메뉴 건너뛰기




Volumn 23, Issue 1, 2010, Pages 20-39

A hybrid particle swarm optimisation algorithm and fuzzy logic for process planning and production scheduling integration in holonic manufacturing systems

Author keywords

Differential evolution (DE); Holonic manufacturing systems (HMS); Particle swarm optimisation; Process planning, production scheduling

Indexed keywords

FUZZY INFERENCE; FUZZY LOGIC; JOB SHOP SCHEDULING; PARTICLE SWARM OPTIMIZATION (PSO); PROCESS PLANNING; PRODUCTION CONTROL; SCHEDULING;

EID: 74949126533     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/09511920903207472     Document Type: Article
Times cited : (63)

References (56)
  • 1
    • 12244292458 scopus 로고    scopus 로고
    • Administrator Guide, [online] Available from
    • Administrator, Guide. Jade administrator's guide [online]. Available from: http://sharon.cselt.it/projects/jade/doc/administratorsguide.pdf
    • Jade Administrator's Guide
  • 2
    • 33749582283 scopus 로고    scopus 로고
    • A heuristic for triggering emergency orders in an inventory system
    • Axsater, S., 2007. A heuristic for triggering emergency orders in an inventory system. European Journal of Operational Research, 176 (2), 880-891.
    • (2007) European Journal of Operational Research , vol.176 , Issue.2 , pp. 880-891
    • Axsater, S.1
  • 3
    • 63749126112 scopus 로고    scopus 로고
    • Distributed and centralised material handling scheduling: Comparison and results of a simulation study
    • Available from
    • Babiceanu, R.F. and Chen, F.F., 2009. Distributed and centralised material handling scheduling: Comparison and results of a simulation study. Robotics and Computer-Integrated Manufacturing, 25 (2), 441-448. Available from: http://dx.doi.org/10.1016/j.rcim.2008.02.007
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , Issue.2 , pp. 441-448
    • Babiceanu, R.F.1    Chen, F.F.2
  • 4
    • 17944372642 scopus 로고    scopus 로고
    • Real-time holonic scheduling of material handling operations in a dynamic manufacturing environment
    • Babiceanu, R.F.C., Frank, F., and Sturges, R.H., 2005. Real-time holonic scheduling of material handling operations in a dynamic manufacturing environment. Robotics and Computer-IntegratedManufacturing, 21 (4-5), 328-337.
    • (2005) Robotics and Computer-IntegratedManufacturing , vol.21 , Issue.4-5 , pp. 328-337
    • Babiceanu, R.F.C.1    Frank, F.2    Sturges, R.H.3
  • 5
    • 56349099192 scopus 로고    scopus 로고
    • The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model
    • Chan, F.T.S., Kumar, V., and Tiwari, M.K., 2009. The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model. International Journal of Production Research, 47 (1), 119-142.
    • (2009) International Journal of Production Research , vol.47 , Issue.1 , pp. 119-142
    • Chan, F.T.S.1    Kumar, V.2    Tiwari, M.K.3
  • 6
    • 33845380385 scopus 로고    scopus 로고
    • Parameter identification of Chen and Lu systems: A differential evolution approach
    • Chang, W.-D., 2007. Parameter identification of Chen and Lu systems: A differential evolution approach. Chaos, Solitons and Fractals, 32 (4), 1469-1476.
    • (2007) Chaos, Solitons and Fractals , vol.32 , Issue.4 , pp. 1469-1476
    • Chang, W.-D.1
  • 8
    • 41149152214 scopus 로고    scopus 로고
    • A genetic-based algorithm for the operational sequence of a high speed chip placement machine
    • Chyu Chiuh-Cheng, C. and Wei-Shung, 2008. A genetic-based algorithm for the operational sequence of a high speed chip placement machine. International Journal of Advanced Manufacturing Technology, 36 (9-10), 918-926.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.9-10 , pp. 918-926
    • Chyu Chiuh-Cheng, C.1    Wei-Shung2
  • 9
    • 84901421400 scopus 로고    scopus 로고
    • The swarm and the queen: Toward a deterministic and adaptive particle swarm optimization
    • Clerc, M., 1999. The swarm and the queen: Toward a deterministic and adaptive particle swarm optimization. IEEE International Congress on Evolutionary Computation, Vol.3, 1951-1957.
    • (1999) IEEE International Congress on Evolutionary Computation , vol.3 , pp. 1951-1957
    • Clerc, M.1
  • 10
    • 3142756516 scopus 로고    scopus 로고
    • Handling multiple objectives with particle swarm optimization
    • Coello Coello, C.A., et al., 2004. Handling multiple objectives with particle swarm optimization. IEEE Transactions on Evolutionary Computation, 8 (3), 256-279.
    • (2004) IEEE Transactions on Evolutionary Computation , vol.8 , Issue.3 , pp. 256-279
    • Coello Coello, C.A.1
  • 11
    • 1142268167 scopus 로고    scopus 로고
    • Finding effective schedules for the economic lot scheduling problem: A simple mixed integer programming approach
    • Cooke, D.L.R., Thomas, R., and Silver, E.A., 2004. Finding effective schedules for the economic lot scheduling problem: A simple mixed integer programming approach. International Journal of Production Research, 42 (1), 21-36.
    • (2004) International Journal of Production Research , vol.42 , Issue.1 , pp. 21-36
    • Cooke, D.L.R.1    Thomas, R.2    Silver, E.A.3
  • 13
    • 0033666935 scopus 로고    scopus 로고
    • Comparing inertia weights and constriction factors in particle swarm optimization
    • Eberhart, Y.S., 2000. Comparing inertia weights and constriction factors in particle swarm optimization. Congress on Evolutionary Computation, 84-88.
    • (2000) Congress on Evolutionary Computation , pp. 84-88
    • Eberhart, Y.S.1
  • 15
    • 33746820155 scopus 로고    scopus 로고
    • From system requirements to holonic manufacturing system analysis
    • Giret, A. and Botti, V., 2006. From system requirements to holonic manufacturing system analysis. International Journal of Production Research, 44 (18-19), 3917-3928.
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3917-3928
    • Giret, A.1    Botti, V.2
  • 16
    • 0036770512 scopus 로고    scopus 로고
    • Intelligent agent based framework for manufacturing systems control
    • Available from
    • Heragu, S.S., et al., 2002. Intelligent agent based framework for manufacturing systems control. IEEE Transactions on Systems, Man, and Cybernetics Part A: Systems and Humans, 32 (5), 560-573. Available from: http://dx.doi.org/10.1109/TSMCA.2002.804788
    • (2002) IEEE Transactions on Systems, Man, and Cybernetics Part A: Systems and Humans , vol.32 , Issue.5 , pp. 560-573
    • Heragu, S.S.1
  • 17
    • 0011876116 scopus 로고    scopus 로고
    • Hms, Consortium, Web Site Available from
    • Hms, Consortium. Holonic Manufacturing System (HMS). Web Site. Available from: http://hms.ifw.uni.hannover.de/
    • Holonic Manufacturing System (HMS)
  • 18
    • 49749110448 scopus 로고    scopus 로고
    • Enhanced multiobjective particle swarm optimization in combination with adaptive weighted gradient-based searching
    • Izui Kazuhiro, N.S., et al., 2008. Enhanced multiobjective particle swarm optimization in combination with adaptive weighted gradient-based searching. Engineering Optimization, 40 (9), 789-804.
    • (2008) Engineering Optimization , vol.40 , Issue.9 , pp. 789-804
    • Izui Kazuhiro, N.S.1
  • 19
    • 34748820312 scopus 로고    scopus 로고
    • Jade, [online] Available from
    • Jade, Jade. Jave Agent DEvelopment Framework [online]. Available from: http://jade.cselt.it/
    • Jave Agent DEvelopment Framework
  • 21
    • 55649089427 scopus 로고    scopus 로고
    • Integrated model for production planning and scheduling in a supply chain using benchmarked genetic algorithm
    • Kim Haejoong, J.H.-I. and Park, Jinwoo, 2008. Integrated model for production planning and scheduling in a supply chain using benchmarked genetic algorithm. International Journal of Advanced Manufacturing Technology, 39 (11-12), 1207-1226.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.39 , Issue.11-12 , pp. 1207-1226
    • Kim Haejoong, J.H.-I.1    Jinwoo, P.2
  • 22
    • 0036953789 scopus 로고    scopus 로고
    • Sevilla, Spain: Institute of Electrical and Electronics Engineers Computer Society
    • Leitao, P. and Restivo, F., 2002. Holonic adaptive production control systems. Sevilla, Spain: Institute of Electrical and Electronics Engineers Computer Society, 2968-2973.
    • (2002) Holonic Adaptive Production Control Systems , pp. 2968-2973
    • Leitao, P.1    Restivo, F.2
  • 23
    • 44649183271 scopus 로고    scopus 로고
    • A holonic approach to dynamic manufacturing scheduling
    • Available from
    • Leitao, P. and Restivo, F., 2008. A holonic approach to dynamic manufacturing scheduling. Robotics and Computer-Integrated Manufacturing, 24 (5), 625-634. Available from: http://dx.doi.org/10.1016/j.rcim.2007.09.005
    • (2008) Robotics and Computer-Integrated Manufacturing , vol.24 , Issue.5 , pp. 625-634
    • Leitao, P.1    Restivo, F.2
  • 25
    • 45749100041 scopus 로고    scopus 로고
    • Cutting parameters optimization by using particle swarm optimization (pso)
    • Li, J.G., et al., 2008. Cutting parameters optimization by using particle swarm optimization (pso). Applied Mechanics and Materials, 10-12, 879-883.
    • (2008) Applied Mechanics and Materials , vol.10-12 , pp. 879-883
    • Li, J.G.1
  • 26
    • 7944230912 scopus 로고    scopus 로고
    • Scheduling the production of hot rolling steel tube: A rule-based heuristics
    • Li Jianxiang, T., et al., 2004. Scheduling the production of hot rolling steel tube: A rule-based heuristics. Iron and Steel (Peking), 39 (9), 39-45.
    • (2004) Iron and Steel (Peking) , vol.39 , Issue.9 , pp. 39-45
    • Li Jianxiang, T.1
  • 27
    • 33751504128 scopus 로고    scopus 로고
    • A simulated annealingbased optimization approach for integrated process planning and scheduling
    • Li, W.D. and Mcmahon, C.A., 2007. A simulated annealingbased optimization approach for integrated process planning and scheduling. International Journal of Computer Integrated Manufacturing, 20 (1), 80-95.
    • (2007) International Journal of Computer Integrated Manufacturing , vol.20 , Issue.1 , pp. 80-95
    • Li, W.D.1    McMahon, C.A.2
  • 28
    • 55849088752 scopus 로고    scopus 로고
    • Hybrid differential evolution for noisy optimization
    • Location/publisher
    • Liu Bo, Z.X. and Ma Hannan, 2008. Hybrid differential evolution for noisy optimization. IEEE Congress on Evolutionary Computation, 587-592, Location/publisher.
    • (2008) IEEE Congress on Evolutionary Computation , pp. 587-592
    • Liu Bo, Z.X.1    Hannan, M.2
  • 29
    • 1942472550 scopus 로고    scopus 로고
    • Integrated group technology, cell formation, process planning, and production planning with application to the emergency room
    • Malakooti, B.M., Nima, R., and Yang, Ziyong, 2004. Integrated group technology, cell formation, process planning, and production planning with application to the emergency room. International Journal of Production Research, 42 (9), 1769-1786.
    • (2004) International Journal of Production Research , vol.42 , Issue.9 , pp. 1769-1786
    • Malakooti, B.M.1    Nima, R.2    Ziyong, Y.3
  • 32
    • 0034286607 scopus 로고    scopus 로고
    • Developments in holonic production planning and control
    • Available from
    • Mcfarlane, D.C. and Bussman, S., 2000. Developments in holonic production planning and control. Production Planning and Control, 11 (6), 522-536. Available from: http://dx.doi.org/10.1080/095372800414089
    • (2000) Production Planning and Control , vol.11 , Issue.6 , pp. 522-536
    • McFarlane, D.C.1    Bussman, S.2
  • 33
    • 33750718514 scopus 로고    scopus 로고
    • Genetic algorithmbased subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
    • Monch Lars, S.R., et al., 2007. Genetic algorithmbased subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops. European Journal of Operational Research, 177 (3), 2100-2118.
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2100-2118
    • Monch Lars, S.R.1
  • 35
    • 33845341058 scopus 로고    scopus 로고
    • Solving a large-scale precedence constrained scheduling problem with elastic jobs using tabu search
    • Pedersen, C.R., Rasmussen, R.V., and Andersen, K.A., 2007. Solving a large-scale precedence constrained scheduling problem with elastic jobs using tabu search. Computers and Operations Research, 34 (7), 2025-2042.
    • (2007) Computers and Operations Research , vol.34 , Issue.7 , pp. 2025-2042
    • Pedersen, C.R.1    Rasmussen, R.V.2    Andersen, K.A.3
  • 37
    • 0010633241 scopus 로고    scopus 로고
    • Programmer guide, [online] Available from
    • Programmer Guide. Jade programmer's guide [online]. Available from: http://sharon.cselt.it/projects/jade/doc/programmersguide.pdf
    • Jade Programmer's Guide
  • 38
    • 49649084890 scopus 로고    scopus 로고
    • A hybrid differential evolution method for permutation flow-shop scheduling
    • Qian Bin, W.L., et al., 2008. A hybrid differential evolution method for permutation flow-shop scheduling. International Journal of Advanced Manufacturing Technology, 38 (7-8), 757-777.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.38 , Issue.7-8 , pp. 757-777
    • Qian Bin, W.L.1
  • 39
    • 74949129167 scopus 로고    scopus 로고
    • Study on process planning system for holonic manufacturing -(selection of machining sequences and sequences of machining equipment)
    • Available from 5Go to ISI4://000177338900018
    • Rais, S., Sugimura, N., and Kokubun, A., 2002. Study on process planning system for holonic manufacturing -(selection of machining sequences and sequences of machining equipment). JSME International Journal Series C-Mechanical Systems Machine Elements and Manufacturing, 45 (2), 527-533. Available from: 5Go to ISI4://000177338900018.
    • (2002) JSME International Journal Series C-Mechanical Systems Machine Elements and Manufacturing , vol.45 , Issue.2 , pp. 527-533
    • Rais, S.1    Sugimura, N.2    Kokubun, A.3
  • 40
    • 0037282048 scopus 로고    scopus 로고
    • A ga-sa multiobjective hybrid search algorithm for integrating lot sizing and sequencing in flow-line scheduling
    • Reddy, M.M. and Ponnambalam, S.G., 2003. A ga-sa multiobjective hybrid search algorithm for integrating lot sizing and sequencing in flow-line scheduling. International Journal of Advanced Manufacturing Technology, 21 (2), 126-137.
    • (2003) International Journal of Advanced Manufacturing Technology , vol.21 , Issue.2 , pp. 126-137
    • Reddy, M.M.1    Ponnambalam, S.G.2
  • 41
    • 56549112491 scopus 로고    scopus 로고
    • Integration of process planning and scheduling-A modified genetic algorithmbased approach
    • Shao Xinyu, L.X., et al., 2009. Integration of process planning and scheduling-a modified genetic algorithmbased approach. Computers and Operations Research, 36 (6), 2082-2096.
    • (2009) Computers and Operations Research , vol.36 , Issue.6 , pp. 2082-2096
    • Shao Xinyu, L.X.1
  • 42
    • 41549140834 scopus 로고    scopus 로고
    • A study on integration of process planning and scheduling system for holonic manufacturing with modification of process plans
    • Available from
    • Shrestha, R., et al., 2008. A study on integration of process planning and scheduling system for holonic manufacturing with modification of process plans. International Journal of Manufacturing Technology and Management, 14 (3-4), 359-378. Available from: http://dx.doi.org/10.1504/IJMTM.2008.017733
    • (2008) International Journal of Manufacturing Technology and Management , vol.14 , Issue.3-4 , pp. 359-378
    • Shrestha, R.1
  • 43
    • 46749150544 scopus 로고    scopus 로고
    • Biddingbased multi-agent system for integrated process planning and scheduling: A data-mining and hybrid tabu-sa algorithm-oriented approach
    • Shukla, S.K., Tiwari, M.K., and Son, Y.J., 2008. Biddingbased multi-agent system for integrated process planning and scheduling: A data-mining and hybrid tabu-sa algorithm-oriented approach. International Journal of Advanced Manufacturing Technology, 38 (1-2), 163-175.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.38 , Issue.1-2 , pp. 163-175
    • Shukla, S.K.1    Tiwari, M.K.2    Son, Y.J.3
  • 45
    • 4344651357 scopus 로고    scopus 로고
    • Integrative process plan model and representation for intelligent distributed manufacturing planning
    • Sormaz, D.N., Arumugam, J., and Rajaraman, S., 2004. Integrative process plan model and representation for intelligent distributed manufacturing planning. International Journal of Production Research, 42 (17), 3397-3417.
    • (2004) International Journal of Production Research , vol.42 , Issue.17 , pp. 3397-3417
    • Sormaz, D.N.1    Arumugam, J.2    Rajaraman, S.3
  • 47
    • 0003853559 scopus 로고    scopus 로고
    • The Mathworks, I., Available from
    • The Mathworks, I., 1998. Fuzzy logic toolbox user's guide. Available from http://www.pdfee.com/fuzzy-logic-toolbox-users-guide.html
    • (1998) Fuzzy Logic Toolbox User's Guide
  • 48
    • 33847049071 scopus 로고    scopus 로고
    • Modelling and simulation of mrp ii activities in multi agent systems
    • Turgay, S.K. and Taskin, H., 2007. Modelling and simulation of mrp ii activities in multi agent systems. Production Planning and Control, 18 (1), 25-34.
    • (2007) Production Planning and Control , vol.18 , Issue.1 , pp. 25-34
    • Turgay, S.K.1    Taskin, H.2
  • 50
    • 0032202527 scopus 로고    scopus 로고
    • Reference architecture for holonic manufacturing systems: Prosa
    • Van Brussel, H., Wyns, J., and Valckenarers, P., 1998. Reference architecture for holonic manufacturing systems: Prosa. Computer in Industry, 37 (2), 255-274.
    • (1998) Computer in Industry , vol.37 , Issue.2 , pp. 255-274
    • Van Brussel, H.1    Wyns, J.2    Valckenarers, P.3
  • 53
    • 45749119521 scopus 로고    scopus 로고
    • Task-oriented hierarchical planning and scheduling for discrete manufacturing enterprise
    • Wang, G.L., Lin, L., and Zhong, S.S., 2008. Task-oriented hierarchical planning and scheduling for discrete manufacturing enterprise. Applied Mechanics and Materials, 10-12, 114-120.
    • (2008) Applied Mechanics and Materials , vol.10-12 , pp. 114-120
    • Wang, G.L.1    Lin, L.2    Zhong, S.S.3
  • 55
    • 0035309164 scopus 로고    scopus 로고
    • Neural network and genetic algorithm-based hybrid approach to expanded jobshop scheduling
    • Yu Haibin, L.W., 2001. Neural network and genetic algorithm-based hybrid approach to expanded jobshop scheduling. Computers and Industrial Engineering, 39 (3-4), 337-356.
    • (2001) Computers and Industrial Engineering , vol.39 , Issue.3-4 , pp. 337-356
    • Yu Haibin, L.W.1
  • 56
    • 0242269797 scopus 로고    scopus 로고
    • Integration of process planning and scheduling by exploring the flexibility of process planning
    • Zhang, Y.F., Saravanan, A.N., and Fuh, J.Y.H., 2003. Integration of process planning and scheduling by exploring the flexibility of process planning. International Journal of Production Research, 41 (3), 611-628.
    • (2003) International Journal of Production Research , vol.41 , Issue.3 , pp. 611-628
    • Zhang, Y.F.1    Saravanan, A.N.2    Fuh, J.Y.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.