메뉴 건너뛰기




Volumn 58, Issue 3, 2010, Pages 373-381

A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain

Author keywords

Genetic algorithm; Makespan; Scheduling; Supply; Transportation

Indexed keywords

DIFFERENT SPEED; MACHINE SCHEDULING; MAKESPAN; MIXED INTEGER PROGRAMMING; NOVEL GENETIC ALGORITHM; OPERATIONAL RESEARCH; OUTPUT PRODUCTS; PRODUCTION SPEED; STANDARD GENETIC ALGORITHM; SUPPLY; TRANSPORT CAPACITY; TWO STAGE; VEHICLE'S CAPACITY;

EID: 77949490486     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2009.06.012     Document Type: Article
Times cited : (95)

References (39)
  • 2
    • 33847288279 scopus 로고    scopus 로고
    • On-line supply chain scheduling problems with preemption
    • Averbakh I., and Xue Z. On-line supply chain scheduling problems with preemption. European Journal of Operational Research 181 1 (2007) 500-504
    • (2007) European Journal of Operational Research , vol.181 , Issue.1 , pp. 500-504
    • Averbakh, I.1    Xue, Z.2
  • 3
    • 1942500455 scopus 로고    scopus 로고
    • Integrating collaborative planning and supply chain optimization for the chemical process industry (I)-methodology
    • Berning G., Brandenburg M., Gürsoy K., Kussi J.S., Mehta V., and Tölle F. Integrating collaborative planning and supply chain optimization for the chemical process industry (I)-methodology. Computers and Chemical Engineering 28 6-7 (2004) 913-927
    • (2004) Computers and Chemical Engineering , vol.28 , Issue.6-7 , pp. 913-927
    • Berning, G.1    Brandenburg, M.2    Gürsoy, K.3    Kussi, J.S.4    Mehta, V.5    Tölle, F.6
  • 4
  • 5
    • 22144475484 scopus 로고    scopus 로고
    • An adaptive genetic algorithm with dominated genes for distributed scheduling problems
    • Chan F.T.S., Chung S.H., and Chan P.L.Y. An adaptive genetic algorithm with dominated genes for distributed scheduling problems. Expert Systems with Applications 29 2 (2005) 364-371
    • (2005) Expert Systems with Applications , vol.29 , Issue.2 , pp. 364-371
    • Chan, F.T.S.1    Chung, S.H.2    Chan, P.L.Y.3
  • 6
    • 2642510666 scopus 로고    scopus 로고
    • Machine scheduling with job delivery coordination
    • Chang Y., and Lee C. Machine scheduling with job delivery coordination. European Journal of Operational Research 158 2 (2004) 470-487
    • (2004) European Journal of Operational Research , vol.158 , Issue.2 , pp. 470-487
    • Chang, Y.1    Lee, C.2
  • 8
    • 41149141004 scopus 로고    scopus 로고
    • A dynamic driver management scheme for less-than-truckload carriers
    • Erera A., Karaci{dotless}k B., and Savelsbergh M. A dynamic driver management scheme for less-than-truckload carriers. Computers & Operations Research 35 11 (2008) 3397-3411
    • (2008) Computers & Operations Research , vol.35 , Issue.11 , pp. 3397-3411
    • Erera, A.1    Karacik, B.2    Savelsbergh, M.3
  • 11
    • 0038112232 scopus 로고    scopus 로고
    • Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry
    • Gnoni M.G., Iavagnilio R., Mossa G., Mummolo G., and DiLeva A. Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry. International Journal of Production Economics 85 2 (2003) 251-262
    • (2003) International Journal of Production Economics , vol.85 , Issue.2 , pp. 251-262
    • Gnoni, M.G.1    Iavagnilio, R.2    Mossa, G.3    Mummolo, G.4    DiLeva, A.5
  • 13
    • 84895093562 scopus 로고    scopus 로고
    • Effects of cohesiveness on intersexual dominance relationships and spatial structure among group-living virtual entities
    • Berlin
    • Hemelrijk, C. K. (1999). Effects of cohesiveness on intersexual dominance relationships and spatial structure among group-living virtual entities. In Proceeding of the European conference on artificial life V (pp. 524-534). Berlin.
    • (1999) Proceeding of the European conference on artificial life , vol.5 , pp. 524-534
    • Hemelrijk, C.K.1
  • 15
    • 2342644130 scopus 로고    scopus 로고
    • Improving the logistics of multi-compartment chemical tankers
    • Jetlund A.S., and Karimi I.A. Improving the logistics of multi-compartment chemical tankers. Computers and Chemical Engineering 28 8 (2004) 1267-1283
    • (2004) Computers and Chemical Engineering , vol.28 , Issue.8 , pp. 1267-1283
    • Jetlund, A.S.1    Karimi, I.A.2
  • 16
    • 34247532297 scopus 로고    scopus 로고
    • Modeling and optimizing transportation decisions in a manufacturing supply chain
    • Karabuk S. Modeling and optimizing transportation decisions in a manufacturing supply chain. Transportation Research Part E 43 4 (2007) 321-337
    • (2007) Transportation Research Part E , vol.43 , Issue.4 , pp. 321-337
    • Karabuk, S.1
  • 17
    • 33746964924 scopus 로고    scopus 로고
    • A genetic algorithm-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs
    • Ko H.J., and Evans G.W. A genetic algorithm-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs. Computers & Operations Research 34 2 (2007) 346-366
    • (2007) Computers & Operations Research , vol.34 , Issue.2 , pp. 346-366
    • Ko, H.J.1    Evans, G.W.2
  • 18
  • 19
    • 33748291359 scopus 로고    scopus 로고
    • Scheduling logistic activities to improve hospital supply systems
    • Lapierre S.D., and Ruiz A.B. Scheduling logistic activities to improve hospital supply systems. Computers & Operations Research 34 3 (2007) 624-641
    • (2007) Computers & Operations Research , vol.34 , Issue.3 , pp. 624-641
    • Lapierre, S.D.1    Ruiz, A.B.2
  • 20
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • Lee Y.H., Jeong C.J., and Moon C. Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers and Industrial Engineering 43 1-2 (2002) 351-374
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.J.2    Moon, C.3
  • 21
    • 33748430982 scopus 로고    scopus 로고
    • A variable neighborhood decomposition search method for supply chain management planning problems
    • Lejeune M.A. A variable neighborhood decomposition search method for supply chain management planning problems. European Journal of Operational Research 175 2 (2006) 959-976
    • (2006) European Journal of Operational Research , vol.175 , Issue.2 , pp. 959-976
    • Lejeune, M.A.1
  • 22
    • 33748265082 scopus 로고    scopus 로고
    • Scheduling in an assembly-type production chain with batch transfer
    • Lin B.M.T., Cheng T.C.E., and Chou A.S.C. Scheduling in an assembly-type production chain with batch transfer. Omega 35 2 (2007) 143-151
    • (2007) Omega , vol.35 , Issue.2 , pp. 143-151
    • Lin, B.M.T.1    Cheng, T.C.E.2    Chou, A.S.C.3
  • 24
    • 35248888931 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for single-machine scheduling with batch delivery and job release times
    • Mazdeh M.M., Sarhadi M., and Hindi K.S. A branch-and-bound algorithm for single-machine scheduling with batch delivery and job release times. Computers & Operations Research 35 4 (2008) 1099-1111
    • (2008) Computers & Operations Research , vol.35 , Issue.4 , pp. 1099-1111
    • Mazdeh, M.M.1    Sarhadi, M.2    Hindi, K.S.3
  • 25
    • 0036642688 scopus 로고    scopus 로고
    • Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
    • Moon C., Kim J., and Hur S. Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain. Computers and Industrial Engineering 43 1-2 (2002) 331-349
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 331-349
    • Moon, C.1    Kim, J.2    Hur, S.3
  • 26
    • 41449093762 scopus 로고    scopus 로고
    • Integrated process planning and scheduling in a supply chain
    • Moon C., Lee Y.H., Jeong C.S., and Yun Y. Integrated process planning and scheduling in a supply chain. Computers & Industrial Engineering 54 4 (2008) 1048-1061
    • (2008) Computers & Industrial Engineering , vol.54 , Issue.4 , pp. 1048-1061
    • Moon, C.1    Lee, Y.H.2    Jeong, C.S.3    Yun, Y.4
  • 27
    • 33750706574 scopus 로고    scopus 로고
    • Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete
    • Naso D., Surico M., Turchiano B., and Kaymak U. Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete. European Journal of Operational Research 177 (2007) 2069-2099
    • (2007) European Journal of Operational Research , vol.177 , pp. 2069-2099
    • Naso, D.1    Surico, M.2    Turchiano, B.3    Kaymak, U.4
  • 28
    • 34447503493 scopus 로고    scopus 로고
    • A distributed decision making system for integrated optimization of production scheduling and distribution for aluminum production line
    • Nishi T., Konishi M., and Ago M. A distributed decision making system for integrated optimization of production scheduling and distribution for aluminum production line. Computers and Chemical Engineering 31 10 (2007) 1205-1221
    • (2007) Computers and Chemical Engineering , vol.31 , Issue.10 , pp. 1205-1221
    • Nishi, T.1    Konishi, M.2    Ago, M.3
  • 29
    • 84957631145 scopus 로고    scopus 로고
    • Sexual signalling in an artificial population: When does the handicap principle work?
    • Springer-Verlag
    • Noble J. Sexual signalling in an artificial population: When does the handicap principle work?. Proceeding of the European Conference on Artificial Life V (1999), Springer-Verlag 644-653
    • (1999) Proceeding of the European Conference on Artificial Life V , pp. 644-653
    • Noble, J.1
  • 31
    • 34248155868 scopus 로고    scopus 로고
    • A probabilistic bi-level linear multi-objective programming problem to supply chain planning
    • Roghanian E., Sadjadi S.J., and Aryanezhad M.B. A probabilistic bi-level linear multi-objective programming problem to supply chain planning. Applied Mathematics and Computation 188 1 (2007) 786-800
    • (2007) Applied Mathematics and Computation , vol.188 , Issue.1 , pp. 786-800
    • Roghanian, E.1    Sadjadi, S.J.2    Aryanezhad, M.B.3
  • 33
    • 1942468138 scopus 로고    scopus 로고
    • A bilevel programming framework for enterprise-wide process networks under uncertainty'
    • Ryu J., Dua V., and Pistikopoulos E.N. A bilevel programming framework for enterprise-wide process networks under uncertainty'. Computers and Chemical Engineering 28 6-7 (2004) 1121-1129
    • (2004) Computers and Chemical Engineering , vol.28 , Issue.6-7 , pp. 1121-1129
    • Ryu, J.1    Dua, V.2    Pistikopoulos, E.N.3
  • 36
    • 33646094727 scopus 로고    scopus 로고
    • Batch scheduling in a two-level supply chain - A focus on the supplier
    • Selvarajah E., and Steiner G. Batch scheduling in a two-level supply chain - A focus on the supplier. European Journal of Operational Research 173 1 (2006) 226-240
    • (2006) European Journal of Operational Research , vol.173 , Issue.1 , pp. 226-240
    • Selvarajah, E.1    Steiner, G.2
  • 37


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.