International Journal of Advance Manufacturing Technology 26(7-8): 876-886.
-
(2006)
International Journal of Advance Manufacturing Technology
, vol.26
, Issue.7-8
, pp. 876-886
-
-
Zhang, X.D.1
Yan, H.S.2
-
42
-
-
0033345048
-
Object oriented manufacturing resource modelling for adaptive process planning
-
Zhang, Y., S. C. Feng, X. Wang, W. Tian, and R. Wu. 1999. "Object Oriented Manufacturing Resource Modelling for Adaptive Process Planning." International Journal of Production Research 37 (18): 4179-4195. doi:10.1080/002075499189727.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.18
, pp. 4179-4195
-
-
Zhang, Y.1
Feng, S.C.2
Wang, X.3
Tian, W.4
Wu, R.5
-
43
-
-
0035922487
-
Graph-based setup planning and tolerance decomposition for computer-aided fixture design
-
Zhang, Y., W. Hu, Y. Rong, and D. W. Yen. 2001. "Graph-Based Setup Planning and Tolerance Decomposition for Computer-Aided Fixture Design." International Journal of Production Research 39 (14): 3109-3126. doi:10.1080/00207540110056171.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.14
, pp. 3109-3126
-
-
Zhang, Y.1
Hu, W.2
Rong, Y.3
Yen, D.W.4
-
44
-
-
0242269797
-
Integration of process planning and scheduling by exploring the flexibility of process planning
-
Zhang, Y. F., A. N. Saravanan, and J. Y. H. Fuh. 2003. "Integration of Process Planning and Scheduling by Exploring the Flexibility of Process Planning." International Journal of Production Research 41 (3): 611-628. doi:10.1080/0020754021000037874.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.3
, pp. 611-628
-
-
Zhang, Y.F.1
Saravanan, A.N.2
Fuh, J.Y.H.3
-
45
-
-
74949126533
-
A hybrid particle swarm optimisation algorithm and fuzzy logic for process planning and production scheduling integration in holonic manufacturing systems
-
Zhao, F., Y. Hong, D. Yu, Y. Yang, and Q. Zhang. 2010. "A Hybrid Particle Swarm Optimisation Algorithm and Fuzzy Logic for Process Planning and Production Scheduling Integration in Holonic Manufacturing Systems." International Journal of Computer Integrated Manufacturing 23 (1): 20-39. doi:10.1080/09511920903207472.
-
(2010)
International Journal of Computer Integrated Manufacturing
, vol.23
, Issue.1
, pp. 20-39
-
-
Zhao, F.1
Hong, Y.2
Yu, D.3
Yang, Y.4
Zhang, Q.5
-
46
-
-
79953687937
-
Nested partitions method for assembly sequences merging
-
Zhou, W., J. R. Zheng, and J. F. Wang. 2011. "Nested Partitions Method for Assembly Sequences Merging." Expert Systems with Applications 38: 9918-9923. doi:10.1016/j.eswa.2011.02.038.
-
(2011)
Expert Systems with Applications
, vol.38
, pp. 9918-9923
-
-
Zhou, W.1
Zheng, J.R.2
Wang, J.F.3
|