-
1
-
-
0034147405
-
Hierarchical stochastic production planning with delay interaction
-
Yan HS (2000) Hierarchical stochastic production planning with delay interaction. J Optim Theory Appl 104:659-689
-
(2000)
J Optim Theory Appl
, vol.104
, pp. 659-689
-
-
Yan, H.S.1
-
2
-
-
0036259812
-
Hierarchical production planning in flexible automated workshops with delay interaction
-
Yan HS (2002) Hierarchical production planning in flexible automated workshops with delay interaction. Int J Adv Manuf Technol 19:358-369
-
(2002)
Int J Adv Manuf Technol
, vol.19
, pp. 358-369
-
-
Yan, H.S.1
-
3
-
-
0000429764
-
An integrated model for job-shop planning and scheduling
-
Lassetre JB (1992) An integrated model for job-shop planning and scheduling. Manage Sci 38:1201-1211
-
(1992)
Manage Sci
, vol.38
, pp. 1201-1211
-
-
Lassetre, J.B.1
-
4
-
-
0042204356
-
Integrated production planning and scheduling on automobile assembly lines
-
Yan HS, Xia QF, Zhu MR, Liu XL, Guo ZM (2003) Integrated production planning and scheduling on automobile assembly lines. IIE Trans 35:711-725
-
(2003)
IIE Trans
, vol.35
, pp. 711-725
-
-
Yan, H.S.1
Xia, Q.F.2
Zhu, M.R.3
Liu, X.L.4
Guo, Z.M.5
-
5
-
-
0031147439
-
Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups
-
Anwar MF, Nagi R (1997) Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups. Int J Prod Res 35:1447-1470
-
(1997)
Int J Prod Res
, vol.35
, pp. 1447-1470
-
-
Anwar, M.F.1
Nagi, R.2
-
6
-
-
0033690423
-
Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
-
Haase K, Kimms A (2000) Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. Int J Prod Econ 66:159-169
-
(2000)
Int J Prod Econ
, vol.66
, pp. 159-169
-
-
Haase, K.1
Kimms, A.2
-
7
-
-
0029388133
-
Solving the combined part sequencing and tool replacement problem for an automated machining center: A tabu search approach
-
Kolahan F, Liang M, Zuo M (1995) Solving the combined part sequencing and tool replacement problem for an automated machining center: a tabu search approach. Comput Ind Eng 28:731-743
-
(1995)
Comput Ind Eng
, vol.28
, pp. 731-743
-
-
Kolahan, F.1
Liang, M.2
Zuo, M.3
-
8
-
-
0033357382
-
Job shop scheduling with beam search
-
Sabuncuoglu I, Bayiz M (1999) Job shop scheduling with beam search. Eur J Oper Res 118:390-412
-
(1999)
Eur J Oper Res
, vol.118
, pp. 390-412
-
-
Sabuncuoglu, I.1
Bayiz, M.2
-
9
-
-
0037411859
-
Optimization of the keyboard arrangement problem using an ant colony algorithm
-
Eggers J, Feillet D, Kehl S, Wagner MO, Yannou B (2003) Optimization of the keyboard arrangement problem using an ant colony algorithm. Eur J Oper Res 148:672-686
-
(2003)
Eur J Oper Res
, vol.148
, pp. 672-686
-
-
Eggers, J.1
Feillet, D.2
Kehl, S.3
Wagner, M.O.4
Yannou, B.5
-
10
-
-
0027912257
-
Simulated annealing for resource-constrained scheduling
-
Jeffcoat DE, Bulfin RL (1993) Simulated annealing for resource-constrained scheduling. Eur J Oper Res 70:43-51
-
(1993)
Eur J Oper Res
, vol.70
, pp. 43-51
-
-
Jeffcoat, D.E.1
Bulfin, R.L.2
-
11
-
-
0033166857
-
A genetic algorithm for multi-level, multi-machine lot sizing and scheduling
-
Kimms A (1999) A genetic algorithm for multi-level, multi-machine lot sizing and scheduling. Comput Oper Res 26:829-848
-
(1999)
Comput Oper Res
, vol.26
, pp. 829-848
-
-
Kimms, A.1
-
12
-
-
0032804338
-
Large-scale optimal VAR planning by hybrid simulated annealing/genetic algorithm
-
Jwo WS, Liu CW, Liu CC (1999) Large-scale optimal VAR planning by hybrid simulated annealing/genetic algorithm. Int J Electr Power Energy Syst 21:39-44
-
(1999)
Int J Electr Power Energy Syst
, vol.21
, pp. 39-44
-
-
Jwo, W.S.1
Liu, C.W.2
Liu, C.C.3
-
13
-
-
0035253962
-
A production scheduling problem using genetic algorithm
-
Knosala R, Wal T (2001) A production scheduling problem using genetic algorithm. J Mater Process Technol 109:90-95
-
(2001)
J Mater Process Technol
, vol.109
, pp. 90-95
-
-
Knosala, R.1
Wal, T.2
-
14
-
-
0032592184
-
A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: Hybrid genetic search strategies
-
Cheng RW, Gen M, Tsujimura Y (1999) A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies. Comput Ind Eng 36:343-364
-
(1999)
Comput Ind Eng
, vol.36
, pp. 343-364
-
-
Cheng, R.W.1
Gen, M.2
Tsujimura, Y.3
-
15
-
-
0032484447
-
Genetic algorithm approach to earliness and tardiness production scheduling and planning problem
-
Li Y, Ip WH, Wang DW (1998) Genetic algorithm approach to earliness and tardiness production scheduling and planning problem. Int J Prod Econ 54:65-76
-
(1998)
Int J Prod Econ
, vol.54
, pp. 65-76
-
-
Li, Y.1
Ip, W.H.2
Wang, D.W.3
-
18
-
-
0029368231
-
Solving fuzzy assembly-line balancing problem with genetic algorithms
-
Tsujimura Y, Gen M, Kubota E (1995) Solving fuzzy assembly-line balancing problem with genetic algorithms. Comput Ind Eng 29:543-547
-
(1995)
Comput Ind Eng
, vol.29
, pp. 543-547
-
-
Tsujimura, Y.1
Gen, M.2
Kubota, E.3
|