-
1
-
-
77956617735
-
Rapid 3D object detection and modeling using range data from 3D range imaging camera for heavy equipment operation
-
H. Son, C. Kim, and K. Choi Rapid 3D object detection and modeling using range data from 3D range imaging camera for heavy equipment operation Autom. Constr. 19 7 2010 898 906
-
(2010)
Autom. Constr.
, vol.19
, Issue.7
, pp. 898-906
-
-
Son, H.1
Kim, C.2
Choi, K.3
-
2
-
-
77955716869
-
Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system
-
J. Teizer, B.S. Allread, C.E. Fullerton, and J. Hinze Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system Autom. Constr. 19 5 2010 630 640
-
(2010)
Autom. Constr.
, vol.19
, Issue.5
, pp. 630-640
-
-
Teizer, J.1
Allread, B.S.2
Fullerton, C.E.3
Hinze, J.4
-
3
-
-
35348874797
-
Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
-
J. Teizer, C.H. Caldas, and C.T. Haas Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources ASCE J. Constr. Eng. Manag. 133 11 2007 880 888
-
(2007)
ASCE J. Constr. Eng. Manag.
, vol.133
, Issue.11
, pp. 880-888
-
-
Teizer, J.1
Caldas, C.H.2
Haas, C.T.3
-
4
-
-
77956612137
-
3D structural component recognition and modeling method using color and 3D data for construction progress monitoring
-
H. Son, and C. Kim 3D structural component recognition and modeling method using color and 3D data for construction progress monitoring Autom. Constr. 19 7 2010 844 854
-
(2010)
Autom. Constr.
, vol.19
, Issue.7
, pp. 844-854
-
-
Son, H.1
Kim, C.2
-
5
-
-
0036778649
-
A framework for rapid local area modeling for construction automation
-
Y. Cho, C. Haas, K. Liapi, and S. Sreenivasan A framework for rapid local area modeling for construction automation Autom. Constr. 11 6 2002 629 641
-
(2002)
Autom. Constr.
, vol.11
, Issue.6
, pp. 629-641
-
-
Cho, Y.1
Haas, C.2
Liapi, K.3
Sreenivasan, S.4
-
6
-
-
13944255456
-
Error analysis and correction for large scale manipulators in construction
-
Y. Cho, C. Haas, S. Sreenivasan, and K. Liapi Error analysis and correction for large scale manipulators in construction ASCE J. Constr. Eng. Manag. 130 1 2004 50 58
-
(2004)
ASCE J. Constr. Eng. Manag.
, vol.130
, Issue.1
, pp. 50-58
-
-
Cho, Y.1
Haas, C.2
Sreenivasan, S.3
Liapi, K.4
-
7
-
-
84878346155
-
Target-focused local workspace modeling for construction automation applications
-
Y. Cho, C. Wang, P. Tang, and C. Haas Target-focused local workspace modeling for construction automation applications ASCE J. Comput. Civil Eng. 26 5 2012 661 670
-
(2012)
ASCE J. Comput. Civil Eng.
, vol.26
, Issue.5
, pp. 661-670
-
-
Cho, Y.1
Wang, C.2
Tang, P.3
Haas, C.4
-
8
-
-
0037930552
-
Rapid geometric modeling for unstructured construction workspaces
-
Y. Cho, and C. Haas Rapid geometric modeling for unstructured construction workspaces J. Comput. Aided Civ. Infrastruct. Eng. 18 2003 242 253
-
(2003)
J. Comput. Aided Civ. Infrastruct. Eng.
, vol.18
, pp. 242-253
-
-
Cho, Y.1
Haas, C.2
-
9
-
-
40649110285
-
Data processing for real-time construction site spatial modeling
-
J. Gong, and C.H. Caldas Data processing for real-time construction site spatial modeling Autom. Constr. 17 5 2008 526 535
-
(2008)
Autom. Constr.
, vol.17
, Issue.5
, pp. 526-535
-
-
Gong, J.1
Caldas, C.H.2
-
10
-
-
77956619234
-
Automatic reconstruction of as-build building information models from laser-scanned point clouds: A review of related techniques
-
P. Tang, D. Huber, B. Akinci, and R. Lipman Automatic reconstruction of as-build building information models from laser-scanned point clouds: a review of related techniques Autom. Constr. 19 2010 829 843
-
(2010)
Autom. Constr.
, vol.19
, pp. 829-843
-
-
Tang, P.1
Huber, D.2
Akinci, B.3
Lipman, R.4
-
11
-
-
77953724912
-
Using laser scanner for modeling and analysis in architecture, engineering and construction
-
D. Huber, B. Akinci, P. Tang, and A. Adan Using laser scanner for modeling and analysis in architecture, engineering and construction Proceedings of the Conference on Information Sciences and Systems (CISS) (2010) Princeton, NJ 2010
-
(2010)
Proceedings of the Conference on Information Sciences and Systems (CISS) (2010) Princeton, NJ
-
-
Huber, D.1
Akinci, B.2
Tang, P.3
Adan, A.4
-
12
-
-
84863744421
-
Fully automated registration of 3D CAD model with point cloud from construction site
-
C. Kim, J. Lee, M. Cho, and C. Kim Fully automated registration of 3D CAD model with point cloud from construction site 28th International Symposium on Automation and Robotics in Construction, Seoul, Korea 2011 917 922
-
(2011)
28th International Symposium on Automation and Robotics in Construction, Seoul, Korea
, pp. 917-922
-
-
Kim, C.1
Lee, J.2
Cho, M.3
Kim, C.4
-
13
-
-
67949086658
-
A laser-technology-based lifting-path tracking system for a robotic tower crane
-
G. Lee, H. Kim, C. Lee, S. Ham, S. Yun, H. Cho, B. Kim, G. Kim, and K. Kim A laser-technology-based lifting-path tracking system for a robotic tower crane Autom. Constr. 18 7 2009 865 874
-
(2009)
Autom. Constr.
, vol.18
, Issue.7
, pp. 865-874
-
-
Lee, G.1
Kim, H.2
Lee, C.3
Ham, S.4
Yun, S.5
Cho, H.6
Kim, B.7
Kim, G.8
Kim, K.9
-
15
-
-
80053580033
-
Automated vision tracking of project related entities
-
I. Brilakis, M. Park, and G. Jog Automated vision tracking of project related entities Adv. Eng. Inform. 25 2011 713 724
-
(2011)
Adv. Eng. Inform.
, vol.25
, pp. 713-724
-
-
Brilakis, I.1
Park, M.2
Jog, G.3
-
16
-
-
84865863663
-
Three-dimensional tracking of construction resources using an on-site camera system
-
M. Park, C. Koch, and I. Brilakis Three-dimensional tracking of construction resources using an on-site camera system J. Comput. Civ. Eng. 26 4 2012 541 549
-
(2012)
J. Comput. Civ. Eng.
, vol.26
, Issue.4
, pp. 541-549
-
-
Park, M.1
Koch, C.2
Brilakis, I.3
-
17
-
-
84906251740
-
Projection-Recognition-Projection (PRP) method for rapid object recognition and registration from a 3D point cloud
-
(doi: 10.1061/(ASCE) CP.1943-5487.0000332, in press)
-
Y. Cho, and M. Gai Projection-Recognition-Projection (PRP) method for rapid object recognition and registration from a 3D point cloud J. Comput. Civ. Eng. 2013 (doi: 10.1061/(ASCE) CP.1943-5487.0000332, in press)
-
(2013)
J. Comput. Civ. Eng.
-
-
Cho, Y.1
Gai, M.2
-
18
-
-
84886554707
-
As-is 3D thermal modeling for existing building envelopes using a hybrid LIDAR system
-
C. Wang, Y. Cho, and M. Gai As-is 3D thermal modeling for existing building envelopes using a hybrid LIDAR system ASCE J. Comput. Civil Eng. 27 6 2013 645 656
-
(2013)
ASCE J. Comput. Civil Eng.
, vol.27
, Issue.6
, pp. 645-656
-
-
Wang, C.1
Cho, Y.2
Gai, M.3
-
19
-
-
34249724458
-
An approach for real world data modeling with the 3D terrestrial laser scanner for built environment
-
Y. Arayici An approach for real world data modeling with the 3D terrestrial laser scanner for built environment Autom. Constr. 16 6 2007 816 829
-
(2007)
Autom. Constr.
, vol.16
, Issue.6
, pp. 816-829
-
-
Arayici, Y.1
-
20
-
-
38649103110
-
Automated retrieval of 3D CAD model objects in construction range images
-
F. Bosche, and C.T. Haas Automated retrieval of 3D CAD model objects in construction range images Autom. Constr. 17 4 2008 499 512
-
(2008)
Autom. Constr.
, vol.17
, Issue.4
, pp. 499-512
-
-
Bosche, F.1
Haas, C.T.2
-
24
-
-
33646168031
-
Human-assisted obstacle avoidance system using 3D workspace modeling for construction equipment operation
-
C. Kim, C. Haas, K. Liapi, and C. Caldas Human-assisted obstacle avoidance system using 3D workspace modeling for construction equipment operation ASCE J. Comput. Civil Eng. 20 3 2006 177 186
-
(2006)
ASCE J. Comput. Civil Eng.
, vol.20
, Issue.3
, pp. 177-186
-
-
Kim, C.1
Haas, C.2
Liapi, K.3
Caldas, C.4
-
25
-
-
0035498658
-
A 2D-3D model-based approach to real-time visual tracking
-
É. Marchand, P. Bouthemy, and F. Chaumette A 2D-3D model-based approach to real-time visual tracking Image Vis. Comput. 19 2001 941 955
-
(2001)
Image Vis. Comput.
, vol.19
, pp. 941-955
-
-
Marchand, É.1
Bouthemy, P.2
Chaumette, F.3
-
26
-
-
84862125657
-
A BIM- and sensor-based tower crane navigation system for blind lifts
-
G. Lee, J. Cho, S. Ham, T. Lee, G. Lee, S.-H. Yun, and et al. A BIM- and sensor-based tower crane navigation system for blind lifts Autom. Constr. 26 2012 1 10
-
(2012)
Autom. Constr.
, vol.26
, pp. 1-10
-
-
Lee, G.1
Cho, J.2
Ham, S.3
Lee, T.4
Lee, G.5
Yun, S.-H.6
-
27
-
-
84860126303
-
Near real-time motion planning and simulation of cranes in construction: Framework and system architecture
-
H. AlBahnassi, and A. Hammad Near real-time motion planning and simulation of cranes in construction: framework and system architecture J. Comput. Civ. Eng. 2011 54 63
-
(2011)
J. Comput. Civ. Eng.
, pp. 54-63
-
-
AlBahnassi, H.1
Hammad, A.2
-
28
-
-
84857373763
-
Ultra-wide band technology experiments for real-time prevention of tower crane collisions
-
S. Hwang Ultra-wide band technology experiments for real-time prevention of tower crane collisions Autom. Constr. 22 2012 545 553
-
(2012)
Autom. Constr.
, vol.22
, pp. 545-553
-
-
Hwang, S.1
-
29
-
-
84871768758
-
A methodology for mobile crane lift path checking in heavy industrial projects
-
Z. Lei, H. Taghaddos, U. Hermann, and M. Al-Hussein A methodology for mobile crane lift path checking in heavy industrial projects Autom. Constr. 31 2013 41 53
-
(2013)
Autom. Constr.
, vol.31
, pp. 41-53
-
-
Lei, Z.1
Taghaddos, H.2
Hermann, U.3
Al-Hussein, M.4
-
30
-
-
84874741375
-
Crane pose estimation using UWB real-time location system
-
C. Zhang, A. Hammad, and S. Rodriguez Crane pose estimation using UWB real-time location system J. Comput. Civ. Eng. 2011 625 637
-
(2011)
J. Comput. Civ. Eng.
, pp. 625-637
-
-
Zhang, C.1
Hammad, A.2
Rodriguez, S.3
|