메뉴 건너뛰기




Volumn 56, Issue , 2015, Pages 36-46

Automated assembly discrepancy feedback using 3D imaging and forward kinematics

Author keywords

3D imaging; Deviation analysis; Fabrication error; Laser scanning; Pipe spools; Pipelines; Realignment feedback; Refit and plumbness; Robotic forward kinematics

Indexed keywords

IMAGING SYSTEMS; PIPELINES; PIPING SYSTEMS; ROBOTICS;

EID: 84929075462     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2015.04.005     Document Type: Article
Times cited : (33)

References (61)
  • 1
    • 0031145409 scopus 로고    scopus 로고
    • Simulation of structural steel erection to assess innovations
    • E. Sarah Slaughter, and M. Eraso Simulation of structural steel erection to assess innovations IEEE Trans. Eng. Manag. 44 1997 196 207
    • (1997) IEEE Trans. Eng. Manag. , vol.44 , pp. 196-207
    • Sarah Slaughter, E.1    Eraso, M.2
  • 3
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • P. Love Influence of project type and procurement method on rework costs in building construction projects J. Constr. Eng. Manag. 128 2002 18 29
    • (2002) J. Constr. Eng. Manag. , vol.128 , pp. 18-29
    • Love, P.1
  • 5
    • 29144432257 scopus 로고    scopus 로고
    • A formalism for utilization of sensor systems and integrated project models for active construction quality control
    • B. Akinci, F. Boukamp, C. Gordon, D. Huber, C. Lyons, and K. Park A formalism for utilization of sensor systems and integrated project models for active construction quality control Autom. Constr. 15 2006 124 138
    • (2006) Autom. Constr. , vol.15 , pp. 124-138
    • Akinci, B.1    Boukamp, F.2    Gordon, C.3    Huber, D.4    Lyons, C.5    Park, K.6
  • 6
    • 0031206984 scopus 로고    scopus 로고
    • Total quality management in the construction process
    • D. Arditi, and H.M. Gunaydin Total quality management in the construction process Int. J. Proj. Manag. 15 1997 235 243
    • (1997) Int. J. Proj. Manag. , vol.15 , pp. 235-243
    • Arditi, D.1    Gunaydin, H.M.2
  • 9
    • 60449091309 scopus 로고    scopus 로고
    • Measuring the impact of rework on construction cost performance
    • B. Hwang, S.R. Thomas, C.T. Haas, and C.H. Caldas Measuring the impact of rework on construction cost performance J. Constr. Eng. Manag. 135 2009 187 198
    • (2009) J. Constr. Eng. Manag. , vol.135 , pp. 187-198
    • Hwang, B.1    Thomas, S.R.2    Haas, C.T.3    Caldas, C.H.4
  • 10
    • 84904670247 scopus 로고    scopus 로고
    • Automated registration of 3D point clouds with 3D CAD models for remote assessment of staged fabrication
    • M. Nahangi, M. Safa, A. Shahi, and C. Haas Automated registration of 3D point clouds with 3D CAD models for remote assessment of staged fabrication ASCE Construction Research Congress 2014 1004 1013
    • (2014) ASCE Construction Research Congress , pp. 1004-1013
    • Nahangi, M.1    Safa, M.2    Shahi, A.3    Haas, C.4
  • 11
    • 33750978713 scopus 로고    scopus 로고
    • A new approach for health monitoring of structures: Terrestrial laser scanning
    • H.S. Park, H.M. Lee, H. Adeli, and I. Lee A new approach for health monitoring of structures: terrestrial laser scanning Comput. Aided Civ. Infrastruct. Eng. 22 2007 19 30
    • (2007) Comput. Aided Civ. Infrastruct. Eng. , vol.22 , pp. 19-30
    • Park, H.S.1    Lee, H.M.2    Adeli, H.3    Lee, I.4
  • 12
    • 84888010814 scopus 로고    scopus 로고
    • A videogrammetric as-built data collection method for digital fabrication of sheet metal roof panels
    • H. Fathi, and I. Brilakis A videogrammetric as-built data collection method for digital fabrication of sheet metal roof panels Adv. Eng. Inform. 27 2013 466 476
    • (2013) Adv. Eng. Inform. , vol.27 , pp. 466-476
    • Fathi, H.1    Brilakis, I.2
  • 13
    • 77956619234 scopus 로고    scopus 로고
    • Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques
    • P. Tang, D. Huber, B. Akinci, R. Lipman, and A. Lytle Automatic reconstruction of as-built building information models from laser-scanned point clouds: a review of related techniques Autom. Constr. 19 2010 829 843
    • (2010) Autom. Constr. , vol.19 , pp. 829-843
    • Tang, P.1    Huber, D.2    Akinci, B.3    Lipman, R.4    Lytle, A.5
  • 14
    • 84865435484 scopus 로고    scopus 로고
    • Evaluation of accuracy of as-built 3D modeling from photos taken by handheld digital cameras
    • A. Bhatla, S.Y. Choe, O. Fierro, and F. Leite Evaluation of accuracy of as-built 3D modeling from photos taken by handheld digital cameras Autom. Constr. 28 2012 116 127
    • (2012) Autom. Constr. , vol.28 , pp. 116-127
    • Bhatla, A.1    Choe, S.Y.2    Fierro, O.3    Leite, F.4
  • 15
    • 84857370632 scopus 로고    scopus 로고
    • Automated progress tracking using 4D schedule and 3D sensing technologies
    • Y. Turkan, F. Bosche, C.T. Haas, and R. Haas Automated progress tracking using 4D schedule and 3D sensing technologies Autom. Constr. 22 2012 414 421
    • (2012) Autom. Constr. , vol.22 , pp. 414-421
    • Turkan, Y.1    Bosche, F.2    Haas, C.T.3    Haas, R.4
  • 16
    • 70350060197 scopus 로고    scopus 로고
    • Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
    • M. Golparvar-Fard, F. Pena-Mora, C.A. Arboleda, and S. Lee Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs J. Comput. Civ. Eng. 23 2009 391 404
    • (2009) J. Comput. Civ. Eng. , vol.23 , pp. 391-404
    • Golparvar-Fard, M.1    Pena-Mora, F.2    Arboleda, C.A.3    Lee, S.4
  • 17
    • 38649103110 scopus 로고    scopus 로고
    • Automated retrieval of 3D CAD model objects in construction range images
    • F. Bosche, and C.T. Haas Automated retrieval of 3D CAD model objects in construction range images Autom. Constr. 17 2008 499 512
    • (2008) Autom. Constr. , vol.17 , pp. 499-512
    • Bosche, F.1    Haas, C.T.2
  • 19
    • 0042273486 scopus 로고    scopus 로고
    • Time-lapse digital photography applied to project management
    • J. Abeid, and D. Arditi Time-lapse digital photography applied to project management J. Constr. Eng. Manag. 128 2002 530 535
    • (2002) J. Constr. Eng. Manag. , vol.128 , pp. 530-535
    • Abeid, J.1    Arditi, D.2
  • 20
    • 84865269494 scopus 로고    scopus 로고
    • Using digital photogrammetry for pipe-works progress tracking
    • M. Ahmed, C.T. Haas, and R. Haas Using digital photogrammetry for pipe-works progress tracking Can. J. Civ. Eng. 39 2012 1062 1071
    • (2012) Can. J. Civ. Eng. , vol.39 , pp. 1062-1071
    • Ahmed, M.1    Haas, C.T.2    Haas, R.3
  • 21
    • 84945117607 scopus 로고    scopus 로고
    • Generating absolute-scale point cloud data of built infrastructure scenes using a monocular camera setting
    • 10.1061/(ASCE)CP.1943-5487.0000414
    • A. Rashidi, I. Brilakis, and P. Vela Generating absolute-scale point cloud data of built infrastructure scenes using a monocular camera setting J. Comput. Civ. Eng. 2014 10.1061/(ASCE)CP.1943-5487.0000414
    • (2014) J. Comput. Civ. Eng.
    • Rashidi, A.1    Brilakis, I.2    Vela, P.3
  • 22
    • 80052835631 scopus 로고    scopus 로고
    • Progressive 3D reconstruction of infrastructure with videogrammetry
    • I. Brilakis, H. Fathi, and A. Rashidi Progressive 3D reconstruction of infrastructure with videogrammetry Autom. Constr. 20 2011 884 895
    • (2011) Autom. Constr. , vol.20 , pp. 884-895
    • Brilakis, I.1    Fathi, H.2    Rashidi, A.3
  • 23
    • 84876668142 scopus 로고    scopus 로고
    • Optimized selection of key frames for monocular videogrammetric surveying of civil infrastructure
    • A. Rashidi, F. Dai, I. Brilakis, and P. Vela Optimized selection of key frames for monocular videogrammetric surveying of civil infrastructure Adv. Eng. Inform. 27 2013 270 282
    • (2013) Adv. Eng. Inform. , vol.27 , pp. 270-282
    • Rashidi, A.1    Dai, F.2    Brilakis, I.3    Vela, P.4
  • 24
    • 42949096914 scopus 로고    scopus 로고
    • 3D range imaging camera sensing for active safety in construction
    • J. Teizer 3D range imaging camera sensing for active safety in construction Electron. J. Inf. Technol. Constr. 13 2008 103 117
    • (2008) Electron. J. Inf. Technol. Constr. , vol.13 , pp. 103-117
    • Teizer, J.1
  • 25
    • 80053650754 scopus 로고    scopus 로고
    • Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques
    • M. Golparvar-Fard, J. Bohn, J. Teizer, S. Savarese, and F. Peña-Mora Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques Autom. Constr. 20 2011 1143 1155
    • (2011) Autom. Constr. , vol.20 , pp. 1143-1155
    • Golparvar-Fard, M.1    Bohn, J.2    Teizer, J.3    Savarese, S.4    Peña-Mora, F.5
  • 26
    • 84872744697 scopus 로고    scopus 로고
    • Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure
    • F. Dai, A. Rashidi, I. Brilakis, and P. Vela Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure J. Constr. Eng. Manag. 139 2013 69 79
    • (2013) J. Constr. Eng. Manag. , vol.139 , pp. 69-79
    • Dai, F.1    Rashidi, A.2    Brilakis, I.3    Vela, P.4
  • 27
    • 84871764113 scopus 로고    scopus 로고
    • Automated construction progress measurement using a 4D building information model and 3D data
    • C. Kim, C. Kim, and H. Son Automated construction progress measurement using a 4D building information model and 3D data Autom. Constr. 31 2013 75 82
    • (2013) Autom. Constr. , vol.31 , pp. 75-82
    • Kim, C.1    Kim, C.2    Son, H.3
  • 28
    • 84924079175 scopus 로고    scopus 로고
    • Automated 3D compliance checking in pipe spool fabrication
    • M. Nahangi, and C.T. Haas Automated 3D compliance checking in pipe spool fabrication Adv. Eng. Inform. 28 2014 360 369
    • (2014) Adv. Eng. Inform. , vol.28 , pp. 360-369
    • Nahangi, M.1    Haas, C.T.2
  • 29
    • 75649151573 scopus 로고    scopus 로고
    • Machine vision-based concrete surface quality assessment
    • Z. Zhu, and I. Brilakis Machine vision-based concrete surface quality assessment J. Constr. Eng. Manag. 136 2010 210 218
    • (2010) J. Constr. Eng. Manag. , vol.136 , pp. 210-218
    • Zhu, Z.1    Brilakis, I.2
  • 30
    • 84900462381 scopus 로고    scopus 로고
    • Automating surface flatness control using terrestrial laser scanning and building information models
    • F. Bosché, and E. Guenet Automating surface flatness control using terrestrial laser scanning and building information models Autom. Constr. 44 2014 212 226
    • (2014) Autom. Constr. , vol.44 , pp. 212-226
    • Bosché, F.1    Guenet, E.2
  • 31
    • 79956187803 scopus 로고    scopus 로고
    • Multi-image stitching and scene reconstruction for evaluating defect evolution in structures
    • M.R. Jahanshahi, S.F. Masri, and G.S. Sukhatme Multi-image stitching and scene reconstruction for evaluating defect evolution in structures Struct. Health Monit. 10 2011 643 657
    • (2011) Struct. Health Monit. , vol.10 , pp. 643-657
    • Jahanshahi, M.R.1    Masri, S.F.2    Sukhatme, G.S.3
  • 32
    • 84859591748 scopus 로고    scopus 로고
    • Image-based safety assessment: Automated spatial safety risk identification of earthmoving and surface mining activities
    • S. Chi, and C. Caldas Image-based safety assessment: automated spatial safety risk identification of earthmoving and surface mining activities J. Constr. Eng. Manag. 138 2012 341 351
    • (2012) J. Constr. Eng. Manag. , vol.138 , pp. 341-351
    • Chi, S.1    Caldas, C.2
  • 33
    • 84898995395 scopus 로고    scopus 로고
    • Automatic detection of cylindrical objects in built facilities
    • 04014009
    • M. Ahmed, C. Haas, and R. Haas Automatic detection of cylindrical objects in built facilities J. Comput. Civ. Eng. 04014009 2014
    • (2014) J. Comput. Civ. Eng.
    • Ahmed, M.1    Haas, C.2    Haas, R.3
  • 34
    • 81355161549 scopus 로고    scopus 로고
    • Imaged-based verification of as-built documentation of operational buildings
    • L. Klein, N. Li, and B. Becerik-Gerber Imaged-based verification of as-built documentation of operational buildings Autom. Constr. 21 2012 161 171
    • (2012) Autom. Constr. , vol.21 , pp. 161-171
    • Klein, L.1    Li, N.2    Becerik-Gerber, B.3
  • 35
    • 37249050826 scopus 로고    scopus 로고
    • Shape-based retrieval of construction site photographs
    • I.K. Brilakis, and L. Soibelman Shape-based retrieval of construction site photographs J. Comput. Civ. Eng. 22 2008 14 20
    • (2008) J. Comput. Civ. Eng. , vol.22 , pp. 14-20
    • Brilakis, I.K.1    Soibelman, L.2
  • 36
    • 33847066338 scopus 로고    scopus 로고
    • A review of recent range image registration methods with accuracy evaluation
    • J. Salvi, C. Matabosch, D. Fofi, and J. Forest A review of recent range image registration methods with accuracy evaluation Image Vis. Comput. 25 2007 578 596
    • (2007) Image Vis. Comput. , vol.25 , pp. 578-596
    • Salvi, J.1    Matabosch, C.2    Fofi, D.3    Forest, J.4
  • 37
    • 84884500230 scopus 로고    scopus 로고
    • Fully automated registration of 3D data to a 3D CAD model for project progress monitoring
    • C. Kim, H. Son, and C. Kim Fully automated registration of 3D data to a 3D CAD model for project progress monitoring Autom. Constr. 35 2013 587 594
    • (2013) Autom. Constr. , vol.35 , pp. 587-594
    • Kim, C.1    Son, H.2    Kim, C.3
  • 38
    • 83555160969 scopus 로고    scopus 로고
    • Plane-based registration of construction laser scans with 3D/4D building models
    • F. Bosché Plane-based registration of construction laser scans with 3D/4D building models Adv. Eng. Inform. 26 2012 90 102
    • (2012) Adv. Eng. Inform. , vol.26 , pp. 90-102
    • Bosché, F.1
  • 39
    • 84902439119 scopus 로고    scopus 로고
    • Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system
    • F. Bosché, A. Guillemet, Y. Turkan, C.T. Haas, and R. Haas Tracking the built status of MEP works: assessing the value of a Scan-vs-BIM system J. Comput. Civ. Eng. 28 2014
    • (2014) J. Comput. Civ. Eng. , vol.28
    • Bosché, F.1    Guillemet, A.2    Turkan, Y.3    Haas, C.T.4    Haas, R.5
  • 40
    • 84887356899 scopus 로고    scopus 로고
    • Fully automated as-built 3D pipeline segmentation based on curvature computation from laser-scanned data, Computing in Civil Engineering
    • H. Son, C. Kim, and C. Kim Fully automated as-built 3D pipeline segmentation based on curvature computation from laser-scanned data, Computing in Civil Engineering Proceedings of the 2013 ASCE International Workshop on Computing in Civil Engineering 2013 765 772
    • (2013) Proceedings of the 2013 ASCE International Workshop on Computing in Civil Engineering , pp. 765-772
    • Son, H.1    Kim, C.2    Kim, C.3
  • 42
    • 84884499636 scopus 로고    scopus 로고
    • Skeleton-based 3D reconstruction of as-built pipelines from laser-scan data
    • J. Lee, H. Son, C. Kim, and C. Kim Skeleton-based 3D reconstruction of as-built pipelines from laser-scan data Autom. Constr. 35 2013 199 207
    • (2013) Autom. Constr. , vol.35 , pp. 199-207
    • Lee, J.1    Son, H.2    Kim, C.3    Kim, C.4
  • 43
    • 84894209434 scopus 로고    scopus 로고
    • Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry
    • X. Wang, M. Truijens, L. Hou, Y. Wang, and Y. Zhou Integrating Augmented Reality with Building Information Modeling: onsite construction process controlling for liquefied natural gas industry Autom. Constr. 40 2014 96 105
    • (2014) Autom. Constr. , vol.40 , pp. 96-105
    • Wang, X.1    Truijens, M.2    Hou, L.3    Wang, Y.4    Zhou, Y.5
  • 44
    • 84926221924 scopus 로고    scopus 로고
    • The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components
    • F. Bosché, M. Ahmed, Y. Turkan, C.T. Haas, and R. Haas The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components Autom. Constr 49 2015 201 213
    • (2015) Autom. Constr , vol.49 , pp. 201-213
    • Bosché, F.1    Ahmed, M.2    Turkan, Y.3    Haas, C.T.4    Haas, R.5
  • 45
    • 84884502984 scopus 로고    scopus 로고
    • Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data
    • E.B. Anil, P. Tang, B. Akinci, and D. Huber Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data Autom. Constr. 35 2013 507 516
    • (2013) Autom. Constr. , vol.35 , pp. 507-516
    • Anil, E.B.1    Tang, P.2    Akinci, B.3    Huber, D.4
  • 46
    • 33847742919 scopus 로고    scopus 로고
    • Construction robotics
    • T. Bock Construction robotics Auton. Robot. 22 2007 201 209
    • (2007) Auton. Robot. , vol.22 , pp. 201-209
    • Bock, T.1
  • 48
    • 0025429338 scopus 로고
    • Automation and robotics for road construction and maintenance
    • M. Skibniewski, and C. Hendrickson Automation and robotics for road construction and maintenance J. Transp. Eng. 116 1990 261 271
    • (1990) J. Transp. Eng. , vol.116 , pp. 261-271
    • Skibniewski, M.1    Hendrickson, C.2
  • 50
    • 0037930552 scopus 로고    scopus 로고
    • Rapid geometric modeling for unstructured construction workspaces
    • Y.K. Cho, and C.T. Haas Rapid geometric modeling for unstructured construction workspaces Comput. Aided Civ. Infrastruct. Eng. 18 2003 242 253
    • (2003) Comput. Aided Civ. Infrastruct. Eng. , vol.18 , pp. 242-253
    • Cho, Y.K.1    Haas, C.T.2
  • 51
    • 0036778649 scopus 로고    scopus 로고
    • A framework for rapid local area modeling for construction automation
    • Y.K. Cho, C.T. Haas, K. Liapi, and S.V. Sreenivasan A framework for rapid local area modeling for construction automation Autom. Constr. 11 2002 629 641
    • (2002) Autom. Constr. , vol.11 , pp. 629-641
    • Cho, Y.K.1    Haas, C.T.2    Liapi, K.3    Sreenivasan, S.V.4
  • 55
    • 85103590248 scopus 로고
    • A kinematic notation for lower-pair mechanisms based on matrices
    • J. Denavit, and R.S. Hartenberg A kinematic notation for lower-pair mechanisms based on matrices J. Appl. Mech. 1955 215 221
    • (1955) J. Appl. Mech. , pp. 215-221
    • Denavit, J.1    Hartenberg, R.S.2
  • 56
    • 0043237770 scopus 로고    scopus 로고
    • Image registration methods: A survey
    • B. Zitová, and J. Flusser Image registration methods: a survey Image Vis. Comput. 21 2003 977 1000
    • (2003) Image Vis. Comput. , vol.21 , pp. 977-1000
    • Zitová, B.1    Flusser, J.2
  • 60
    • 84929077487 scopus 로고    scopus 로고
    • (April 8, 2014)
    • FARO FARO Laser Scanner LS 840/880 http://www2.faro.com/FaroIP/Files/File/Techsheets%20Download/IN-LS880.pdf 2014 (April 8, 2014)
    • (2014) FARO Laser Scanner LS 840/880
  • 61
    • 0347411213 scopus 로고    scopus 로고
    • Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds
    • S. Kwon, F. Bosche, C. Kim, C.T. Haas, and K.A. Liapi Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds Autom. Constr. 13 2004 67 81
    • (2004) Autom. Constr. , vol.13 , pp. 67-81
    • Kwon, S.1    Bosche, F.2    Kim, C.3    Haas, C.T.4    Liapi, K.A.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.