메뉴 건너뛰기




Volumn 49, Issue 5, 2011, Pages 1373-1389

Agent-based dynamic integrated process planning and scheduling in flexible manufacturing systems

Author keywords

flexible manufacturing system; integrated process planning and scheduling; mathematical programming; multi agent system; real time scheduling

Indexed keywords

AGENT BASED; ALTERNATIVE MANUFACTURING PROCESS; ALTERNATIVE PROCESS PLANS; COORDINATION AGENTS; DYNAMIC SYSTEMS; EXECUTION PHASE; INTEGRATED PROCESS PLANNING AND SCHEDULING; JOB AGENTS; MANUFACTURING OPERATIONS; MANUFACTURING PLANNING; MANUFACTURING RESOURCE; MANUFACTURING SYSTEM; MECHANICAL DESIGN; MULTIAGENT ARCHITECTURE; NEGOTIATION PROTOCOL; PLANNING AND SCHEDULING; PLANNING PHASE; PROCESS PLAN; REAL TIME SCHEDULING; RESOURCE UTILISATION; ROBOT INTERFACE; SEARCH ALGORITHMS; SIMULATION SOFTWARE; TIME SPAN;

EID: 78650612970     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.518741     Document Type: Article
Times cited : (41)

References (13)
  • 1
    • 33746851108 scopus 로고    scopus 로고
    • Efficient manufacturing system implementation based on combination between real and virtual factory
    • Hibino, H., Inukai, T., and Fukuda, Y., 2006. Efficient manufacturing system implementation based on combination between real and virtual factory. International Journal of Production Research, 44 (18-19), 3897-3915.
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3897-3915
    • Hibino, H.1    Inukai, T.2    Fukuda, Y.3
  • 2
    • 30544441225 scopus 로고    scopus 로고
    • ADACOR: A holonic architecture for agile and adaptive manufacturing control
    • Leitao, P. and Restivo, F., 2006. ADACOR: A holonic architecture for agile and adaptive manufacturing control. Computers in Industry, 57 (2), 121-130.
    • (2006) Computers in Industry , vol.57 , Issue.2 , pp. 121-130
    • Leitao, P.1    Restivo, F.2
  • 3
    • 70149094122 scopus 로고    scopus 로고
    • Agent-based distributed manufacturing control: A state-of-the-art-survey
    • Leitao, P., 2009. Agent-based distributed manufacturing control: a state-of-the-art-survey. Engineering Applications of Artificial Intelligence, 22 (7), 979-991.
    • (2009) Engineering Applications of Artificial Intelligence , vol.22 , Issue.7 , pp. 979-991
    • Leitao, P.1
  • 4
    • 2042478705 scopus 로고    scopus 로고
    • An integrated agent-based approach for responsive control of manufacturing resources
    • Lim, M.K. and Zhang, D.Z., 2004. An integrated agent-based approach for responsive control of manufacturing resources. Computers and Industrial Engineering, 46 (2), 221-232.
    • (2004) Computers and Industrial Engineering , vol.46 , Issue.2 , pp. 221-232
    • Lim, M.K.1    Zhang, D.Z.2
  • 5
    • 0034286607 scopus 로고    scopus 로고
    • Developments in holonic production planning and control
    • McFarlane, D.C. and Bussmann, S., 2000. Developments in holonic production planning and control. Production Planning and Control, 11 (6), 522-536.
    • (2000) Production Planning and Control , vol.11 , Issue.6 , pp. 522-536
    • McFarlane, D.C.1    Bussmann, S.2
  • 6
    • 0141954033 scopus 로고    scopus 로고
    • Editorial of the special issue on agent based manufacturing process planning and scheduling
    • Shen, W. and Ghenniwa, H., 2003. Editorial of the special issue on agent based manufacturing process planning and scheduling. Journal of Intelligent Manufacturing, 14 (5), 427-428.
    • (2003) Journal of Intelligent Manufacturing , vol.14 , Issue.5 , pp. 427-428
    • Shen, W.1    Ghenniwa, H.2
  • 8
    • 77955653129 scopus 로고    scopus 로고
    • A study on integration of process planning and scheduling for holonic manufacturing
    • Sugimura, N., Shrestha, R., and Takemoto, T., 2005. A study on integration of process planning and scheduling for holonic manufacturing. CIRP - Journal of Manufacturing Systems, 6 (34), 323-329.
    • (2005) CIRP - Journal of Manufacturing Systems , vol.6 , Issue.34 , pp. 323-329
    • Sugimura, N.1    Shrestha, R.2    Takemoto, T.3
  • 9
    • 77955665692 scopus 로고    scopus 로고
    • A search algorithm for generating alternative process plans in flexible manufacturing system
    • Tehrani, H., et al., 2007. A search algorithm for generating alternative process plans in flexible manufacturing system. Journal of Advanced Mechanical Design, System, and Manufacturing, 1 (5), 706-716.
    • (2007) Journal of Advanced Mechanical Design, System, and Manufacturing , vol.1 , Issue.5 , pp. 706-716
    • Tehrani, H.1
  • 10
    • 0032202527 scopus 로고    scopus 로고
    • Reference architecture for holonic manufacturing systems: PROSA
    • Van Brussel, H., et al., 1998. Reference architecture for holonic manufacturing systems: PROSA. Computers in Industry, 37 (3), 255-274.
    • (1998) Computers in Industry , vol.37 , Issue.3 , pp. 255-274
    • Van Brussel, H.1
  • 11
    • 0141988713 scopus 로고    scopus 로고
    • DPP: An agent-based approach for distributed process planning
    • Wang, L. and Shen, W., 2003. DPP: An agent-based approach for distributed process planning. Journal of Intelligent Manufacturing, 14 (5), 429-440.
    • (2003) Journal of Intelligent Manufacturing , vol.14 , Issue.5 , pp. 429-440
    • Wang, L.1    Shen, W.2
  • 13
    • 33746794581 scopus 로고    scopus 로고
    • Integrated process planning and scheduling/rescheduling - An agent-based approach
    • Wong, T.N., et al., 2006. Integrated process planning and scheduling/rescheduling - an agent-based approach. International Journal of Production Research, 44 (18-19), 3627-3655.
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3627-3655
    • Wong, T.N.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.