-
1
-
-
34250084648
-
Routing and scheduling in a flexible job shop by Tabu search
-
Brandimarte, P. (1993) 'Routing and scheduling in a flexible job shop by Tabu search', Annals of Operations Research, Vol. 41, No. 3, pp.157-183.
-
(1993)
Annals of Operations Research
, vol.41
, Issue.3
, pp. 157-183
-
-
Brandimarte, P.1
-
2
-
-
32944480177
-
Job-shop scheduling with limited capacity buffers
-
DOI 10.1007/s00291-005-0008-1
-
Brucker, P., Heitmann, S., Hurink, J.L. and Nieberg, T. (2006) 'Job-shop scheduling with limited capacity buffers', OR Spectrum, Vol. 28, No. 2, pp.151-176. (Pubitemid 43261024)
-
(2006)
OR Spectrum
, vol.28
, Issue.2
, pp. 151-176
-
-
Brucker, P.1
Heitmann, S.2
Hurink, J.3
Nieberg, T.4
-
3
-
-
0033881336
-
On-line scheduling in a surface treatment system
-
DOI 10.1016/S0377-2217(98)00376-2
-
Chauvet, F., Levne, E., Meyzin, L.K. and Proth, J-M. (2000) 'On-line scheduling in a surface treatment system', European Journal of Operational Research, Vol. 120, No. 2, pp.382-392. (Pubitemid 30542644)
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 382-392
-
-
Chauvet, F.1
Levner, E.2
Meyzin, L.K.3
Proth, J.-M.4
-
4
-
-
47949112873
-
Safe humanrobot interaction in a life science environment
-
Fritzsche, M., Schulenburg, E., Elkmann, N., Girstl, A., Stiene, S. and Teutsch, C. (2007) 'Safe humanrobot interaction in a life science environment', in IEEE International Workshop on Safety, Security, and Rescue Robotics (SSRR 2007), pp.1-6.
-
(2007)
IEEE International Workshop on Safety, Security, and Rescue Robotics (SSRR 2007)
, pp. 1-6
-
-
Fritzsche, M.1
Schulenburg, E.2
Elkmann, N.3
Girstl, A.4
Stiene, S.5
Teutsch, C.6
-
6
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
Hall, N.G. and Sriskandarajah, C. (1996) 'A survey of machine scheduling problems with blocking and no-wait in process', Operations Research, Vol. 44, No. 3. pp.510-525. (Pubitemid 126669516)
-
(1996)
Operations Research
, vol.44
, Issue.3
, pp. 510-525
-
-
Hall, N.G.1
Sriskandarajah, C.2
-
7
-
-
8344272087
-
Tabu search algorithms for job-shop problems with a single transport robot
-
April
-
Hurink, J. and Knust, S. (2005) 'Tabu search algorithms for job-shop problems with a single transport robot', European Journal of Operational Research, April, Vol. 162, No. 1, pp.99-111.
-
(2005)
European Journal of Operational Research
, vol.162
, Issue.1
, pp. 99-111
-
-
Hurink, J.1
Knust, S.2
-
8
-
-
69849107136
-
Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints
-
Jabbarizadeh, F., Zandieh, M. and Talebi, D. (2009) 'Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints', Computers and Industrial Engineering, Vol. 57, No. 3, pp.949-957.
-
(2009)
Computers and Industrial Engineering
, vol.57
, Issue.3
, pp. 949-957
-
-
Jabbarizadeh, F.1
Zandieh, M.2
Talebi, D.3
-
9
-
-
0039140289
-
On an automated two-machine flowshop scheduling problem with infinite buffer
-
Kise, H. (1991) 'On an automated two-machine flowshop scheduling problem with infinite buffer', Journal of the Operations Research Society of Japan, Vol. 34, No. 3, pp.354-361.
-
(1991)
Journal of the Operations Research Society of Japan
, vol.34
, Issue.3
, pp. 354-361
-
-
Kise, H.1
-
10
-
-
0141556617
-
-
PhD thesis, University of Osnabrueck, Department of Mathematics/Computer Science
-
Knust, S. (1999) 'Shop-scheduling problems with transportation', PhD thesis, University of Osnabrueck, Department of Mathematics/Computer Science.
-
(1999)
Shop-scheduling Problems with Transportation
-
-
Knust, S.1
-
11
-
-
77955451628
-
-
Konrad-Zuse-Zentrum für Informationstechnik Berlin
-
Konrad-Zuse-Zentrum für Informationstechnik Berlin (2010) SCIP: Solving Constraint Integer Programs, available at http://scip.zib.de/.
-
(2010)
SCIP: Solving Constraint Integer Programs
-
-
-
12
-
-
0003531165
-
Machine scheduling via alternative graphs
-
Università Roma Tre, Rome, Italy
-
Mascis, A. and Pacciarelli, D. (2000) 'Machine scheduling via alternative graphs', Technical report DIA-46-2000, Dipartimento di Informatica e Automazione, Università Roma Tre, Rome, Italy.
-
(2000)
Technical Report DIA-46-2000, Dipartimento di Informatica e Automazione
-
-
Mascis, A.1
Pacciarelli, D.2
-
13
-
-
0037121475
-
Job-shop scheduling with blocking and no-wait constraints
-
Mascis, A. and Pacciarelli, D. (2002) 'Job-shop scheduling with blocking and no-wait constraints', European Journal of Operational Research, Vol. 143, No. 3, pp.498-517.
-
(2002)
European Journal of Operational Research
, vol.143
, Issue.3
, pp. 498-517
-
-
Mascis, A.1
Pacciarelli, D.2
-
14
-
-
0002577337
-
Effective neighbourhood functions for the flexible job shop problem
-
Mastrolilli, M. and Gambardella, L.M. (2000) 'Effective neighbourhood functions for the flexible job shop problem', Journal of Scheduling, Vol. 3, No. 1, pp.3-20.
-
(2000)
Journal of Scheduling
, vol.3
, Issue.1
, pp. 3-20
-
-
Mastrolilli, M.1
Gambardella, L.M.2
-
15
-
-
0004168233
-
-
Prentice-Hall, Englewood Cliffs, New Jersey, USA
-
Muth, J.F. and Thompson, G.L. (1963) Industrial Scheduling, Prentice-Hall, Englewood Cliffs, New Jersey, USA.
-
(1963)
Industrial Scheduling
-
-
Muth, J.F.1
Thompson, G.L.2
-
16
-
-
72149115421
-
Modeling and scheduling a case of flexible flowshops: Total weighted tardiness minimization
-
Naderi, B., Zandieh, M. and Shirazi, M.A.H.A. (2009) 'Modeling and scheduling a case of flexible flowshops: total weighted tardiness minimization', Computers and Industrial Engineering, Vol. 57, No. 4, pp.1258-1267.
-
(2009)
Computers and Industrial Engineering
, vol.57
, Issue.4
, pp. 1258-1267
-
-
Naderi, B.1
Zandieh, M.2
Shirazi, M.A.H.A.3
-
17
-
-
40249118429
-
A genetic algorithm for the Flexible Job-shop Scheduling Problem
-
DOI 10.1016/j.cor.2007.02.014, PII S0305054807000524
-
Pezzella, F., Morganti, G. and Ciaschetti, G. (2008) 'A genetic algorithm for the flexible job shop scheduling problem', Computers & Operations Research, Vol. 35, No. 10, pp.3202-3212. (Pubitemid 351335142)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.10
, pp. 3202-3212
-
-
Pezzella, F.1
Morganti, G.2
Ciaschetti, G.3
-
18
-
-
33751165245
-
A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS
-
Reddy, B.S.P. and Rao, C.S.P. (2006) 'A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS', The International Journal of Advanced Manufacturing Technology, Vol. 31, No. 5, pp.602-613.
-
(2006)
The International Journal of Advanced Manufacturing Technology
, vol.31
, Issue.5
, pp. 602-613
-
-
Reddy, B.S.P.1
Rao, C.S.P.2
-
20
-
-
0026866144
-
Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
-
Sabuncuoǧlu, I. and Hommertzheim, D.L. (1992) 'Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system', International Journal of Production Research, Vol. 30, No. 5, pp.1059-1079.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.5
, pp. 1059-1079
-
-
Sabuncuoǧlu, I.1
Hommertzheim, D.L.2
-
21
-
-
52049091896
-
A memetic algorithm for the flexible flow line scheduling problem with processor blocking
-
Tavakkoli-Moghaddam, R., Safaei, N. and Sassani, F. (2009) 'A memetic algorithm for the flexible flow line scheduling problem with processor blocking', Computers & Operations Research, Vol. 36, No. 2, pp.402-414.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.2
, pp. 402-414
-
-
Tavakkoli-Moghaddam, R.1
Safaei, N.2
Sassani, F.3
-
22
-
-
0031124354
-
A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
-
Ulusoy, G., Sivirikaya-Şerifoǧlu, F. and Bilge, Ü. (1997) 'A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles', Computers & Operations Research, Vol. 24, No. 4, pp.335-351.
-
(1997)
Computers & Operations Research
, vol.24
, Issue.4
, pp. 335-351
-
-
Ulusoy, G.1
Sivirikaya-Şerifoǧlu, F.2
Bilge, Ü.3
|