메뉴 건너뛰기




Volumn 117, Issue 1, 2009, Pages 127-135

A least flexibility first heuristic to coordinate setups in a two- or three-stage supply chain

Author keywords

Multiple objectives; Scheduling; Setup coordination; Supply chain

Indexed keywords

COMPUTATIONAL METHODS; GENETIC ALGORITHMS; HEURISTIC ALGORITHMS; HEURISTIC METHODS; LANDING; MULTIOBJECTIVE OPTIMIZATION; SCHEDULING; SIMULATED ANNEALING; SUPPLY CHAINS;

EID: 58049192830     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2008.10.002     Document Type: Article
Times cited : (9)

References (18)
  • 3
    • 55349087889 scopus 로고    scopus 로고
    • Supply chain coordination: Perspectives, empirical studies and research directions
    • Arshinder, Kanda A., and Deshmukh S.G. Supply chain coordination: Perspectives, empirical studies and research directions. International Journal of Production Economics 115 (2008) 316-335
    • (2008) International Journal of Production Economics , vol.115 , pp. 316-335
    • Arshinder1    Kanda, A.2    Deshmukh, S.G.3
  • 5
    • 58049207169 scopus 로고    scopus 로고
    • Detti, P., Meloni, C., Pranzo, M., 2004. Simple bounds for the minimum cardinality dominating trail set problem. Technical Report RT-DIA-87-2004. Dipartimento di Informatica e Automazione, Università Roma Tre, Roma, Italy.
    • Detti, P., Meloni, C., Pranzo, M., 2004. Simple bounds for the minimum cardinality dominating trail set problem. Technical Report RT-DIA-87-2004. Dipartimento di Informatica e Automazione, Università Roma Tre, Roma, Italy.
  • 7
    • 34548685672 scopus 로고    scopus 로고
    • Local search algorithms for finding the Hamiltonian completion number of line graphs
    • Detti P., Meloni C., and Pranzo M. Local search algorithms for finding the Hamiltonian completion number of line graphs. Annals of Operation Research 156 (2007) 5-24
    • (2007) Annals of Operation Research , vol.156 , pp. 5-24
    • Detti, P.1    Meloni, C.2    Pranzo, M.3
  • 8
    • 37349053771 scopus 로고    scopus 로고
    • A genetic algorithm to optimize the total cost and service level for just-in-time distribution in a supply chain
    • Farahani R.Z., and Elahipanah M. A genetic algorithm to optimize the total cost and service level for just-in-time distribution in a supply chain. International Journal of Production Economics 111 (2008) 229-243
    • (2008) International Journal of Production Economics , vol.111 , pp. 229-243
    • Farahani, R.Z.1    Elahipanah, M.2
  • 10
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • Hall N.G., and Potts C.N. Supply chain scheduling: Batching and delivery. Operations Research 51 (2003) 566-584
    • (2003) Operations Research , vol.51 , pp. 566-584
    • Hall, N.G.1    Potts, C.N.2
  • 12
    • 27844495113 scopus 로고    scopus 로고
    • Coordination of set-ups between two stages of a supply chain using multi-objective genetic algorithms
    • Mansouri S.A. Coordination of set-ups between two stages of a supply chain using multi-objective genetic algorithms. International Journal of Production Research 43 (2005) 3163-3180
    • (2005) International Journal of Production Research , vol.43 , pp. 3163-3180
    • Mansouri, S.A.1
  • 13
    • 33744522186 scopus 로고    scopus 로고
    • A simulated annealing approach to a bi-criteria sequencing problem in a two-stage supply chain
    • Mansouri S.A. A simulated annealing approach to a bi-criteria sequencing problem in a two-stage supply chain. Computers & Industrial Engineering 50 (2006) 105-119
    • (2006) Computers & Industrial Engineering , vol.50 , pp. 105-119
    • Mansouri, S.A.1
  • 14
    • 23044531427 scopus 로고    scopus 로고
    • An evolutionary algorithm for the sequence coordination in furniture production
    • Meloni C. An evolutionary algorithm for the sequence coordination in furniture production. Lecture Notes of Computer Science 2264 (2001) 91-106
    • (2001) Lecture Notes of Computer Science , vol.2264 , pp. 91-106
    • Meloni, C.1
  • 15
    • 33749359631 scopus 로고    scopus 로고
    • Setup coordination between two stages of a production system: A multi-objective evolutionary approach
    • Meloni C., Naso D., and Turchiano B. Setup coordination between two stages of a production system: A multi-objective evolutionary approach. Annals of Operation Research 147 (2006) 175-198
    • (2006) Annals of Operation Research , vol.147 , pp. 175-198
    • Meloni, C.1    Naso, D.2    Turchiano, B.3
  • 16
    • 33645521599 scopus 로고    scopus 로고
    • Single and multi-objective evolutionary algorithms for the coordination of serial manufacturing operations
    • Naso D., Turchiano B., and Meloni C. Single and multi-objective evolutionary algorithms for the coordination of serial manufacturing operations. Journal of Intelligent Manufacturing 17 (2006) 251-270
    • (2006) Journal of Intelligent Manufacturing , vol.17 , pp. 251-270
    • Naso, D.1    Turchiano, B.2    Meloni, C.3
  • 17
    • 0024070715 scopus 로고
    • Models arising form a flexible manufacturing machine, part I: Minimization of the number of tool switches
    • Tang C.S., and Denardo E.V. Models arising form a flexible manufacturing machine, part I: Minimization of the number of tool switches. Operations Research 36 (1988) 767-777
    • (1988) Operations Research , vol.36 , pp. 767-777
    • Tang, C.S.1    Denardo, E.V.2
  • 18
    • 0032642659 scopus 로고    scopus 로고
    • Parts loading scheduling in a flexible forging machine using an advanced genetic algorithm
    • Tsujimura Y., and Gen M. Parts loading scheduling in a flexible forging machine using an advanced genetic algorithm. Journal of Intelligent Manufacturing 10 (1999) 149-159
    • (1999) Journal of Intelligent Manufacturing , vol.10 , pp. 149-159
    • Tsujimura, Y.1    Gen, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.