-
1
-
-
12244292458
-
-
Administrator Guide, [online] Available from
-
Administrator, Guide. Jade administrator's guide [online]. Available from: http://sharon.cselt.it/projects/jade/doc/administratorsguide.pdf
-
Jade Administrator's Guide
-
-
-
2
-
-
33749582283
-
A heuristic for triggering emergency orders in an inventory system
-
Axsater, S., 2007. A heuristic for triggering emergency orders in an inventory system. European Journal of Operational Research, 176 (2), 880-891.
-
(2007)
European Journal of Operational Research
, vol.176
, Issue.2
, pp. 880-891
-
-
Axsater, S.1
-
3
-
-
63749126112
-
Distributed and centralised material handling scheduling: Comparison and results of a simulation study
-
Available from
-
Babiceanu, R.F. and Chen, F.F., 2009. Distributed and centralised material handling scheduling: Comparison and results of a simulation study. Robotics and Computer-Integrated Manufacturing, 25 (2), 441-448. Available from: http://dx.doi.org/10.1016/j.rcim.2008.02.007
-
(2009)
Robotics and Computer-Integrated Manufacturing
, vol.25
, Issue.2
, pp. 441-448
-
-
Babiceanu, R.F.1
Chen, F.F.2
-
4
-
-
17944372642
-
Real-time holonic scheduling of material handling operations in a dynamic manufacturing environment
-
Babiceanu, R.F.C., Frank, F., and Sturges, R.H., 2005. Real-time holonic scheduling of material handling operations in a dynamic manufacturing environment. Robotics and Computer-IntegratedManufacturing, 21 (4-5), 328-337.
-
(2005)
Robotics and Computer-IntegratedManufacturing
, vol.21
, Issue.4-5
, pp. 328-337
-
-
Babiceanu, R.F.C.1
Frank, F.2
Sturges, R.H.3
-
5
-
-
56349099192
-
The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model
-
Chan, F.T.S., Kumar, V., and Tiwari, M.K., 2009. The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model. International Journal of Production Research, 47 (1), 119-142.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.1
, pp. 119-142
-
-
Chan, F.T.S.1
Kumar, V.2
Tiwari, M.K.3
-
6
-
-
33845380385
-
Parameter identification of Chen and Lu systems: A differential evolution approach
-
Chang, W.-D., 2007. Parameter identification of Chen and Lu systems: A differential evolution approach. Chaos, Solitons and Fractals, 32 (4), 1469-1476.
-
(2007)
Chaos, Solitons and Fractals
, vol.32
, Issue.4
, pp. 1469-1476
-
-
Chang, W.-D.1
-
8
-
-
41149152214
-
A genetic-based algorithm for the operational sequence of a high speed chip placement machine
-
Chyu Chiuh-Cheng, C. and Wei-Shung, 2008. A genetic-based algorithm for the operational sequence of a high speed chip placement machine. International Journal of Advanced Manufacturing Technology, 36 (9-10), 918-926.
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.36
, Issue.9-10
, pp. 918-926
-
-
Chyu Chiuh-Cheng, C.1
Wei-Shung2
-
9
-
-
84901421400
-
The swarm and the queen: Toward a deterministic and adaptive particle swarm optimization
-
Clerc, M., 1999. The swarm and the queen: Toward a deterministic and adaptive particle swarm optimization. IEEE International Congress on Evolutionary Computation, Vol.3, 1951-1957.
-
(1999)
IEEE International Congress on Evolutionary Computation
, vol.3
, pp. 1951-1957
-
-
Clerc, M.1
-
10
-
-
3142756516
-
Handling multiple objectives with particle swarm optimization
-
Coello Coello, C.A., et al., 2004. Handling multiple objectives with particle swarm optimization. IEEE Transactions on Evolutionary Computation, 8 (3), 256-279.
-
(2004)
IEEE Transactions on Evolutionary Computation
, vol.8
, Issue.3
, pp. 256-279
-
-
Coello Coello, C.A.1
-
11
-
-
1142268167
-
Finding effective schedules for the economic lot scheduling problem: A simple mixed integer programming approach
-
Cooke, D.L.R., Thomas, R., and Silver, E.A., 2004. Finding effective schedules for the economic lot scheduling problem: A simple mixed integer programming approach. International Journal of Production Research, 42 (1), 21-36.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.1
, pp. 21-36
-
-
Cooke, D.L.R.1
Thomas, R.2
Silver, E.A.3
-
13
-
-
0033666935
-
Comparing inertia weights and constriction factors in particle swarm optimization
-
Eberhart, Y.S., 2000. Comparing inertia weights and constriction factors in particle swarm optimization. Congress on Evolutionary Computation, 84-88.
-
(2000)
Congress on Evolutionary Computation
, pp. 84-88
-
-
Eberhart, Y.S.1
-
15
-
-
33746820155
-
From system requirements to holonic manufacturing system analysis
-
Giret, A. and Botti, V., 2006. From system requirements to holonic manufacturing system analysis. International Journal of Production Research, 44 (18-19), 3917-3928.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.18-19
, pp. 3917-3928
-
-
Giret, A.1
Botti, V.2
-
16
-
-
0036770512
-
Intelligent agent based framework for manufacturing systems control
-
Available from
-
Heragu, S.S., et al., 2002. Intelligent agent based framework for manufacturing systems control. IEEE Transactions on Systems, Man, and Cybernetics Part A: Systems and Humans, 32 (5), 560-573. Available from: http://dx.doi.org/10.1109/TSMCA.2002.804788
-
(2002)
IEEE Transactions on Systems, Man, and Cybernetics Part A: Systems and Humans
, vol.32
, Issue.5
, pp. 560-573
-
-
Heragu, S.S.1
-
17
-
-
0011876116
-
-
Hms, Consortium, Web Site Available from
-
Hms, Consortium. Holonic Manufacturing System (HMS). Web Site. Available from: http://hms.ifw.uni.hannover.de/
-
Holonic Manufacturing System (HMS)
-
-
-
18
-
-
49749110448
-
Enhanced multiobjective particle swarm optimization in combination with adaptive weighted gradient-based searching
-
Izui Kazuhiro, N.S., et al., 2008. Enhanced multiobjective particle swarm optimization in combination with adaptive weighted gradient-based searching. Engineering Optimization, 40 (9), 789-804.
-
(2008)
Engineering Optimization
, vol.40
, Issue.9
, pp. 789-804
-
-
Izui Kazuhiro, N.S.1
-
19
-
-
34748820312
-
-
Jade, [online] Available from
-
Jade, Jade. Jave Agent DEvelopment Framework [online]. Available from: http://jade.cselt.it/
-
Jave Agent DEvelopment Framework
-
-
-
20
-
-
0031623118
-
Knowledge-based workcell attribute oriented dynamic schedulers for flexible manufacturing systems
-
Jawahar, N., Aravindan, P., Ponnambalam, S., and Etal, G., 1998. Knowledge-based workcell attribute oriented dynamic schedulers for flexible manufacturing systems. International Journal of Advanced Manufacturing Technology, 14 (7), 514-538.
-
(1998)
International Journal of Advanced Manufacturing Technology
, vol.14
, Issue.7
, pp. 514-538
-
-
Jawahar, N.1
Aravindan, P.2
Ponnambalam, S.3
Etal, G.4
-
21
-
-
55649089427
-
Integrated model for production planning and scheduling in a supply chain using benchmarked genetic algorithm
-
Kim Haejoong, J.H.-I. and Park, Jinwoo, 2008. Integrated model for production planning and scheduling in a supply chain using benchmarked genetic algorithm. International Journal of Advanced Manufacturing Technology, 39 (11-12), 1207-1226.
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.39
, Issue.11-12
, pp. 1207-1226
-
-
Kim Haejoong, J.H.-I.1
Jinwoo, P.2
-
22
-
-
0036953789
-
-
Sevilla, Spain: Institute of Electrical and Electronics Engineers Computer Society
-
Leitao, P. and Restivo, F., 2002. Holonic adaptive production control systems. Sevilla, Spain: Institute of Electrical and Electronics Engineers Computer Society, 2968-2973.
-
(2002)
Holonic Adaptive Production Control Systems
, pp. 2968-2973
-
-
Leitao, P.1
Restivo, F.2
-
23
-
-
44649183271
-
A holonic approach to dynamic manufacturing scheduling
-
Available from
-
Leitao, P. and Restivo, F., 2008. A holonic approach to dynamic manufacturing scheduling. Robotics and Computer-Integrated Manufacturing, 24 (5), 625-634. Available from: http://dx.doi.org/10.1016/j.rcim.2007.09.005
-
(2008)
Robotics and Computer-Integrated Manufacturing
, vol.24
, Issue.5
, pp. 625-634
-
-
Leitao, P.1
Restivo, F.2
-
24
-
-
4043057144
-
Study on strategies of overcoming deadlocks in ga-based solution for jssp
-
Li, J., Lou, and Pei-Huang, 2004. Study on strategies of overcoming deadlocks in ga-based solution for jssp. Journal of Nanjing University of Aeronautics and Astronautics, 36 (3), 317-321.
-
(2004)
Journal of Nanjing University of Aeronautics and Astronautics
, vol.36
, Issue.3
, pp. 317-321
-
-
Lou, L.J.1
Pei-Huang2
-
25
-
-
45749100041
-
Cutting parameters optimization by using particle swarm optimization (pso)
-
Li, J.G., et al., 2008. Cutting parameters optimization by using particle swarm optimization (pso). Applied Mechanics and Materials, 10-12, 879-883.
-
(2008)
Applied Mechanics and Materials
, vol.10-12
, pp. 879-883
-
-
Li, J.G.1
-
26
-
-
7944230912
-
Scheduling the production of hot rolling steel tube: A rule-based heuristics
-
Li Jianxiang, T., et al., 2004. Scheduling the production of hot rolling steel tube: A rule-based heuristics. Iron and Steel (Peking), 39 (9), 39-45.
-
(2004)
Iron and Steel (Peking)
, vol.39
, Issue.9
, pp. 39-45
-
-
Li Jianxiang, T.1
-
27
-
-
33751504128
-
A simulated annealingbased optimization approach for integrated process planning and scheduling
-
Li, W.D. and Mcmahon, C.A., 2007. A simulated annealingbased optimization approach for integrated process planning and scheduling. International Journal of Computer Integrated Manufacturing, 20 (1), 80-95.
-
(2007)
International Journal of Computer Integrated Manufacturing
, vol.20
, Issue.1
, pp. 80-95
-
-
Li, W.D.1
McMahon, C.A.2
-
28
-
-
55849088752
-
Hybrid differential evolution for noisy optimization
-
Location/publisher
-
Liu Bo, Z.X. and Ma Hannan, 2008. Hybrid differential evolution for noisy optimization. IEEE Congress on Evolutionary Computation, 587-592, Location/publisher.
-
(2008)
IEEE Congress on Evolutionary Computation
, pp. 587-592
-
-
Liu Bo, Z.X.1
Hannan, M.2
-
29
-
-
1942472550
-
Integrated group technology, cell formation, process planning, and production planning with application to the emergency room
-
Malakooti, B.M., Nima, R., and Yang, Ziyong, 2004. Integrated group technology, cell formation, process planning, and production planning with application to the emergency room. International Journal of Production Research, 42 (9), 1769-1786.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.9
, pp. 1769-1786
-
-
Malakooti, B.M.1
Nima, R.2
Ziyong, Y.3
-
30
-
-
33750458518
-
Holonic and multi-agent systems for manufacturing
-
Springer
-
Mar¡?́k, V., Vyatkin, V., and Colombo, A.W., 2007. Holonic and multi-agent systems for manufacturing. 3rd International Conference on Industrial Applications of Holonic and Multi-agent Systems, HoloMAS 2007, Springer.
-
(2007)
3rd International Conference on Industrial Applications of Holonic and Multi-agent Systems, HoloMAS 2007
-
-
Maŕk, V.1
Vyatkin, V.2
Colombo, A.W.3
-
32
-
-
0034286607
-
Developments in holonic production planning and control
-
Available from
-
Mcfarlane, D.C. and Bussman, S., 2000. Developments in holonic production planning and control. Production Planning and Control, 11 (6), 522-536. Available from: http://dx.doi.org/10.1080/095372800414089
-
(2000)
Production Planning and Control
, vol.11
, Issue.6
, pp. 522-536
-
-
McFarlane, D.C.1
Bussman, S.2
-
33
-
-
33750718514
-
Genetic algorithmbased subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
-
Monch Lars, S.R., et al., 2007. Genetic algorithmbased subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops. European Journal of Operational Research, 177 (3), 2100-2118.
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 2100-2118
-
-
Monch Lars, S.R.1
-
35
-
-
33845341058
-
Solving a large-scale precedence constrained scheduling problem with elastic jobs using tabu search
-
Pedersen, C.R., Rasmussen, R.V., and Andersen, K.A., 2007. Solving a large-scale precedence constrained scheduling problem with elastic jobs using tabu search. Computers and Operations Research, 34 (7), 2025-2042.
-
(2007)
Computers and Operations Research
, vol.34
, Issue.7
, pp. 2025-2042
-
-
Pedersen, C.R.1
Rasmussen, R.V.2
Andersen, K.A.3
-
36
-
-
42449121532
-
Sensitivity analysis of a fuzzy multiobjective scheduling problem
-
Petrovic Sanja, F.C. and Petrovic, D., 2008. Sensitivity analysis of a fuzzy multiobjective scheduling problem. International Journal of Production Research, 46 (12), 3327-3344.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.12
, pp. 3327-3344
-
-
Petrovic Sanja, F.C.1
Petrovic, D.2
-
37
-
-
0010633241
-
-
Programmer guide, [online] Available from
-
Programmer Guide. Jade programmer's guide [online]. Available from: http://sharon.cselt.it/projects/jade/doc/programmersguide.pdf
-
Jade Programmer's Guide
-
-
-
38
-
-
49649084890
-
A hybrid differential evolution method for permutation flow-shop scheduling
-
Qian Bin, W.L., et al., 2008. A hybrid differential evolution method for permutation flow-shop scheduling. International Journal of Advanced Manufacturing Technology, 38 (7-8), 757-777.
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.38
, Issue.7-8
, pp. 757-777
-
-
Qian Bin, W.L.1
-
39
-
-
74949129167
-
Study on process planning system for holonic manufacturing -(selection of machining sequences and sequences of machining equipment)
-
Available from 5Go to ISI4://000177338900018
-
Rais, S., Sugimura, N., and Kokubun, A., 2002. Study on process planning system for holonic manufacturing -(selection of machining sequences and sequences of machining equipment). JSME International Journal Series C-Mechanical Systems Machine Elements and Manufacturing, 45 (2), 527-533. Available from: 5Go to ISI4://000177338900018.
-
(2002)
JSME International Journal Series C-Mechanical Systems Machine Elements and Manufacturing
, vol.45
, Issue.2
, pp. 527-533
-
-
Rais, S.1
Sugimura, N.2
Kokubun, A.3
-
40
-
-
0037282048
-
A ga-sa multiobjective hybrid search algorithm for integrating lot sizing and sequencing in flow-line scheduling
-
Reddy, M.M. and Ponnambalam, S.G., 2003. A ga-sa multiobjective hybrid search algorithm for integrating lot sizing and sequencing in flow-line scheduling. International Journal of Advanced Manufacturing Technology, 21 (2), 126-137.
-
(2003)
International Journal of Advanced Manufacturing Technology
, vol.21
, Issue.2
, pp. 126-137
-
-
Reddy, M.M.1
Ponnambalam, S.G.2
-
41
-
-
56549112491
-
Integration of process planning and scheduling-A modified genetic algorithmbased approach
-
Shao Xinyu, L.X., et al., 2009. Integration of process planning and scheduling-a modified genetic algorithmbased approach. Computers and Operations Research, 36 (6), 2082-2096.
-
(2009)
Computers and Operations Research
, vol.36
, Issue.6
, pp. 2082-2096
-
-
Shao Xinyu, L.X.1
-
42
-
-
41549140834
-
A study on integration of process planning and scheduling system for holonic manufacturing with modification of process plans
-
Available from
-
Shrestha, R., et al., 2008. A study on integration of process planning and scheduling system for holonic manufacturing with modification of process plans. International Journal of Manufacturing Technology and Management, 14 (3-4), 359-378. Available from: http://dx.doi.org/10.1504/IJMTM.2008.017733
-
(2008)
International Journal of Manufacturing Technology and Management
, vol.14
, Issue.3-4
, pp. 359-378
-
-
Shrestha, R.1
-
43
-
-
46749150544
-
Biddingbased multi-agent system for integrated process planning and scheduling: A data-mining and hybrid tabu-sa algorithm-oriented approach
-
Shukla, S.K., Tiwari, M.K., and Son, Y.J., 2008. Biddingbased multi-agent system for integrated process planning and scheduling: A data-mining and hybrid tabu-sa algorithm-oriented approach. International Journal of Advanced Manufacturing Technology, 38 (1-2), 163-175.
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.38
, Issue.1-2
, pp. 163-175
-
-
Shukla, S.K.1
Tiwari, M.K.2
Son, Y.J.3
-
45
-
-
4344651357
-
Integrative process plan model and representation for intelligent distributed manufacturing planning
-
Sormaz, D.N., Arumugam, J., and Rajaraman, S., 2004. Integrative process plan model and representation for intelligent distributed manufacturing planning. International Journal of Production Research, 42 (17), 3397-3417.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.17
, pp. 3397-3417
-
-
Sormaz, D.N.1
Arumugam, J.2
Rajaraman, S.3
-
47
-
-
0003853559
-
-
The Mathworks, I., Available from
-
The Mathworks, I., 1998. Fuzzy logic toolbox user's guide. Available from http://www.pdfee.com/fuzzy-logic-toolbox-users-guide.html
-
(1998)
Fuzzy Logic Toolbox User's Guide
-
-
-
48
-
-
33847049071
-
Modelling and simulation of mrp ii activities in multi agent systems
-
Turgay, S.K. and Taskin, H., 2007. Modelling and simulation of mrp ii activities in multi agent systems. Production Planning and Control, 18 (1), 25-34.
-
(2007)
Production Planning and Control
, vol.18
, Issue.1
, pp. 25-34
-
-
Turgay, S.K.1
Taskin, H.2
-
50
-
-
0032202527
-
Reference architecture for holonic manufacturing systems: Prosa
-
Van Brussel, H., Wyns, J., and Valckenarers, P., 1998. Reference architecture for holonic manufacturing systems: Prosa. Computer in Industry, 37 (2), 255-274.
-
(1998)
Computer in Industry
, vol.37
, Issue.2
, pp. 255-274
-
-
Van Brussel, H.1
Wyns, J.2
Valckenarers, P.3
-
51
-
-
3142697802
-
A cooperative approach to participle swam optimization
-
Van Den Bergh, F. and Engelbrecht, A.P., 2004. A cooperative approach to participle swam optimization. IEEE Transactions on Evolutionary Computation, 8 (3), 225-239.
-
(2004)
IEEE Transactions on Evolutionary Computation
, vol.8
, Issue.3
, pp. 225-239
-
-
Van Den Bergh, F.1
Engelbrecht, A.P.2
-
53
-
-
45749119521
-
Task-oriented hierarchical planning and scheduling for discrete manufacturing enterprise
-
Wang, G.L., Lin, L., and Zhong, S.S., 2008. Task-oriented hierarchical planning and scheduling for discrete manufacturing enterprise. Applied Mechanics and Materials, 10-12, 114-120.
-
(2008)
Applied Mechanics and Materials
, vol.10-12
, pp. 114-120
-
-
Wang, G.L.1
Lin, L.2
Zhong, S.S.3
-
54
-
-
9244239714
-
A rule-based heuristic finite capacity scheduling system for semiconductor beckend assembly
-
Yin Xiao-Feng, C.T.-J. and Wang, Feng-Yu, 2004. A rule-based heuristic finite capacity scheduling system for semiconductor beckend assembly. International Journal of Computer Integrated Manufacturing, 17 (8), 733-749.
-
(2004)
International Journal of Computer Integrated Manufacturing
, vol.17
, Issue.8
, pp. 733-749
-
-
Yin Xiao-Feng, C.T.-J.1
Feng-Yu, W.2
-
55
-
-
0035309164
-
Neural network and genetic algorithm-based hybrid approach to expanded jobshop scheduling
-
Yu Haibin, L.W., 2001. Neural network and genetic algorithm-based hybrid approach to expanded jobshop scheduling. Computers and Industrial Engineering, 39 (3-4), 337-356.
-
(2001)
Computers and Industrial Engineering
, vol.39
, Issue.3-4
, pp. 337-356
-
-
Yu Haibin, L.W.1
-
56
-
-
0242269797
-
Integration of process planning and scheduling by exploring the flexibility of process planning
-
Zhang, Y.F., Saravanan, A.N., and Fuh, J.Y.H., 2003. Integration of process planning and scheduling by exploring the flexibility of process planning. International Journal of Production Research, 41 (3), 611-628.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.3
, pp. 611-628
-
-
Zhang, Y.F.1
Saravanan, A.N.2
Fuh, J.Y.H.3
|