메뉴 건너뛰기




Volumn 20, Issue 2, 2009, Pages 211-221

A grammatical optimization approach for integrated process planning and scheduling

Author keywords

Grammars; Process planning; Scheduling; Tabu Search

Indexed keywords

PROCESS CONTROL; PROCESS PLANNING; SCHEDULING;

EID: 62549129793     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-008-0223-0     Document Type: Article
Times cited : (35)

References (38)
  • 2
    • 0033339759 scopus 로고    scopus 로고
    • A taboo search based approach to find the Pareto optimal set in multiple objective optimisation
    • A. Baykasoǧlu S. Owen N. Gindy 1999 A taboo search based approach to find the Pareto optimal set in multiple objective optimisation Engineering Optimization 31 731 748
    • (1999) Engineering Optimization , vol.31 , pp. 731-748
    • Baykasoǧlu, A.1    Owen, S.2    Gindy, N.3
  • 3
    • 4944252227 scopus 로고    scopus 로고
    • Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems
    • A. Baykasoǧlu L. ÖzbakIr A. İ. Sönmez 2004 Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems Journal of Intelligent Manufacturing 15 6 777 785
    • (2004) Journal of Intelligent Manufacturing , vol.15 , Issue.6 , pp. 777-785
    • Baykasoǧlu, A.1    Özbakir, L.2    Sönmez, A.I.3
  • 7
    • 0345403336 scopus 로고
    • Bridging the gap between process planning and production planning and scheduling
    • H.A. ElMaraghy W.H. ElMaraghy 1993 Bridging the gap between process planning and production planning and scheduling Manufacturing Systems 22 5 11
    • (1993) Manufacturing Systems , vol.22 , pp. 5-11
    • Elmaraghy, H.A.1    Elmaraghy, W.H.2
  • 11
    • 0000131281 scopus 로고
    • Algorithms for solving production scheduling problems
    • B. Giffler G. Thompson 1960 Algorithms for solving production scheduling problems Operations Research 8 487 503
    • (1960) Operations Research , vol.8 , pp. 487-503
    • Giffler, B.1    Thompson, G.2
  • 12
    • 0032630439 scopus 로고    scopus 로고
    • Manufacturing responsiveness through integrated process planning and scheduling
    • N.N. Gindy S.M. Saad Y. Yue 1999 Manufacturing responsiveness through integrated process planning and scheduling International Journal of Production Research 37 2399 2418
    • (1999) International Journal of Production Research , vol.37 , pp. 2399-2418
    • Gindy, N.N.1    Saad, S.M.2    Yue, Y.3
  • 13
    • 0002703574 scopus 로고
    • Tabu search: A tutorial
    • F. Glover 1990 Tabu search: A tutorial Interfaces 20 74 94
    • (1990) Interfaces , vol.20 , pp. 74-94
    • Glover, F.1
  • 17
    • 0037201140 scopus 로고    scopus 로고
    • Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
    • I. Kacem S. Hammadi P. Borne 2002 Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic Mathematics and Computers in Simulation 60 245 276
    • (2002) Mathematics and Computers in Simulation , vol.60 , pp. 245-276
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 18
    • 0036464279 scopus 로고    scopus 로고
    • Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
    • I. Kacem S. Hammadi P. Borne 2002 Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems IEEE Transactions on Systems, Man and Cybernetics-Part C 32 1 1 13
    • (2002) IEEE Transactions on Systems, Man and Cybernetics-Part C , vol.32 , Issue.1 , pp. 1-13
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 23
    • 0026435757 scopus 로고
    • Applied methods for integration of process planning and production control
    • ASME
    • Larsen, N. E., & Clausen, J. (1992). Applied methods for integration of process planning and production control. In Proceedings of Manufacturing International'92, ASME, pp. 349-364.
    • (1992) Proceedings of Manufacturing International'92 , pp. 349-364
    • Larsen, N.E.1    Clausen, J.2
  • 24
    • 0035175069 scopus 로고    scopus 로고
    • Integration of process planning and scheduling using simulation based genetic algorithms
    • H. Lee S.S. Kim 2001 Integration of process planning and scheduling using simulation based genetic algorithms International Journal of Advanced Manufacturing Technology 18 586 590
    • (2001) International Journal of Advanced Manufacturing Technology , vol.18 , pp. 586-590
    • Lee, H.1    Kim, S.S.2
  • 25
    • 33751504128 scopus 로고    scopus 로고
    • A simulated annealing-based optimization approach for integrated process planning and scheduling
    • W.D. Li C.S. McMahon 2007 A simulated annealing-based optimization approach for integrated process planning and scheduling International Journal of Computer Integrated Manufacturing 20 1 80 95
    • (2007) International Journal of Computer Integrated Manufacturing , vol.20 , Issue.1 , pp. 80-95
    • Li, W.D.1    McMahon, C.S.2
  • 26
    • 0032642660 scopus 로고    scopus 로고
    • Genetic algorithms in integrated process planning and scheduling
    • N. Morad A.M.S. Zalzala 1999 Genetic algorithms in integrated process planning and scheduling Journal of Intelligent Manufacturing 10 169 179
    • (1999) Journal of Intelligent Manufacturing , vol.10 , pp. 169-179
    • Morad, N.1    Zalzala, A.M.S.2
  • 27
    • 0000481860 scopus 로고    scopus 로고
    • A simulated annealing approach to integrated production scheduling
    • G.J. Palmer 1996 A simulated annealing approach to integrated production scheduling Journal of Intelligent Manufacturing 7 163 176
    • (1996) Journal of Intelligent Manufacturing , vol.7 , pp. 163-176
    • Palmer, G.J.1
  • 28
    • 84886385657 scopus 로고    scopus 로고
    • A genetic algorithm for integration of process planning and scheduling in a job shop
    • A. Sattar & B. H. Kang (Eds.), AI 2006 Springer-Verlag
    • Park, B. J., & Choi, H. R. (2006). A genetic algorithm for integration of process planning and scheduling in a job shop. In A. Sattar & B. H. Kang (Eds.), AI 2006, LNAI 4304 (pp. 647-657). Springer-Verlag.
    • (2006) LNAI , vol.4304 , pp. 647-657
    • Park, B.J.1    Choi, H.R.2
  • 30
    • 80052993037 scopus 로고    scopus 로고
    • Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey
    • W. Shen L. Wang Q. Hao 2006 Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey IEEE Transactions on Systems, Man and Cybernetics-Part C 36 4 563 576
    • (2006) IEEE Transactions on Systems, Man and Cybernetics-Part C , vol.36 , Issue.4 , pp. 563-576
    • Shen, W.1    Wang, L.2    Hao, Q.3
  • 31
    • 0344272408 scopus 로고    scopus 로고
    • Generation of alternative process plans in integrated manufacturing systems
    • D.N. Sormaz B. Khoshnevis 2003 Generation of alternative process plans in integrated manufacturing systems Journal of Intelligent Manufacturing 14 509 526
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 509-526
    • Sormaz, D.N.1    Khoshnevis, B.2
  • 35
    • 0027151172 scopus 로고
    • IPPM-A prototype to integrate process planning and job shop scheduling functions
    • H.C. Zhang 1993 IPPM-A prototype to integrate process planning and job shop scheduling functions Annals of the CIRP 42 513 518
    • (1993) Annals of the CIRP , vol.42 , pp. 513-518
    • Zhang, H.C.1
  • 38
    • 0242269797 scopus 로고    scopus 로고
    • Integration of process planning and scheduling by exploring the flexibility of process planning
    • Y.F. Zhang A.N. Saravanan J.Y.H. Fuh 2003 Integration of process planning and scheduling by exploring the flexibility of process planning International Journal of Production Research 41 3 611 628
    • (2003) International Journal of Production Research , vol.41 , Issue.3 , pp. 611-628
    • Zhang, Y.F.1    Saravanan, A.N.2    Fuh, J.Y.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.