메뉴 건너뛰기




Volumn 9, Issue 3, 2015, Pages 327-343

Integrating production and transportation scheduling in a two-stage supply chain

Author keywords

Electromagnetism like mechanism; Scheduling; Transportation; Two stage supply chain

Indexed keywords

GENETIC ALGORITHMS; SCHEDULING; SUPPLY CHAINS; TRANSPORTATION;

EID: 84929625835     PISSN: 17515254     EISSN: 17515262     Source Type: Journal    
DOI: 10.1504/EJIE.2015.069344     Document Type: Article
Times cited : (12)

References (20)
  • 1
    • 55349087889 scopus 로고    scopus 로고
    • Supply chain coordination: Perspectives, empirical studies and research directions
    • Arshinder, K.A. and Deshmukh, S.G. (2008) 'Supply chain coordination: perspectives, empirical studies and research directions', International Journal of Production Economics, Vol. 115, No. 2, pp.316-335.
    • (2008) International Journal of Production Economics , vol.115 , Issue.2 , pp. 316-335
    • Arshinder, K.A.1    Deshmukh, S.G.2
  • 2
    • 84867922216 scopus 로고    scopus 로고
    • An electromagnetism-like mechanism for global optimization
    • Birbil, Ş.I. and Fang, S.C. (2003) 'An electromagnetism-like mechanism for global optimization', Journal of Global Optimization, Vol. 25, No. 3, pp.263-282.
    • (2003) Journal of Global Optimization , vol.25 , Issue.3 , pp. 263-282
    • Birbil Ş., I.1    Fang, S.C.2
  • 3
    • 56349124838 scopus 로고    scopus 로고
    • A hybrid electromagnetism-like algorithm for single machine scheduling problem
    • Chang, P.C., Chen, S.H. and Fan, C.Y. (2009) 'A hybrid electromagnetism-like algorithm for single machine scheduling problem', Expert Systems with Applications, Vol. 36, No. 2, pp.1259-1267.
    • (2009) Expert Systems with Applications , vol.36 , Issue.2 , pp. 1259-1267
    • Chang, P.C.1    Chen, S.H.2    Fan, C.Y.3
  • 4
    • 77249147436 scopus 로고    scopus 로고
    • Integrated production and outbound distribution scheduling: Review and extensions
    • Chen, Z.L. (2010) 'Integrated production and outbound distribution scheduling: review and extensions', Operations Research, Vol. 58, No. 1, pp.1711-1725.
    • (2010) Operations Research , vol.58 , Issue.1 , pp. 1711-1725
    • Chen, Z.L.1
  • 5
    • 33745748011 scopus 로고    scopus 로고
    • The electromagnetism meta-heuristic applied to the resource-constrained project scheduling problem
    • Debels, D. and Vanhoucke, M. (2006) 'The electromagnetism meta-heuristic applied to the resource-constrained project scheduling problem', Artificial Evolution, Vol. 3871, pp.259-270.
    • (2006) Artificial Evolution , vol.3871 , pp. 259-270
    • Debels, D.1    Vanhoucke, M.2
  • 6
    • 25444456205 scopus 로고    scopus 로고
    • A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
    • Debels, D., Reyck, B.D., Leus, R. and Vanhoucke, M. (2006) 'A hybrid scatter search/electromagnetism meta-heuristic for project scheduling', European Journal of Operational Research, Vol. 169, No. 2, pp.638-653.
    • (2006) European Journal of Operational Research , vol.169 , Issue.2 , pp. 638-653
    • Debels, D.1    Reyck, B.D.2    Leus, R.3    Vanhoucke, M.4
  • 7
    • 0032661559 scopus 로고    scopus 로고
    • Integrated production/distribution planning in supply chains: An invited review
    • Erenguc, S.S., Simpson, N.C. and Vakharia, A.J. (1999) 'Integrated production/distribution planning in supply chains: an invited review', European Journal of Operational Research, Vol. 115, No. 2, pp.219-236.
    • (1999) European Journal of Operational Research , vol.115 , Issue.2 , pp. 219-236
    • Erenguc, S.S.1    Simpson, N.C.2    Vakharia, A.J.3
  • 8
    • 84887298133 scopus 로고    scopus 로고
    • Production scheduling problem with delivery considerations in a mono-product supply chain environment to minimise the total joint cost
    • Grunder, O., Wang, D. and Moudni, A.E. (2013) 'Production scheduling problem with delivery considerations in a mono-product supply chain environment to minimise the total joint cost', European Journal of Industrial Engineering, Vol. 7, No. 5, pp.615-634.
    • (2013) European Journal of Industrial Engineering , vol.7 , Issue.5 , pp. 615-634
    • Grunder, O.1    Wang, D.2    Moudni, A.E.3
  • 9
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • Hall, N.G. and Potts, C.N. (2003) 'Supply chain scheduling: batching and delivery', Operations Research, Vol. 51, No. 4, pp.566-584.
    • (2003) Operations Research , vol.51 , Issue.4 , pp. 566-584
    • Hall, N.G.1    Potts, C.N.2
  • 10
    • 79960576373 scopus 로고    scopus 로고
    • Integrated supply chain planning based on a combined application of operations research and optimal control
    • Ivanov, D., Sokolov, B. and Kaeschel, J. (2010) 'Integrated supply chain planning based on a combined application of operations research and optimal control', Central European Journal of Operations Research, Vol. 19, No. 3, pp.299-317.
    • (2010) Central European Journal of Operations Research , vol.19 , Issue.3 , pp. 299-317
    • Ivanov, D.1    Sokolov, B.2    Kaeschel, J.3
  • 11
    • 80255132108 scopus 로고    scopus 로고
    • A fuzzy goal programming and meta heuristic algorithms for solving integrated production: Distribution planning problem
    • Jolai, F., Razmi, J. and Rostami. N.K.M. (2010) 'A fuzzy goal programming and meta heuristic algorithms for solving integrated production: distribution planning problem', Central European Journal of Operations Research, Vol. 19, No. 4, pp.547-569.
    • (2010) Central European Journal of Operations Research , vol.19 , Issue.4 , pp. 547-569
    • Jolai, F.1    Razmi, J.2    Rostami, N.K.M.3
  • 12
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • Lee, C.Y. and Chen, Z.L. (2001) 'Machine scheduling with transportation considerations', Journal of Scheduling, Vol. 4, pp.3-24.
    • (2001) Journal of Scheduling , vol.4 , pp. 3-24
    • Lee, C.Y.1    Chen, Z.L.2
  • 13
    • 58049192830 scopus 로고    scopus 로고
    • A least flexibility first heuristic to coordinate setups in a two-or three-stage supply chain
    • Liao, C.J., Shyu, C.C. and Tseng, C.T. (2009) 'A least flexibility first heuristic to coordinate setups in a two-or three-stage supply chain', International Journal of Production Economics, Vol. 117, No. 1, pp.127-135.
    • (2009) International Journal of Production Economics , vol.117 , Issue.1 , pp. 127-135
    • Liao, C.J.1    Shyu, C.C.2    Tseng, C.T.3
  • 14
    • 34547205257 scopus 로고    scopus 로고
    • An electromagnetic meta-heuristic for the nurse scheduling problem
    • Maenhout, B. and Vanhoucke, M. (2007) 'An electromagnetic meta-heuristic for the nurse scheduling problem', Journal of Heuristics, Vol. 13, No. 4, pp.359-385.
    • (2007) Journal of Heuristics , vol.13 , Issue.4 , pp. 359-385
    • Maenhout, B.1    Vanhoucke, M.2
  • 16
    • 84863681431 scopus 로고    scopus 로고
    • Online scheduling of flexible job-shops with blocking and transportation
    • Poppenborg, J., Knust, S. and Hertzberg, J. (2012) 'Online scheduling of flexible job-shops with blocking and transportation', European Journal of Industrial Engineering, Vol. 6, No. 4, pp.497-518.
    • (2012) European Journal of Industrial Engineering , vol.6 , Issue.4 , pp. 497-518
    • Poppenborg, J.1    Knust, S.2    Hertzberg, J.3
  • 17
    • 33749545539 scopus 로고    scopus 로고
    • Particle swarm optimization and differential evolution for the single machine total weighted tardiness problem
    • Tasgetiren, M.F., Liang, Y.C., Sevkli, M. and Gencyilmaz, G. (2006) 'Particle swarm optimization and differential evolution for the single machine total weighted tardiness problem', International Journal of Production Research, Vol. 44, No. 22, pp.4737-4754.
    • (2006) International Journal of Production Research , vol.44 , Issue.22 , pp. 4737-4754
    • Tasgetiren, M.F.1    Liang, Y.C.2    Sevkli, M.3    Gencyilmaz, G.4
  • 18
    • 55149111576 scopus 로고    scopus 로고
    • Production scheduling with supply and delivery considerations to minimize the makespan
    • Wang, X. and Cheng, T.C.E. (2009) 'Production scheduling with supply and delivery considerations to minimize the makespan', European Journal of Operational Research, Vol. 194, No 3, pp.743-752.
    • (2009) European Journal of Operational Research , vol.194 , Issue.3 , pp. 743-752
    • Wang, X.1    Cheng, T.C.E.2
  • 20
    • 77949490486 scopus 로고    scopus 로고
    • A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain
    • Zegordi, S.H., Kamal Abadi, I.N. and Beheshti Nia, M.A. (2010) 'A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain', Computers & Industrial Engineering, Vol. 58, No. 3, pp.373-381.
    • (2010) Computers & Industrial Engineering , vol.58 , Issue.3 , pp. 373-381
    • Zegordi, S.H.1    Kamal Abadi, I.N.2    Beheshti Nia, M.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.