메뉴 건너뛰기




Volumn 28, Issue 10, 2015, Pages 1077-1091

A nested partitioning-based approach to integrate process planning and scheduling in flexible manufacturing environment

Author keywords

merging matrix; nested partitioning; process planning; scheduling

Indexed keywords

GENETIC ALGORITHMS; PROCESS PLANNING; SCHEDULING;

EID: 84937970336     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/0951192X.2014.961548     Document Type: Article
Times cited : (11)

References (46)
  • 1
    • 33846194282 scopus 로고    scopus 로고
    • An intelligent process planning system for prismatic parts using STEP features
    • Amaitik, S. M., and S. E. Kili?. 2007. "An Intelligent Process Planning System for Prismatic Parts Using STEP Features." The International Journal of Advanced Manufacturing Technology 31: 978-993. doi:10.1007/s00170-005-0269-5.
    • (2007) The International Journal of Advanced Manufacturing Technology , vol.31 , pp. 978-993
    • Amaitik, S.M.1    Kili, S.E.2
  • 3
    • 0000955243 scopus 로고
    • A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling
    • Brandimarte, P., and M. Calderini. 1995. "A Hierarchical Bicriterion Approach to Integrated Process Plan Selection and Job Shop Scheduling." International Journal of Production Research 33 (1): 161-181. doi:10.1080/00207549508930142.
    • (1995) International Journal of Production Research , vol.33 , Issue.1 , pp. 161-181
    • Brandimarte, P.1    Calderini, M.2
  • 4
    • 36249009507 scopus 로고    scopus 로고
    • Adaptive setup planning of prismatic parts for machine tools with varying configurations
    • Cai, N., L. Wang, and H.-Y. Feng. 2008. "Adaptive Setup Planning of Prismatic Parts for Machine Tools with Varying Configurations." International Journal of Production Research 46 (3): 571-594. doi:10.1080/00207540600849125.
    • (2008) International Journal of Production Research , vol.46 , Issue.3 , pp. 571-594
    • Cai, N.1    Wang, L.2    Feng, H.-Y.3
  • 5
    • 70449585726 scopus 로고    scopus 로고
    • GA-based adaptive setup planning toward process planning and scheduling integration
    • Cai, N., L. Wang, and H.-Y. Feng. 2009. "GA-Based Adaptive Setup Planning toward Process Planning and Scheduling Integration." International Journal of Production Research 47 (10): 2745-2766. doi:10.1080/00207540701663516.
    • (2009) International Journal of Production Research , vol.47 , Issue.10 , pp. 2745-2766
    • Cai, N.1    Wang, L.2    Feng, H.-Y.3
  • 6
    • 84863785857 scopus 로고    scopus 로고
    • Nested partitions for global optimization in nonlinear model predictive control
    • Chauhdry, H. M., and P. B. Luh. 2012. "Nested Partitions for Global Optimization in Nonlinear Model Predictive Control." Control Engineering Practice 20: 869-881. doi:10.1016/j.conengprac.2012.05.003.
    • (2012) Control Engineering Practice , vol.20 , pp. 869-881
    • Chauhdry, H.M.1    Luh, P.B.2
  • 7
    • 77957121799 scopus 로고    scopus 로고
    • Metaheuristics to minimise makespan on parallel batch processing machines with dynamic job arrivals
    • Chen, H., B. Du, and G. Q. Huang. 2010. "Metaheuristics to Minimise Makespan on Parallel Batch Processing Machines with Dynamic Job Arrivals." International Journal of Computer Integrated Manufacturing 23 (10): 942-956. doi:10.1080/0951192X.2010.495137.
    • (2010) International Journal of Computer Integrated Manufacturing , vol.23 , Issue.10 , pp. 942-956
    • Chen, H.1    Du, B.2    Huang, G.Q.3
  • 8
    • 0032045604 scopus 로고    scopus 로고
    • Setup planning using hopfield net and simulated annealing
    • Chen, J., Y. F. Zhang, and A. Y. C. Nee. 1998. "Setup Planning Using Hopfield Net and Simulated Annealing." International Journal of Production Research 36 (4): 981-1000. doi:10.1080/002075498193480.
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 981-1000
    • Chen, J.1    Zhang, Y.F.2    Nee, A.Y.C.3
  • 9
    • 33746031638 scopus 로고
    • Integration of process planning and scheduling functions
    • Chen, Q., and B. Khoshnevis. 1990. "Integration of Process Planning and Scheduling Functions." Journal of Intelligent Manufacturing 1 (3): 165-176.
    • (1990) Journal of Intelligent Manufacturing , vol.1 , Issue.3 , pp. 165-176
    • Chen, Q.1    Khoshnevis, B.2
  • 10
    • 84876152333 scopus 로고
    • Scheduling with flexible process plans
    • Chen, Q., and B. Khoshnevis. 1993. "Scheduling with Flexible Process Plans." Production Planning and Control 4 (4): 333-343. doi:10.1080/09537289308919455.
    • (1993) Production Planning and Control , vol.4 , Issue.4 , pp. 333-343
    • Chen, Q.1    Khoshnevis, B.2
  • 11
    • 55749109213 scopus 로고    scopus 로고
    • Differentiated service inventory optimization using nested partitions and MOCBA
    • Chew, E. P., H.-L. Lee, S. Teng, and H.-C. Koh. 2009. "Differentiated Service Inventory Optimization Using Nested Partitions and MOCBA." Computers & Operations Research 36 (5): 1703-1710. doi:10.1016/j.cor.2008.04.006.
    • (2009) Computers & Operations Research , vol.36 , Issue.5 , pp. 1703-1710
    • Chew, E.P.1    Lee, H.-L.2    Teng, S.3    Koh, H.-C.4
  • 13
    • 2042481348 scopus 로고    scopus 로고
    • Machine capability and fixturing constraints-imposed automatic machining setups generation
    • Gologlu, C. 2004. "Machine Capability and Fixturing Constraints-Imposed Automatic Machining Setups Generation." Journal of Materials Processing Technology 148 (1): 83-92. doi:10.1016/j.jmatprotec.2004.01.043.
    • (2004) Journal of Materials Processing Technology , vol.148 , Issue.1 , pp. 83-92
    • Gologlu, C.1
  • 14
    • 42449093835 scopus 로고    scopus 로고
    • Setup planning for machining the features of prismatic parts
    • Hebbal, S. S., and N. K. Mehta. 2008. "Setup Planning for Machining the Features of Prismatic Parts." International Journal of Production Research 46 (12): 3241-3257. doi:10.1080/00207540601070937.
    • (2008) International Journal of Production Research , vol.46 , Issue.12 , pp. 3241-3257
    • Hebbal, S.S.1    Mehta, N.K.2
  • 15
    • 0344584403 scopus 로고    scopus 로고
    • Automatic setup planning for metal cutting: An integrated methodology
    • Huang, S. H., and N. Xu. 2003. "Automatic Setup Planning for Metal Cutting: An Integrated Methodology." International Journal of Production Research 41 (18): 4339-4356. doi:10.1080/0020754031000153351.
    • (2003) International Journal of Production Research , vol.41 , Issue.18 , pp. 4339-4356
    • Huang, S.H.1    Xu, N.2
  • 16
    • 79251627866 scopus 로고
    • A progressive approach for the integration of process planning and scheduling
    • Huang, S. H., H.-C. Zhang, and M. L. Smith. 1995. "A Progressive Approach for the Integration of Process Planning and Scheduling." IIE Transactions 27 (4): 456-464. doi:10.1080/07408179508936762.
    • (1995) IIE Transactions , vol.27 , Issue.4 , pp. 456-464
    • Huang, S.H.1    Zhang, H.-C.2    Smith, M.L.3
  • 18
    • 0037410965 scopus 로고    scopus 로고
    • A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
    • Kim, Y. K., K. Park, and J. Ko. 2003. "A Symbiotic Evolutionary Algorithm for the Integration of Process Planning and Job Shop Scheduling." Computers and Operations Research 30 (8): 1151-1171. doi:10.1016/S0305-0548(02)00063-1.
    • (2003) Computers and Operations Research , vol.30 , Issue.8 , pp. 1151-1171
    • Kim, Y.K.1    Park, K.2    Ko, J.3
  • 19
    • 33751504128 scopus 로고    scopus 로고
    • A simulated annealing-based optimization approach for integrated process planning and scheduling
    • Li, W. D., and C. A. McMahon. 2007. "A Simulated Annealing-Based Optimization Approach for Integrated Process Planning and Scheduling." International Journal of Computer Integrated Manufacturing 20 (1): 80-95. doi:10.1080/09511920600667366.
    • (2007) International Journal of Computer Integrated Manufacturing , vol.20 , Issue.1 , pp. 80-95
    • Li, W.D.1    McMahon, C.A.2
  • 20
    • 33947229517 scopus 로고    scopus 로고
    • Sequencing of interacting prismatic machining features for process planning
    • Li, Z., and L. Wang. 2007. "Sequencing of Interacting Prismatic Machining Features for Process Planning." Computers in Industry 58: 295-303. doi:10.1016/j.compind.2006.07.003.
    • (2007) Computers in Industry , vol.58 , pp. 295-303
    • Li, Z.1    Wang, L.2
  • 21
    • 0032642660 scopus 로고    scopus 로고
    • Genetic algorithms in integrated process planning and scheduling
    • Morad, N., and A. Zalzala. 1999. "Genetic Algorithms in Integrated Process Planning and Scheduling." Journal of Intelligent Manufacturing 10 (2): 169-179. doi:10.1023/A:1008976720878.
    • (1999) Journal of Intelligent Manufacturing , vol.10 , Issue.2 , pp. 169-179
    • Morad, N.1    Zalzala, A.2
  • 22
    • 0034427464 scopus 로고    scopus 로고
    • Optimal selection probability in the two-stage nested partitions method for simulation-based optimization
    • Ólafsson, S., and N. Gopinath 2000 Optimal Selection Probability in the Two-Stage Nested Partitions Method For Simulation-Based Optimization In Proceedings of the 2000 Winter Simulation Conference. Doi:10.1109/WSC.2000.899787.
    • (2000) Proceedings of the 2000 Winter Simulation Conference
    • Ólafsson, S.1    Gopinath, N.2
  • 23
    • 0037115840 scopus 로고    scopus 로고
    • Hybrid GA and SA dynamic setup planning optimization
    • Ong, S. K., J. Ding, and A. Y. C. Nee. 2002. "Hybrid GA and SA Dynamic Setup Planning Optimization." International Journal of Production Research 40 (18): 4697-4719. doi:10.1080/00207540210155864.
    • (2002) International Journal of Production Research , vol.40 , Issue.18 , pp. 4697-4719
    • Ong, S.K.1    Ding, J.2    Nee, A.Y.C.3
  • 24
    • 0032648655 scopus 로고    scopus 로고
    • Integrating flexible process plans with scheduling in flexible manufacturing systems
    • Saygin, C., and S. E. Kilic. 1999. "Integrating Flexible Process Plans with Scheduling in Flexible Manufacturing Systems." The International Journal of Advanced Manufacturing Technology 15 (4): 268-280. doi:10.1007/s001700050066.
    • (1999) The International Journal of Advanced Manufacturing Technology , vol.15 , Issue.4 , pp. 268-280
    • Saygin, C.1    Kilic, S.E.2
  • 27
    • 42949178687 scopus 로고    scopus 로고
    • A nested partitions framework for solving large-scale multicommodity facility location problems
    • Shi, L., R. R. Meyer, M. Bozbay, and A. J. Miller. 2004. "A Nested Partitions Framework for Solving Large-Scale Multicommodity Facility Location Problems." Journal of Systems Science and Systems Engineering 13 (2): 158-179. doi:10.1007/s11518-006-0159-x.
    • (2004) Journal of Systems Science and Systems Engineering , vol.13 , Issue.2 , pp. 158-179
    • Shi, L.1    Meyer, R.R.2    Bozbay, M.3    Miller, A.J.4
  • 28
    • 0034179713 scopus 로고    scopus 로고
    • Nested partitions method for global optimization
    • Shi, L., and S. Ólafsson. 2000. "Nested Partitions Method for Global Optimization." Operations Researches 48 (3): 390-407. doi:10.1287/opre.48.3.390.12436.
    • (2000) Operations Researches , vol.48 , Issue.3 , pp. 390-407
    • Shi, L.1    Ólafsson, S.2
  • 29
    • 0032782385 scopus 로고    scopus 로고
    • New parallel randomized algorithms for the traveling salesman problem
    • Shi, L., S. Ólafsson, and N. Sun. 1999. "New Parallel Randomized Algorithms for the Traveling Salesman Problem." Computers and Operations Research 26: 371-394. doi:10.1016/S0305-0548(98)00068-9.
    • (1999) Computers and Operations Research , vol.26 , pp. 371-394
    • Shi, L.1    Ólafsson, S.2    Sun, N.3
  • 30
    • 27944473615 scopus 로고    scopus 로고
    • Feature-based design for process planning of machining processes with optimization using genetic algorithms
    • Singh, D. K. J., and C. Jebaraj. 2005. "Feature-Based Design for Process Planning of Machining Processes with Optimization Using Genetic Algorithms." International Journal of Production Research 43 (18): 3855-3887. doi:10.1080/00207540500032160.
    • (2005) International Journal of Production Research , vol.43 , Issue.18 , pp. 3855-3887
    • Singh, D.K.J.1    Jebaraj, C.2
  • 31
    • 79957473902 scopus 로고    scopus 로고
    • Weighted nested partitions based on differential evolution (WNPDE) algorithm-based scheduling of parallel batching processing machines (BPM) with incompatible families and dynamic lot arrival
    • Su, G., and X. Wang. 2011. "Weighted Nested Partitions Based on Differential Evolution (WNPDE) Algorithm-Based Scheduling of Parallel Batching Processing Machines (BPM) with Incompatible Families and Dynamic Lot Arrival." International Journal of Computer Integrated Manufacturing 24 (6): 552-560. doi:10.1080/0951192X.2011.562545.
    • (2011) International Journal of Computer Integrated Manufacturing , vol.24 , Issue.6 , pp. 552-560
    • Su, G.1    Wang, X.2
  • 32
    • 0033885605 scopus 로고    scopus 로고
    • Integration of process planning and scheduling - A review
    • Tan, W., and B. Khoshnevis. 2000. "Integration of Process Planning and Scheduling -A Review." Journal of Intelligent Manufacturing 11 (1): 51-63. doi:10.1023/A:1008952024606.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.1 , pp. 51-63
    • Tan, W.1    Khoshnevis, B.2
  • 33
    • 78650612970 scopus 로고    scopus 로고
    • Agent-based dynamic integrated process planning and scheduling in flexible manufacturing systems
    • Tehrani, H., N. Sugimura, and K. Iwamura. 2011. "Agent-Based Dynamic Integrated Process Planning and Scheduling in Flexible Manufacturing Systems." International Journal of Production Research 49 (5): 1373-1389. doi:10.1080/00207543.2010.518741.
    • (2011) International Journal of Production Research , vol.49 , Issue.5 , pp. 1373-1389
    • Tehrani, H.1    Sugimura, N.2    Iwamura, K.3
  • 35
    • 3042550638 scopus 로고    scopus 로고
    • Architecture design for distributed process planning
    • Wang, L., H.-Y. Feng, and N. Cai. 2003. "Architecture Design for Distributed Process Planning." Journal of Manufacturing Systems 22 (2): 99-115. doi:10.1016/S0278-6125(03)90008-2.
    • (2003) Journal of Manufacturing Systems , vol.22 , Issue.2 , pp. 99-115
    • Wang, L.1    Feng, H.-Y.2    Cai, N.3
  • 36
    • 33745683970 scopus 로고    scopus 로고
    • Embedding machining features in function blocks for distributed process planning
    • Wang, L., W. Jin, and H. Y. Feng. 2006. "Embedding Machining Features in Function Blocks for Distributed Process Planning." International Journal of Computer Integrated Manufacturing 19 (5): 443-452. doi:10.1080/09511920500399060.
    • (2006) International Journal of Computer Integrated Manufacturing , vol.19 , Issue.5 , pp. 443-452
    • Wang, L.1    Jin, W.2    Feng, H.Y.3
  • 37
    • 0042204356 scopus 로고    scopus 로고
    • Integrated production planning and scheduling on automobile assembly lines
    • Yan, H. S., Q. F. Xia, M. R. Zhu, X. L. Liu, and Z. M. Guo. 2003. "Integrated Production Planning and Scheduling on Automobile Assembly Lines." IIE Transactions 35 (8): 711-725. doi:10.1080/07408170304348.
    • (2003) IIE Transactions , vol.35 , Issue.8 , pp. 711-725
    • Yan, H.S.1    Xia, Q.F.2    Zhu, M.R.3    Liu, X.L.4    Guo, Z.M.5
  • 39
    • 33847059708 scopus 로고    scopus 로고
    • Development of group setup strategies for makespan minimisation in PCB assembly
    • Yilmaz, I. O., M. Grunow, H.-O. Günther, and C. Yapan. 2007. "Development of Group Setup Strategies for Makespan Minimisation in PCB Assembly." International Journal of Production Research 45 (4): 871-897. doi:10.1080/00207540600690735.
    • (2007) International Journal of Production Research , vol.45 , Issue.4 , pp. 871-897
    • Yilmaz, I.O.1    Grunow, M.2    Günther, H.-O.3    Yapan, C.4
  • 40
    • 0032668985 scopus 로고    scopus 로고
    • A hybrid-graph approach for automated setup planning in CAPP
    • Zhang, H.-C., and E. Lin. 1999. "A Hybrid-Graph Approach for Automated Setup Planning in CAPP." Robotics and Computer-Integrated Manufacturing 15 (1): 89-100. doi:10.1016/S0736-5845(98)00031-3.
    • (1999) Robotics and Computer-Integrated Manufacturing , vol.15 , Issue.1 , pp. 89-100
    • Zhang, H.-C.1    Lin, E.2
  • 41
    • 26644469880 scopus 로고    scopus 로고
    • Integrated optimization of production planning and scheduling for a kind of job-shop
    • Zhang, X. D., and H. S. Yan. 2006. "Integrated Optimization of Production Planning and Scheduling for a Kind of Job- Shop." International Journal of Advance Manufacturing Technology 26(7-8): 876-886.
    • (2006) International Journal of Advance Manufacturing Technology , vol.26 , Issue.7-8 , pp. 876-886
    • Zhang, X.D.1    Yan, H.S.2
  • 42
    • 0033345048 scopus 로고    scopus 로고
    • Object oriented manufacturing resource modelling for adaptive process planning
    • Zhang, Y., S. C. Feng, X. Wang, W. Tian, and R. Wu. 1999. "Object Oriented Manufacturing Resource Modelling for Adaptive Process Planning." International Journal of Production Research 37 (18): 4179-4195. doi:10.1080/002075499189727.
    • (1999) International Journal of Production Research , vol.37 , Issue.18 , pp. 4179-4195
    • Zhang, Y.1    Feng, S.C.2    Wang, X.3    Tian, W.4    Wu, R.5
  • 43
    • 0035922487 scopus 로고    scopus 로고
    • Graph-based setup planning and tolerance decomposition for computer-aided fixture design
    • Zhang, Y., W. Hu, Y. Rong, and D. W. Yen. 2001. "Graph-Based Setup Planning and Tolerance Decomposition for Computer-Aided Fixture Design." International Journal of Production Research 39 (14): 3109-3126. doi:10.1080/00207540110056171.
    • (2001) International Journal of Production Research , vol.39 , Issue.14 , pp. 3109-3126
    • Zhang, Y.1    Hu, W.2    Rong, Y.3    Yen, D.W.4
  • 44
    • 0242269797 scopus 로고    scopus 로고
    • Integration of process planning and scheduling by exploring the flexibility of process planning
    • Zhang, Y. F., A. N. Saravanan, and J. Y. H. Fuh. 2003. "Integration of Process Planning and Scheduling by Exploring the Flexibility of Process Planning." International Journal of Production Research 41 (3): 611-628. doi:10.1080/0020754021000037874.
    • (2003) International Journal of Production Research , vol.41 , Issue.3 , pp. 611-628
    • Zhang, Y.F.1    Saravanan, A.N.2    Fuh, J.Y.H.3
  • 45
    • 74949126533 scopus 로고    scopus 로고
    • A hybrid particle swarm optimisation algorithm and fuzzy logic for process planning and production scheduling integration in holonic manufacturing systems
    • Zhao, F., Y. Hong, D. Yu, Y. Yang, and Q. Zhang. 2010. "A Hybrid Particle Swarm Optimisation Algorithm and Fuzzy Logic for Process Planning and Production Scheduling Integration in Holonic Manufacturing Systems." International Journal of Computer Integrated Manufacturing 23 (1): 20-39. doi:10.1080/09511920903207472.
    • (2010) International Journal of Computer Integrated Manufacturing , vol.23 , Issue.1 , pp. 20-39
    • Zhao, F.1    Hong, Y.2    Yu, D.3    Yang, Y.4    Zhang, Q.5
  • 46
    • 79953687937 scopus 로고    scopus 로고
    • Nested partitions method for assembly sequences merging
    • Zhou, W., J. R. Zheng, and J. F. Wang. 2011. "Nested Partitions Method for Assembly Sequences Merging." Expert Systems with Applications 38: 9918-9923. doi:10.1016/j.eswa.2011.02.038.
    • (2011) Expert Systems with Applications , vol.38 , pp. 9918-9923
    • Zhou, W.1    Zheng, J.R.2    Wang, J.F.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.