메뉴 건너뛰기




Volumn 59, Issue 9-12, 2012, Pages 1191-1210

Balancing of mixed-Model two-Sided assembly lines with multiple u-Shaped layout

Author keywords

Balancing; Genetic algorithms; Mixed Model production; Multiple U Shaped layout; Optimization; Two Sided assembly line

Indexed keywords

ASSEMBLY LINE; ASSEMBLY SYSTEMS; COMBINATORIAL OPTIMIZATION PROBLEMS; CYCLE TIME; MIXED INTEGER PROGRAMMING; MIXED-MODEL PRODUCTION; NP-HARD CLASS; TWO-SIDED ASSEMBLY LINE BALANCING; TWO-SIDED ASSEMBLY LINES; U-SHAPED; U-SHAPED ASSEMBLY LINES;

EID: 84866943225     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-011-3545-6     Document Type: Article
Times cited : (60)

References (64)
  • 2
    • 0022910386 scopus 로고
    • Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
    • Henig MI (1986) Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems. Comput Oper Res 13(4):443-449
    • (1986) Comput Oper Res , vol.13 , Issue.4 , pp. 443-449
    • Henig, M.I.1
  • 3
    • 0023428683 scopus 로고
    • A two-process implicit enumeration algorithm for the simple assembly line balancing problem
    • Saltzman MJ, Baybars I (1987) A two-process implicit enumeration algorithm for the simple assembly line balancing problem. Eur J Oper Res 32(1):118-129
    • (1987) Eur J Oper Res , vol.32 , Issue.1 , pp. 118-129
    • Saltzman, M.J.1    Baybars, I.2
  • 4
    • 0026851799 scopus 로고
    • Branch-and-bound algorithms for the multi-product assembly line balancing problem
    • Berger I, Bourjolly JM, Laporte G (1992) Branch-and-bound algorithms for the multi-product assembly line balancing problem. Eur J Oper Res 58(2):215-222
    • (1992) Eur J Oper Res , vol.58 , Issue.2 , pp. 215-222
    • Berger, I.1    Bourjolly, J.M.2    Laporte, G.3
  • 5
    • 0032635871 scopus 로고    scopus 로고
    • A competitive branch-and-bound algorithm for the simple assembly line balancing problem
    • Sprechter A (1999) A competitive branch-and-bound algorithm for the simple assembly line balancing problem. Int J Prod Res 37 (8):1787-1816
    • (1999) Int J Prod Res , vol.37 , Issue.8 , pp. 1787-1816
    • Sprechter, A.1
  • 6
    • 25144486368 scopus 로고    scopus 로고
    • An linear programming based lower bound for the simple assembly line balancing problem
    • Peeters M, Degraeve Z (2006) An linear programming based lower bound for the simple assembly line balancing problem. Eur J Oper Res 168(3):716-731
    • (2006) Eur J Oper Res , vol.168 , Issue.3 , pp. 716-731
    • Peeters, M.1    Degraeve, Z.2
  • 7
    • 33845260328 scopus 로고    scopus 로고
    • A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs
    • Bukchin Y, Rabinowitch I (2006) A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs. Eur J Oper Res 174(1):492-508
    • (2006) Eur J Oper Res , vol.174 , Issue.1 , pp. 492-508
    • Bukchin, Y.1    Rabinowitch, I.2
  • 8
    • 33750001537 scopus 로고    scopus 로고
    • A Petri net approach for simple assembly line balancing problems
    • Kilincci O, Bayhan GM (2006) A Petri net approach for simple assembly line balancing problems. Int J Adv Manuf Technol 30 (11-12):1165-1173
    • (2006) Int J Adv Manuf Technol , vol.30 , Issue.11-12 , pp. 1165-1173
    • Kilincci, O.1    Bayhan, G.M.2
  • 9
    • 42449109880 scopus 로고    scopus 로고
    • A P-invariant-based algorithm for simple assembly line balancing problem of type-1
    • Kilincci O, Bayhan GM (2008) A P-invariant-based algorithm for simple assembly line balancing problem of type-1. Int J Adv Manuf Technol 37(3-4):400-409
    • (2008) Int J Adv Manuf Technol , vol.37 , Issue.3-4 , pp. 400-409
    • Kilincci, O.1    Bayhan, G.M.2
  • 10
    • 34249995941 scopus 로고    scopus 로고
    • A classification of assembly line balancing problems
    • Boysen N, Fliedner M, Scholl A (2007) A classification of assembly line balancing problems. Eur J Oper Res 183(2):674-693
    • (2007) Eur J Oper Res , vol.183 , Issue.2 , pp. 674-693
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 11
    • 38949137145 scopus 로고    scopus 로고
    • Branch-and-bound algorithms for simple assembly line balancing problem
    • Liu SB, Ng KM, Ong HL (2008) Branch-and-bound algorithms for simple assembly line balancing problem. Int J Adv Manuf Technol 36(1-2):169-177
    • (2008) Int J Adv Manuf Technol , vol.36 , Issue.1-2 , pp. 169-177
    • Liu, S.B.1    Ng, K.M.2    Ong, H.L.3
  • 12
    • 55149094562 scopus 로고    scopus 로고
    • A dynamic programming based heuristic for the assembly line balancing problem
    • Bautista J, Pereira J (2009) A dynamic programming based heuristic for the assembly line balancing problem. Eur J Oper Res 194(3):787-794
    • (2009) Eur J Oper Res , vol.194 , Issue.3 , pp. 787-794
    • Bautista, J.1    Pereira, J.2
  • 13
    • 67651163455 scopus 로고    scopus 로고
    • Ant colony optimization for the single model U-type assembly line balancing problem
    • Sabuncuoglu I, Erel E, Alp A (2009) Ant colony optimization for the single model U-type assembly line balancing problem. Int J Prod Econ 120(2):287-300
    • (2009) Int J Prod Econ , vol.120 , Issue.2 , pp. 287-300
    • Sabuncuoglu, I.1    Erel, E.2    Alp, A.3
  • 14
    • 0025603598 scopus 로고
    • An efficient heuristic for solving stochastic assembly line balancing problems
    • Shin D (1990) An efficient heuristic for solving stochastic assembly line balancing problems. Comput Ind Eng 18(3):285-295
    • (1990) Comput Ind Eng , vol.18 , Issue.3 , pp. 285-295
    • Shin, D.1
  • 15
    • 11144304066 scopus 로고    scopus 로고
    • A bidirectional heuristic for stochastic assembly line balancing type II problem
    • Liu SB, Ong HL, Huang HC (2005) A bidirectional heuristic for stochastic assembly line balancing type II problem. Int J Adv Manuf Technol 25(1-2):71-77
    • (2005) Int J Adv Manuf Technol , vol.25 , Issue.1-2 , pp. 71-77
    • Liu, S.B.1    Ong, H.L.2    Huang, H.C.3
  • 16
    • 60549111603 scopus 로고    scopus 로고
    • An efficient approach for type II robotic assembly line balancing problems
    • Gao J, Sun L, Wang L, Mitsuo Gen M (2009) An efficient approach for type II robotic assembly line balancing problems. Comput Ind Eng 56(3):1065-1080
    • (2009) Comput Ind Eng , vol.56 , Issue.3 , pp. 1065-1080
    • Gao, J.1    Sun, L.2    Wang, L.3    Mitsuo Gen, M.4
  • 17
    • 0013064892 scopus 로고    scopus 로고
    • A methodology for solving single-model, stochastic assembly line balancing problem
    • Sarin SC, Erel E, Dar-El EM (1999) A methodology for solving single-model, stochastic assembly line balancing problem. Omega 27(5):525-535
    • (1999) Omega , vol.27 , Issue.5 , pp. 525-535
    • Sarin, S.C.1    Erel, E.2    Dar-El, E.M.3
  • 18
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line rebalancing problem
    • Gamberini R, Grassi A, Rimini B (2006) A new multi-objective heuristic algorithm for solving the stochastic assembly line rebalancing problem. Int J Prod Econ 102(2):226-243
    • (2006) Int J Prod Econ , vol.102 , Issue.2 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 19
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker C, Scholl A (2006) A survey on problems and methods in generalized assembly line balancing. Eur J Oper Res 168(3):694-715
    • (2006) Eur J Oper Res , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 20
    • 33751190782 scopus 로고    scopus 로고
    • A recursive operator allocation approach for assembly line-balancing optimization problem with the consideration of operator efficiency
    • Song BL, Wong WK, Fan JT, Chan SF (2006) A recursive operator allocation approach for assembly line-balancing optimization problem with the consideration of operator efficiency. Comput Ind Eng 51(4):585-608
    • (2006) Comput Ind Eng , vol.51 , Issue.4 , pp. 585-608
    • Song, B.L.1    Wong, W.K.2    Fan, J.T.3    Chan, S.F.4
  • 21
    • 0024641634 scopus 로고
    • A comprehensive literature-review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh S, Gagnon RJ (1989) A comprehensive literature-review and analysis of the design, balancing and scheduling of assembly systems. Int J Prod Res 27(4):637-670
    • (1989) Int J Prod Res , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 22
    • 33644664806 scopus 로고    scopus 로고
    • A hybrid genetic algorithm approach to mixed-model assembly line balancing
    • Noorul Haq A, Jayaprakash J, Rengarajan K (2006) A hybrid genetic algorithm approach to mixed-model assembly line balancing. Int J Adv Manuf Technol 28(3-4):337-341
    • (2006) Int J Adv Manuf Technol , vol.28 , Issue.3-4 , pp. 337-341
    • Noorul Haq, A.1    Jayaprakash, J.2    Rengarajan, K.3
  • 23
    • 59349112769 scopus 로고    scopus 로고
    • 2-ANTBAL: An ant colony optimization algorithm for balancing two-sided assembly lines
    • Simaria AS, Vilarinho PM (2009) 2-ANTBAL: An ant colony optimization algorithm for balancing two-sided assembly lines. Comput Ind Eng 56(2):489-506
    • (2009) Comput Ind Eng , vol.56 , Issue.2 , pp. 489-506
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 24
    • 67349117327 scopus 로고    scopus 로고
    • Balancing of mixed-model two-sided assembly lines
    • Özcan U, Toklu B (2009) Balancing of mixed-model two-sided assembly lines. Comput Ind Eng 57(1):217-227
    • (2009) Comput Ind Eng , vol.57 , Issue.1 , pp. 217-227
    • Özcan, U.1    Toklu, B.2
  • 25
    • 0027675494 scopus 로고
    • Balancing two-sided assembly lines: A case study
    • Bartholdi JJ (1993) Balancing two-sided assembly lines: A case study. Int J Prod Res 31(10):2447-2461
    • (1993) Int J Prod Res , vol.31 , Issue.10 , pp. 2447-2461
    • Bartholdi, J.J.1
  • 26
    • 56249109072 scopus 로고    scopus 로고
    • Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing
    • Kara Y, Paksoy T, Chang CT (2009) Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing. Eur J Oper Res 195(2):335-347
    • (2009) Eur J Oper Res , vol.195 , Issue.2 , pp. 335-347
    • Kara, Y.1    Paksoy, T.2    Chang, C.T.3
  • 27
    • 70449632610 scopus 로고    scopus 로고
    • A multi-decision genetic approach for workload balancing of mixed-model U-shaped assembly line systems
    • Hwang R, Katayama H (2009) A multi-decision genetic approach for workload balancing of mixed-model U-shaped assembly line systems. Int J Prod Res 47(14):3797-3822
    • (2009) Int J Prod Res , vol.47 , Issue.14 , pp. 3797-3822
    • Hwang, R.1    Katayama, H.2
  • 28
    • 0031238178 scopus 로고    scopus 로고
    • A parametric procedure for multicriterion sequence scheduling for just-in-time mixed-model assembly lines
    • Aigbedo H, Monden Y (1997) A parametric procedure for multicriterion sequence scheduling for just-in-time mixed-model assembly lines. Int J Prod Res 35(9):2543-2564
    • (1997) Int J Prod Res , vol.35 , Issue.9 , pp. 2543-2564
    • Aigbedo, H.1    Monden, Y.2
  • 29
    • 0002134614 scopus 로고    scopus 로고
    • Balancing U-lines in a multiple U-line facility
    • Miltenburg J (1998) Balancing U-lines in a multiple U-line facility. Eur J Oper Res 109(1):1-23
    • (1998) Eur J Oper Res , vol.109 , Issue.1 , pp. 1-23
    • Miltenburg, J.1
  • 30
    • 37349007853 scopus 로고    scopus 로고
    • Assembly line balancing: Which model to use when?
    • Boysen N, Fliedner M, Scholl A (2008) Assembly line balancing: Which model to use when? Int J Prod Econ 111(2):509-528
    • (2008) Int J Prod Econ , vol.111 , Issue.2 , pp. 509-528
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 32
    • 0032089680 scopus 로고    scopus 로고
    • Assembly line balancing when scarp impacts the bottom line
    • Grabau MR, Maurer RA (1998) Assembly line balancing when scarp impacts the bottom line. Prod Invent Manag J 39:16-21
    • (1998) Prod Invent Manag J , vol.39 , pp. 16-21
    • Grabau, M.R.1    Maurer, R.A.2
  • 33
    • 85135755631 scopus 로고
    • The assembly line balancing problem
    • Salveson ME (1955) The assembly line balancing problem. J Ind Eng 6(3):18-25
    • (1955) J Ind Eng , vol.6 , Issue.3 , pp. 18-25
    • Salveson, M.E.1
  • 34
    • 0032188659 scopus 로고    scopus 로고
    • Using simulated annealing to solve a multi-objective assembly line balancing problem with parallel workstations
    • McMullen PR, Frazier GV (1998) Using simulated annealing to solve a multi-objective assembly line balancing problem with parallel workstations. Int J Prod Res 36(10):2717-2741
    • (1998) Int J Prod Res , vol.36 , Issue.10 , pp. 2717-2741
    • McMullen, P.R.1    Frazier, G.V.2
  • 35
    • 0032635871 scopus 로고    scopus 로고
    • A competitive branch-and-bound algorithm for the simple assembly line balancing problem
    • Sprecher A (1999) A competitive branch-and-bound algorithm for the simple assembly line balancing problem. Int J Prod Res 37 (8):1787-1816
    • (1999) Int J Prod Res , vol.37 , Issue.8 , pp. 1787-1816
    • Sprecher, A.1
  • 36
    • 64549088104 scopus 로고    scopus 로고
    • An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
    • Capacho L, Pastor R, Dolgui A, Guschinskaya O (2009) An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem. Journal of Heuristics 15(2):109-132
    • (2009) Journal of Heuristics , vol.15 , Issue.2 , pp. 109-132
    • Capacho, L.1    Pastor, R.2    Dolgui, A.3    Guschinskaya, O.4
  • 37
    • 77951095039 scopus 로고    scopus 로고
    • Optimizing and simulating the assembly line balancing problem in a motorcycle manufacturing company: A case study
    • doi:10.1080/ 00207540902926522
    • Cortes P, Onieva L, Guadix J (2009) Optimizing and simulating the assembly line balancing problem in a motorcycle manufacturing company: A case study. Int J Prod Res 48:3637-3656. doi:10.1080/ 00207540902926522
    • (2009) Int J Prod Res , vol.48 , pp. 3637-3656
    • Cortes, P.1    Onieva, L.2    Guadix, J.3
  • 38
    • 0028531312 scopus 로고
    • The U-line line balancing problem
    • Miltenburg GJ, Wijngaard J (1994) The U-line line balancing problem. Manag Sci 40(10):1378-1988
    • (1994) Manag Sci , vol.40 , Issue.10 , pp. 1378-1988
    • Miltenburg, G.J.1    Wijngaard, J.2
  • 39
    • 33645509107 scopus 로고    scopus 로고
    • Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems
    • Baykasoglu A (2006)Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems. J Intell Manuf 17(2):217-232
    • (2006) J Intell Manuf , vol.17 , Issue.2 , pp. 217-232
    • Baykasoglu, A.1
  • 40
    • 58549088684 scopus 로고    scopus 로고
    • A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems
    • Özcan U, Toklu B (2009) A new hybrid improvement heuristic approach to simple straight and U-type assembly line balancing problems. J Intell Manuf 20(1):123-136
    • (2009) J Intell Manuf , vol.20 , Issue.1 , pp. 123-136
    • Özcan, U.1    Toklu, B.2
  • 41
    • 33846302438 scopus 로고    scopus 로고
    • Binary fuzzy goal programming
    • Chang CT (2007) Binary fuzzy goal programming. Eur J Oper Res 180(1):29-37
    • (2007) Eur J Oper Res , vol.180 , Issue.1 , pp. 29-37
    • Chang, C.T.1
  • 42
    • 55649112933 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for two-sided assembly line balancing
    • Wu EF, Jin J, Bao JS, Hu XF (2008) A branch-and-bound algorithm for two-sided assembly line balancing. Int J Adv Manuf Technol 39(9-10):1009-1015
    • (2008) Int J Adv Manuf Technol , vol.39 , Issue.9-10 , pp. 1009-1015
    • Wu, E.F.1    Jin, J.2    Bao, J.S.3    Hu, X.F.4
  • 43
    • 35348949412 scopus 로고    scopus 로고
    • A station-oriented enumerative algorithm for two-sided assembly line balancing
    • Hu X, Wu E, Jin Y (2008) A station-oriented enumerative algorithm for two-sided assembly line balancing. Eur J Oper Res 186(1):435-440
    • (2008) Eur J Oper Res , vol.186 , Issue.1 , pp. 435-440
    • Hu, X.1    Wu, E.2    Jin, Y.3
  • 44
    • 53749096405 scopus 로고    scopus 로고
    • A mathematical model and a genetic algorithm for two-sided assembly line balancing
    • Kim YK, Song WS, Kim JH (2009) A mathematical model and a genetic algorithm for two-sided assembly line balancing. Comput Oper Res 36(3):853-865
    • (2009) Comput Oper Res , vol.36 , Issue.3 , pp. 853-865
    • Kim, Y.K.1    Song, W.S.2    Kim, J.H.3
  • 45
    • 77953628540 scopus 로고    scopus 로고
    • Balancing parallel two-sided assembly lines
    • doi:10.1080/ 00207540903074991
    • Özcan U, Gokcen H, Toklu B (2009) Balancing parallel two-sided assembly lines. Int J Prod Res 48:4767-4784. doi:10.1080/ 00207540903074991
    • (2009) Int J Prod Res , vol.48 , pp. 4767-4784
    • Özcan, U.1    Gokcen, H.2    Toklu, B.3
  • 46
    • 77954577006 scopus 로고    scopus 로고
    • Balancing two-sided assembly lines with sequence-dependent setup times
    • doi:10.1080/00207540903140750
    • Özcan U, Toklu B (2009) Balancing two-sided assembly lines with sequence-dependent setup times. Int J Prod Res 48:5363-5383. doi:10.1080/00207540903140750
    • (2009) Int J Prod Res , vol.48 , pp. 5363-5383
    • Özcan, U.1    Toklu, B.2
  • 47
    • 56549085980 scopus 로고    scopus 로고
    • Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models
    • Özcan U, Toklu B (2009) Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models. Comput Oper Res 36(6):1955-1965
    • (2009) Comput Oper Res , vol.36 , Issue.6 , pp. 1955-1965
    • Özcan, U.1    Toklu, B.2
  • 48
    • 0037121160 scopus 로고    scopus 로고
    • Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
    • Sawik T (2002) Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. Eur J Oper Res 143(1):115-124
    • (2002) Eur J Oper Res , vol.143 , Issue.1 , pp. 115-124
    • Sawik, T.1
  • 49
    • 77954920614 scopus 로고    scopus 로고
    • Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
    • Ozturk C, Tunali S, Hnich B, Ornek AM (2010) Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times. Electronic Notes in Discrete Mathematics 36:65-72
    • (2010) Electronic Notes in Discrete Mathematics , vol.36 , pp. 65-72
    • Ozturk, C.1    Tunali, S.2    Hnich, B.3    Ornek, A.M.4
  • 50
    • 10444289741 scopus 로고    scopus 로고
    • A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II
    • Simaria AS, Vilarinho PM (2004) A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II. Comput Ind Eng 47(4):391-407
    • (2004) Comput Ind Eng , vol.47 , Issue.4 , pp. 391-407
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 51
    • 53349089869 scopus 로고    scopus 로고
    • Evaluation of performance measures for representing operational objectives of a mixed model assembly line balancing problem
    • Venkatesh JVL, Dabade BM (2008) Evaluation of performance measures for representing operational objectives of a mixed model assembly line balancing problem. Int J Prod Res 46(22):6367-6388
    • (2008) Int J Prod Res , vol.46 , Issue.22 , pp. 6367-6388
    • Venkatesh, J.V.L.1    Dabade, B.M.2
  • 52
    • 43449107965 scopus 로고    scopus 로고
    • Using distributed search methods for balancing mixed-model assembly lines in the automotive industry
    • Bock S (2008) Using distributed search methods for balancing mixed-model assembly lines in the automotive industry. OR Spectr 30(3):551-578
    • (2008) OR Spectr , vol.30 , Issue.3 , pp. 551-578
    • Bock, S.1
  • 53
    • 0035196626 scopus 로고    scopus 로고
    • A genetic algorithm of determining cycle time for printed circuit board assembly lines
    • Ji P, Sze MT, Lee WB (2001) A genetic algorithm of determining cycle time for printed circuit board assembly lines. Eur J Oper Res 128:175-184
    • (2001) Eur J Oper Res , vol.128 , pp. 175-184
    • Ji, P.1    Sze, M.T.2    Lee, W.B.3
  • 54
    • 0033993174 scopus 로고    scopus 로고
    • Two-sided assembly line balancing, a genetic algorithm approach
    • Kim YK, Kim Y, Kim YJ (2000) Two-sided assembly line balancing, a genetic algorithm approach. Production Planning and Control 11(1):44-53
    • (2000) Production Planning and Control , vol.11 , Issue.1 , pp. 44-53
    • Kim, Y.K.1    Kim, Y.2    Kim, Y.J.3
  • 55
    • 0033745068 scopus 로고    scopus 로고
    • A multiobjective genetic algorithm for solving assembly line balancing problems
    • Ponnambalam SG, Aravidan P, Naidu GM (2000) A multiobjective genetic algorithm for solving assembly line balancing problems. Int J Adv Manuf Technol 16(5):297-302
    • (2000) Int J Adv Manuf Technol , vol.16 , Issue.5 , pp. 297-302
    • Ponnambalam, S.G.1    Aravidan, P.2    Naidu, G.M.3
  • 56
    • 0034206772 scopus 로고    scopus 로고
    • Assembly line balancing using genetic algorithms
    • Sabuncuoglu I, Erel E, Tanyer M (2000) Assembly line balancing using genetic algorithms. J Intell Manuf 11(3):295-310
    • (2000) J Intell Manuf , vol.11 , Issue.3 , pp. 295-310
    • Sabuncuoglu, I.1    Erel, E.2    Tanyer, M.3
  • 57
    • 77954214472 scopus 로고    scopus 로고
    • Assembly line balancing based on an adaptive genetic algorithm
    • Yu J, Yin Y (2010) Assembly line balancing based on an adaptive genetic algorithm. Int J Adv Manuf Technol 48(1-4):347-354
    • (2010) Int J Adv Manuf Technol , vol.48 , Issue.1-4 , pp. 347-354
    • Yu, J.1    Yin, Y.2
  • 58
    • 33846998345 scopus 로고    scopus 로고
    • Stochastic U-line balancing using genetic algorithms
    • Baykasoǧlu A, Özbakir L (2006) Stochastic U-line balancing using genetic algorithms. Int J Adv Manuf Technol 32(1-2):139-147
    • (2006) Int J Adv Manuf Technol , vol.32 , Issue.1-2 , pp. 139-147
    • Baykasoǧlu, A.1    Özbakir, L.2
  • 59
    • 0036771306 scopus 로고    scopus 로고
    • A hybrid genetic algorithm approach on multi-objective of assembly planning problem
    • Chen RS, Lu KY, Yu SC (2002) A hybrid genetic algorithm approach on multi-objective of assembly planning problem. Eng Appl Artif Intell 15(5):447-457
    • (2002) Eng Appl Artif Intell , vol.15 , Issue.5 , pp. 447-457
    • Chen, R.S.1    Lu, K.Y.2    Yu, S.C.3
  • 60
    • 58349103925 scopus 로고    scopus 로고
    • Intelligent production control decision support system for flexible assembly lines
    • Guo ZX, Wong WK, Leung SYS, Fan JT (2009) Intelligent production control decision support system for flexible assembly lines. Expert Systems Appl 36(3):4268-4277
    • (2009) Expert Systems Appl , vol.36 , Issue.3 , pp. 4268-4277
    • Guo, Z.X.1    Wong, W.K.2    Leung, S.Y.S.3    Fan, J.T.4
  • 61
    • 38949091830 scopus 로고    scopus 로고
    • A geneticalgorithm-based optimization model for scheduling flexible assembly lines
    • Guo ZX,WongWK, Leung SYS, Fan JT, Chan SF (2009) A geneticalgorithm-based optimization model for scheduling flexible assembly lines. Int J Adv Manuf Technol 36(1-2):156-168
    • (2009) Int J Adv Manuf Technol , vol.36 , Issue.1-2 , pp. 156-168
    • Guo, Z.X.1    Wong, W.K.2    Leung, S.Y.S.3    Fan, J.T.4    Chan, S.F.5
  • 63
    • 0002733643 scopus 로고
    • Intelligent structural operator for k-way group partitioning problem
    • Belew R, Booker L (eds) Morgan Kauffman, San Diego
    • von Laszewski G (1991) Intelligent structural operator for k-way group partitioning problem. In: Belew R, Booker L (eds) Proceedings of the 4th international conference on genetic algorithms. Morgan Kauffman, San Diego, pp 45-52
    • (1991) Proceedings of the 4th International Conference on Genetic Algorithms. , pp. 45-52
    • Von Laszewski, G.1
  • 64
    • 0035399914 scopus 로고    scopus 로고
    • Two-sided assembly line balancing to maximize work relatedness and slackness
    • Lee TO, Kim Y, Kim YK (2001) Two-sided assembly line balancing to maximize work relatedness and slackness. Comput Ind Eng 40:273-292
    • (2001) Comput Ind Eng , vol.40 , pp. 273-292
    • Lee, T.O.1    Kim, Y.2    Kim, Y.K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.