-
3
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
Bean J.C. Genetic algorithms and random keys for sequencing and optimization. ORSA Journal on Computing 6 2 (1994) 154-160
-
(1994)
ORSA Journal on Computing
, vol.6
, Issue.2
, pp. 154-160
-
-
Bean, J.C.1
-
4
-
-
38249011510
-
Scheduling with release dates on a single machine to minimize total weighted completion time
-
Belouadah H., Posner M.E., and Potts C.N. Scheduling with release dates on a single machine to minimize total weighted completion time. Discrete Applied Mathematics 36 (1992) 213-231
-
(1992)
Discrete Applied Mathematics
, vol.36
, pp. 213-231
-
-
Belouadah, H.1
Posner, M.E.2
Potts, C.N.3
-
5
-
-
84867922216
-
An Electromagnetism-like Mechanism for Global Optimization
-
Birbil S.I., and Fang S.C. An Electromagnetism-like Mechanism for Global Optimization. Journal of Global Optimization 25 (2003) 263-282
-
(2003)
Journal of Global Optimization
, vol.25
, pp. 263-282
-
-
Birbil, S.I.1
Fang, S.C.2
-
6
-
-
7044238962
-
A global optimization method for solving fuzzy relation equations
-
Birbil S.I., and Feyzioglu O. A global optimization method for solving fuzzy relation equations. Lecture Notes in Artificial Intelligence 2715 (2003) 718-724
-
(2003)
Lecture Notes in Artificial Intelligence
, vol.2715
, pp. 718-724
-
-
Birbil, S.I.1
Feyzioglu, O.2
-
7
-
-
17844364925
-
-
Birbil, S.I., Gükan, G., & Listes, O. (2004) Solving Stochastic Mathematical Programs with Complementarity Constraints Using Simulation. Winter Simulation Conference 2004, pp. 550-558.
-
Birbil, S.I., Gükan, G., & Listes, O. (2004) Solving Stochastic Mathematical Programs with Complementarity Constraints Using Simulation. Winter Simulation Conference 2004, pp. 550-558.
-
-
-
-
8
-
-
0033130807
-
A Branch and bound approach for single machine scheduling with earliness and tardiness penalties
-
Chang P.C. A Branch and bound approach for single machine scheduling with earliness and tardiness penalties. Computers and Mathematics with Applications 37 (1999) 133-144
-
(1999)
Computers and Mathematics with Applications
, vol.37
, pp. 133-144
-
-
Chang, P.C.1
-
9
-
-
0002672225
-
A greedy heuristic for Bi-criterion single machine scheduling problems
-
Chang P.C., and Lee H.C. A greedy heuristic for Bi-criterion single machine scheduling problems. Computers and Industrial Engineering 22 2 (1992) 121-131
-
(1992)
Computers and Industrial Engineering
, vol.22
, Issue.2
, pp. 121-131
-
-
Chang, P.C.1
Lee, H.C.2
-
10
-
-
0009460332
-
A two phase approach for single machine scheduling: Minimizing the total absolute deviation
-
Chang P.C., and Lee H.C. A two phase approach for single machine scheduling: Minimizing the total absolute deviation. Journal of the Chinese Institute of Engineers 15 6 (1992) 735-742
-
(1992)
Journal of the Chinese Institute of Engineers
, vol.15
, Issue.6
, pp. 735-742
-
-
Chang, P.C.1
Lee, H.C.2
-
11
-
-
34548482951
-
Mining gene structures to inject artificial chromosomes for genetic algorithm in single machine scheduling problems
-
Chang P.C., Chen S.-H., and Fan C.-Y. Mining gene structures to inject artificial chromosomes for genetic algorithm in single machine scheduling problems. Applied Soft Computing Journal 8 1 (2008) 767-777
-
(2008)
Applied Soft Computing Journal
, vol.8
, Issue.1
, pp. 767-777
-
-
Chang, P.C.1
Chen, S.-H.2
Fan, C.-Y.3
-
13
-
-
0347899800
-
Fundamentals of scatter search and path relinking
-
Glover F., Laguna M., and Marti R. Fundamentals of scatter search and path relinking. Control and Cybernetics 39 (2000) 653-684
-
(2000)
Control and Cybernetics
, vol.39
, pp. 653-684
-
-
Glover, F.1
Laguna, M.2
Marti, R.3
-
14
-
-
0019342692
-
Scheduling with release dates on a single machine to minimize total weighted completion time
-
Hariri A.M.A., and Potts C.N. Scheduling with release dates on a single machine to minimize total weighted completion time. Discrete Applied Mathematics 36 (1983) 99-109
-
(1983)
Discrete Applied Mathematics
, vol.36
, pp. 99-109
-
-
Hariri, A.M.A.1
Potts, C.N.2
-
15
-
-
0028734441
-
Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates
-
Kim Y.D., and Yano C.A. Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates. Naval Research logistics 41 (1994) 913-933
-
(1994)
Naval Research logistics
, vol.41
, pp. 913-933
-
-
Kim, Y.D.1
Yano, C.A.2
-
17
-
-
0031076201
-
Single machine earliness and tardiness scheduling
-
Li G. Single machine earliness and tardiness scheduling. European Journal of Operational Research 96 (1997) 546-558
-
(1997)
European Journal of Operational Research
, vol.96
, pp. 546-558
-
-
Li, G.1
-
18
-
-
0033165933
-
A branch and bound algorithm for the single machine earliness and tardiness scheduling problem
-
Liaw C.F. A branch and bound algorithm for the single machine earliness and tardiness scheduling problem. Computers and Operations Research 26 (1999) 679-693
-
(1999)
Computers and Operations Research
, vol.26
, pp. 679-693
-
-
Liaw, C.F.1
-
19
-
-
56349109913
-
-
Mendes, J. J. M., Gonçalves, J. F., & Resende, M. G. C. (2005). A random key based genetic algorithm for the resource constrained project scheduling problem. AT&T Labs Research Technical Report TD-6DUK2C.
-
Mendes, J. J. M., Gonçalves, J. F., & Resende, M. G. C. (2005). A random key based genetic algorithm for the resource constrained project scheduling problem. AT&T Labs Research Technical Report TD-6DUK2C.
-
-
-
-
20
-
-
0033101911
-
A genetic algorithm methodology for complex scheduling problems
-
Norman B.A., and Bean J.C. A genetic algorithm methodology for complex scheduling problems. Naval Research Logistics 46 2 (1999) 199-211
-
(1999)
Naval Research Logistics
, vol.46
, Issue.2
, pp. 199-211
-
-
Norman, B.A.1
Bean, J.C.2
-
21
-
-
0033881315
-
Scheduling operations on parallel machine tools
-
Norman B.A., and Bean J.C. Scheduling operations on parallel machine tools. IIE Transactions 32 5 (2000) 449-459
-
(2000)
IIE Transactions
, vol.32
, Issue.5
, pp. 449-459
-
-
Norman, B.A.1
Bean, J.C.2
-
23
-
-
0003438602
-
-
Prentice Hall, Upper Saddle River, NJ
-
Pinedo M. Scheduling: Theory, algorithms, and systems (2002), Prentice Hall, Upper Saddle River, NJ
-
(2002)
Scheduling: Theory, algorithms, and systems
-
-
Pinedo, M.1
-
24
-
-
33746503980
-
A random-key genetic algorithm for the generalized traveling salesman problem
-
Snyder L.V., and Daskin M.S. A random-key genetic algorithm for the generalized traveling salesman problem. European Journal of Operational Research 174 1 (2006) 38-53
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.1
, pp. 38-53
-
-
Snyder, L.V.1
Daskin, M.S.2
-
25
-
-
56349146858
-
-
Sourd, F., & Sidhoum, S. K. (2005). An efficient algorithm for the earliness/tardiness scheduling problem. Working Paper - LIP6 (http://www-poleia.lip6.fr/sourd/).
-
Sourd, F., & Sidhoum, S. K. (2005). An efficient algorithm for the earliness/tardiness scheduling problem. Working Paper - LIP6 (http://www-poleia.lip6.fr/sourd/).
-
-
-
-
26
-
-
0032114993
-
A heuristic to minimize a quadratic function of job lateness on a single machine
-
Su L.H., and Chang P.C. A heuristic to minimize a quadratic function of job lateness on a single machine. International Journal of Production Economics 55 2 (1998) 169-175
-
(1998)
International Journal of Production Economics
, vol.55
, Issue.2
, pp. 169-175
-
-
Su, L.H.1
Chang, P.C.2
-
27
-
-
0035447093
-
Scheduling n jobs on one machine to minimize the maximum lateness with a minimum number of tardy jobs
-
Su L.H., and Chang P.C. Scheduling n jobs on one machine to minimize the maximum lateness with a minimum number of tardy jobs. Computers and Industrial Engineering 40 4 (2001) 349-360
-
(2001)
Computers and Industrial Engineering
, vol.40
, Issue.4
, pp. 349-360
-
-
Su, L.H.1
Chang, P.C.2
-
28
-
-
4344713798
-
-
Tasgetiren, M. F., Sevkli, M., Liang, Y. C., & Gencyilmaz, G. (2004). Particle swarm optimization algorithm for single machine total weighted tardiness problem. In Proceedings of the 2004 Congress on Evolutionary Computation (CEC'04) (pp. 1412-1419), Portland, Oregon.
-
Tasgetiren, M. F., Sevkli, M., Liang, Y. C., & Gencyilmaz, G. (2004). Particle swarm optimization algorithm for single machine total weighted tardiness problem. In Proceedings of the 2004 Congress on Evolutionary Computation (CEC'04) (pp. 1412-1419), Portland, Oregon.
-
-
-
-
29
-
-
33751236810
-
Particle swarm optimization algorithm for makespan and total flowtime minimization in permutation flowshop sequencing problem
-
Tasgetiren M.F., Sevkli M., Liang Y.C., and Gencyilmaz G. Particle swarm optimization algorithm for makespan and total flowtime minimization in permutation flowshop sequencing problem. European Journal of Operational Research 177 3 (2007) 1930-1947
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1930-1947
-
-
Tasgetiren, M.F.1
Sevkli, M.2
Liang, Y.C.3
Gencyilmaz, G.4
-
30
-
-
56349116674
-
-
Valente, J. M. S., & Alves, R. A. F. S. (2003a). Heuristics for the early/tardy scheduling problem with release dates. Working Paper 129. Faculdade de Economia do Porto, Portugal.
-
Valente, J. M. S., & Alves, R. A. F. S. (2003a). Heuristics for the early/tardy scheduling problem with release dates. Working Paper 129. Faculdade de Economia do Porto, Portugal.
-
-
-
-
31
-
-
56349170212
-
-
Valente, J. M. S., & Alves, R. A. F. S. (2003b). Improved heuristics for the early/tardy scheduling problem with no idle time. Working Paper 126. Faculdade de Economia do Porto, Portugal.
-
Valente, J. M. S., & Alves, R. A. F. S. (2003b). Improved heuristics for the early/tardy scheduling problem with no idle time. Working Paper 126. Faculdade de Economia do Porto, Portugal.
-
-
-
-
32
-
-
24644523580
-
An electromagnetism algorithm of neural network analysis - An application to textile retail operation
-
Wu P., Yang W.H., and Wei N.C. An electromagnetism algorithm of neural network analysis - An application to textile retail operation. Journal of the Chinese Institute of Industrial Engineers 21 1 (2004) 59-67
-
(2004)
Journal of the Chinese Institute of Industrial Engineers
, vol.21
, Issue.1
, pp. 59-67
-
-
Wu, P.1
Yang, W.H.2
Wei, N.C.3
-
33
-
-
33745318887
-
The study of electromagnetism-like mechanism based fuzzy neural network for learning fuzzy if-then rules
-
Wu P., Yang K.J., and Hung Y.Y. The study of electromagnetism-like mechanism based fuzzy neural network for learning fuzzy if-then rules. Lecture Notes in Computer Science 3684 (2005) 382-388
-
(2005)
Lecture Notes in Computer Science
, vol.3684
, pp. 382-388
-
-
Wu, P.1
Yang, K.J.2
Hung, Y.Y.3
-
34
-
-
0027224847
-
One machine rescheduling heuristic with efficiency and stability as criteria
-
Wu S.D., Storer R.H., and Chang P.C. One machine rescheduling heuristic with efficiency and stability as criteria. Computers and Operations Research 20 1 (1993) 1-14
-
(1993)
Computers and Operations Research
, vol.20
, Issue.1
, pp. 1-14
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.C.3
|