-
1
-
-
84888639932
-
Application of an efficient modified particle swarm optimization algorithm for process planning
-
Li X, Gao L, Wen X (2013) Application of an efficient modified particle swarm optimization algorithm for process planning. Int J Adv Manuf Technol 67(5–8):1355–1369
-
(2013)
Int J Adv Manuf Technol
, vol.67
, Issue.5-8
, pp. 1355-1369
-
-
Li, X.1
Gao, L.2
Wen, X.3
-
2
-
-
84862805879
-
An active learning genetic algorithm for integrated process planning and scheduling
-
Li X, Gao L, Shao X (2012) An active learning genetic algorithm for integrated process planning and scheduling. Expert Syst Appl 39(8):6683–6691
-
(2012)
Expert Syst Appl
, vol.39
, Issue.8
, pp. 6683-6691
-
-
Li, X.1
Gao, L.2
Shao, X.3
-
3
-
-
0032648655
-
Integrating flexible process plans with scheduling in flexible manufacturing systems
-
Saygin C, Kilic SE (1999) Integrating flexible process plans with scheduling in flexible manufacturing systems. Int J Adv Manuf Technol 15(4):268–280
-
(1999)
Int J Adv Manuf Technol
, vol.15
, Issue.4
, pp. 268-280
-
-
Saygin, C.1
Kilic, S.E.2
-
4
-
-
0013278675
-
Decision making on the factory floor: an integrated approach to process planning and scheduling
-
Chryssolouris G, Chan S, Cobb W (1984) Decision making on the factory floor: an integrated approach to process planning and scheduling. Robot Comput Integr Manuf 1(3–4):315–319
-
(1984)
Robot Comput Integr Manuf
, vol.1
, Issue.3-4
, pp. 315-319
-
-
Chryssolouris, G.1
Chan, S.2
Cobb, W.3
-
5
-
-
77949786665
-
A review on integrated process planning and scheduling
-
Li X, Gao L, Zhang C, Shao X (2010) A review on integrated process planning and scheduling. Int J Manuf Res 5(2):161–180
-
(2010)
Int J Manuf Res
, vol.5
, Issue.2
, pp. 161-180
-
-
Li, X.1
Gao, L.2
Zhang, C.3
Shao, X.4
-
6
-
-
70449632611
-
Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach
-
Guo Y, Li W, Mileham AR, Owen GW (2009) Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach. Int J Prod Res 47(14):3775–3796
-
(2009)
Int J Prod Res
, vol.47
, Issue.14
, pp. 3775-3796
-
-
Guo, Y.1
Li, W.2
Mileham, A.R.3
Owen, G.W.4
-
7
-
-
62549129793
-
A grammatical optimization approach for integrated process planning and scheduling
-
Baykasoğlu A, Özbakır L (2009) A grammatical optimization approach for integrated process planning and scheduling. J Intell Manuf 20(2):211–221
-
(2009)
J Intell Manuf
, vol.20
, Issue.2
, pp. 211-221
-
-
Baykasoğlu, A.1
Özbakır, L.2
-
8
-
-
33644699284
-
Integration of process planning and scheduling in a job shop environment
-
Kumar M, Rajotia S (2006) Integration of process planning and scheduling in a job shop environment. Int J Adv Manuf Technol 28(1–2):109–116
-
(2006)
Int J Adv Manuf Technol
, vol.28
, Issue.1-2
, pp. 109-116
-
-
Kumar, M.1
Rajotia, S.2
-
9
-
-
33750028809
-
An integrated scheme for process planning and scheduling in FMS
-
Jain A, Jain PK, Singh IP (2006) An integrated scheme for process planning and scheduling in FMS. Int J Adv Manuf Technol 30(11–12):1111–1118
-
(2006)
Int J Adv Manuf Technol
, vol.30
, Issue.11-12
, pp. 1111-1118
-
-
Jain, A.1
Jain, P.K.2
Singh, I.P.3
-
10
-
-
0033885605
-
Integration of process planning and scheduling—a review
-
Tan W, Khoshnevis B (2000) Integration of process planning and scheduling—a review. J Intell Manuf 11(1):51–63
-
(2000)
J Intell Manuf
, vol.11
, Issue.1
, pp. 51-63
-
-
Tan, W.1
Khoshnevis, B.2
-
11
-
-
79957495235
-
Integration of process planning and scheduling: a state-of-the-art review
-
Phanden RK, Jain A, Verma R (2011) Integration of process planning and scheduling: a state-of-the-art review. Int J Comput Integr Manuf 24(6):517–534
-
(2011)
Int J Comput Integr Manuf
, vol.24
, Issue.6
, pp. 517-534
-
-
Phanden, R.K.1
Jain, A.2
Verma, R.3
-
12
-
-
0346724487
-
Evaluating the impact of alternative plans on manufacturing performance
-
Usher JM (2003) Evaluating the impact of alternative plans on manufacturing performance. Comput Ind Eng 45(4):585–596
-
(2003)
Comput Ind Eng
, vol.45
, Issue.4
, pp. 585-596
-
-
Usher, J.M.1
-
13
-
-
79251627866
-
A progressive approach for the integration of process planning and scheduling
-
Huang SH, Zhang H-C, Smith ML (1995) A progressive approach for the integration of process planning and scheduling. IIE trans 27(4):456–464
-
(1995)
IIE trans
, vol.27
, Issue.4
, pp. 456-464
-
-
Huang, S.H.1
Zhang, H.-C.2
Smith, M.L.3
-
14
-
-
84885190351
-
Reactive scheduling in a job shop where jobs arrive over time
-
Nie L, Gao L, Li P, Shao X (2013) Reactive scheduling in a job shop where jobs arrive over time. Comput Ind Eng 66(2):389–405
-
(2013)
Comput Ind Eng
, vol.66
, Issue.2
, pp. 389-405
-
-
Nie, L.1
Gao, L.2
Li, P.3
Shao, X.4
-
15
-
-
0242485199
-
Reactive scheduling in a dynamic and stochastic FMS environment
-
Sabuncuoglu I, Kizilisik OB (2003) Reactive scheduling in a dynamic and stochastic FMS environment. Int J Prod Res 41(17):4211–4231
-
(2003)
Int J Prod Res
, vol.41
, Issue.17
, pp. 4211-4231
-
-
Sabuncuoglu, I.1
Kizilisik, O.B.2
-
16
-
-
84857782251
-
Multi-agent-based proactive-reactive scheduling for a job shop
-
Lou P, Liu Q, Zhou Z, Wang H, Sun S (2012) Multi-agent-based proactive-reactive scheduling for a job shop. Int J Adv Manuf Technol 59(1–4):311–324
-
(2012)
Int J Adv Manuf Technol
, vol.59
, Issue.1-4
, pp. 311-324
-
-
Lou, P.1
Liu, Q.2
Zhou, Z.3
Wang, H.4
Sun, S.5
-
17
-
-
84875448680
-
Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies
-
He W, D-h S (2013) Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies. Int J Adv Manuf Technol 66(1–4):501–514
-
(2013)
Int J Adv Manuf Technol
, vol.66
, Issue.1-4
, pp. 501-514
-
-
He, W.1
D-h, S.2
-
18
-
-
0030270466
-
Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities
-
Ho YC, Moodie CL (1996) Solving cell formation problems in a manufacturing environment with flexible processing and routing capabilities. Int J Prod Res 34(10):2901–2923
-
(1996)
Int J Prod Res
, vol.34
, Issue.10
, pp. 2901-2923
-
-
Ho, Y.C.1
Moodie, C.L.2
-
19
-
-
0037410965
-
A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
-
Kim YK, Park K, Ko J (2003) A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Comput Oper Res 30(8):1151–1171
-
(2003)
Comput Oper Res
, vol.30
, Issue.8
, pp. 1151-1171
-
-
Kim, Y.K.1
Park, K.2
Ko, J.3
-
20
-
-
56549112491
-
Integration of process planning and scheduling—a modified genetic algorithm-based approach
-
Shao X, Li X, Gao L, Zhang C (2009) Integration of process planning and scheduling—a modified genetic algorithm-based approach. Comput Oper Res 36(6):2082–2096
-
(2009)
Comput Oper Res
, vol.36
, Issue.6
, pp. 2082-2096
-
-
Shao, X.1
Li, X.2
Gao, L.3
Zhang, C.4
-
21
-
-
4344620927
-
A linearized polynomial mixed integer programming model for the integration of process planning and scheduling
-
Tan W, Khoshnevis B (2004) A linearized polynomial mixed integer programming model for the integration of process planning and scheduling. J Intell Manuf 15(5):593–605
-
(2004)
J Intell Manuf
, vol.15
, Issue.5
, pp. 593-605
-
-
Tan, W.1
Khoshnevis, B.2
-
22
-
-
70350568684
-
Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling
-
Li X, Gao L, Shao X, Zhang C, Wang C (2010) Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling. Comput Oper Res 37(4):656–667
-
(2010)
Comput Oper Res
, vol.37
, Issue.4
, pp. 656-667
-
-
Li, X.1
Gao, L.2
Shao, X.3
Zhang, C.4
Wang, C.5
-
23
-
-
0037141357
-
Hybrid genetic algorithm and simulated annealing approach for the optimization of process plans for prismatic parts
-
Li WD, Ong SK, Nee AYC (2002) Hybrid genetic algorithm and simulated annealing approach for the optimization of process plans for prismatic parts. Int J Prod Res 40(8):1899–1922
-
(2002)
Int J Prod Res
, vol.40
, Issue.8
, pp. 1899-1922
-
-
Li, W.D.1
Ong, S.K.2
Nee, A.Y.C.3
-
24
-
-
34250219585
-
A very fast TS/SA algorithm for the job shop scheduling problem
-
Zhang CY, Li P, Rao Y, Guan Z (2008) A very fast TS/SA algorithm for the job shop scheduling problem. Comput Oper Res 35(1):282–294
-
(2008)
Comput Oper Res
, vol.35
, Issue.1
, pp. 282-294
-
-
Zhang, C.Y.1
Li, P.2
Rao, Y.3
Guan, Z.4
-
25
-
-
77953685044
-
An effective hybrid algorithm for integrated process planning and scheduling
-
Li X, Shao X, Gao L, Qian W (2010) An effective hybrid algorithm for integrated process planning and scheduling. Int J Prod Econ 126(2):289–298
-
(2010)
Int J Prod Econ
, vol.126
, Issue.2
, pp. 289-298
-
-
Li, X.1
Shao, X.2
Gao, L.3
Qian, W.4
-
26
-
-
14044268702
-
An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
-
Xia W, Wu Z (2005) An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems. Comput Ind Eng 48(2):409–425
-
(2005)
Comput Ind Eng
, vol.48
, Issue.2
, pp. 409-425
-
-
Xia, W.1
Wu, Z.2
|