1
-
-
84894229281
-
A new approach for project control under uncertainty. going back to the basics
-
Acebes F., Pajares J., Galan J.M., Lopez-Paredes A. A new approach for project control under uncertainty. going back to the basics. Int. J. Proj. Manag. 2014, 32:423-434.
-
(2014)
Int. J. Proj. Manag.
, vol.32
, pp. 423-434
-
-
Acebes, F.1
Pajares, J.2
Galan, J.M.3
Lopez-Paredes, A.4
-
2
-
-
84874288661
-
Monitoring project duration and cost in a construction project by applying statistical quality control charts
-
Aliverdi R., Naeni L.M., Salehipour A. Monitoring project duration and cost in a construction project by applying statistical quality control charts. Int. J. Proj. Manag. 2013, 31:411-423.
-
(2013)
Int. J. Proj. Manag.
, vol.31
, pp. 411-423
-
-
Aliverdi, R.1
Naeni, L.M.2
Salehipour, A.3
-
3
-
-
33645957411
-
Earned value project management method and extensions
-
Anbari F.T. Earned value project management method and extensions. Proj. Manag. J. 2003, 34:12-23.
-
(2003)
Proj. Manag. J.
, vol.34
, pp. 12-23
-
-
Anbari, F.T.1
-
5
-
-
5144232431
-
Executing production schedules in the face of uncertainties: a review and some future directions
-
Aytug H., Lawley M.A., McKay K., Mohan S., Uzsoy R. Executing production schedules in the face of uncertainties: a review and some future directions. Eur. J. Oper. Res. 2005, 161:86-110.
-
(2005)
Eur. J. Oper. Res.
, vol.161
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.3
Mohan, S.4
Uzsoy, R.5
-
6
-
-
33846882404
-
Time-cost trade-off via optimal control theory in Markov PERT networks
-
Azaron A., Katagiri H., Sakawa M. Time-cost trade-off via optimal control theory in Markov PERT networks. Ann. Oper. Res. 2007, 150:47-64.
-
(2007)
Ann. Oper. Res.
, vol.150
, pp. 47-64
-
-
Azaron, A.1
Katagiri, H.2
Sakawa, M.3
-
7
-
-
22544447228
-
A statistical project control tool for engineering managers
-
Bausch G.T., Chung C.A. A statistical project control tool for engineering managers. Proj. Manag. J. 2001, 32:37-44.
-
(2001)
Proj. Manag. J.
, vol.32
, pp. 37-44
-
-
Bausch, G.T.1
Chung, C.A.2
-
8
-
-
33746257414
-
Developing activity duration specification limits for effective project control
-
Bowman R.A. Developing activity duration specification limits for effective project control. Eur. J. Oper. Res. 2006, 174:1191-1204.
-
(2006)
Eur. J. Oper. Res.
, vol.174
, pp. 1191-1204
-
-
Bowman, R.A.1
-
9
-
-
0034300782
-
A spreadsheet-based decision support system for wood panel manufacturing
-
Buehlmann U., Ragsdale C.T., Gfeller B. A spreadsheet-based decision support system for wood panel manufacturing. Decis. Support. Syst. 2000, 29:207-227.
-
(2000)
Decis. Support. Syst.
, vol.29
, pp. 207-227
-
-
Buehlmann, U.1
Ragsdale, C.T.2
Gfeller, B.3
-
10
-
-
84872723607
-
A Bayesian approach to improve estimate at completion in earned value management
-
Caron F., Ruggeri F., Merli A. A Bayesian approach to improve estimate at completion in earned value management. Proj. Manag. J. 2013, 44:3-16.
-
(2013)
Proj. Manag. J.
, vol.44
, pp. 3-16
-
-
Caron, F.1
Ruggeri, F.2
Merli, A.3
-
11
-
-
84880638650
-
Monitoring the software development process using a short-run control chart
-
Chang C.W., Tong L.I. Monitoring the software development process using a short-run control chart. Softw. Qual. J. 2013, 21:479-499.
-
(2013)
Softw. Qual. J.
, vol.21
, pp. 479-499
-
-
Chang, C.W.1
Tong, L.I.2
-
12
-
-
15844413358
-
A tool for managing projects: an analytic parameterization of the S-curve
-
Cioffi D.F. A tool for managing projects: an analytic parameterization of the S-curve. Int. J. Proj. Manag. 2005, 23:215-222.
-
(2005)
Int. J. Proj. Manag.
, vol.23
, pp. 215-222
-
-
Cioffi, D.F.1
-
13
-
-
17444420771
-
Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology
-
Cohen I., Golany B., Shtub A. Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology. Ann. Oper. Res. 2005, 134:183-199.
-
(2005)
Ann. Oper. Res.
, vol.134
, pp. 183-199
-
-
Cohen, I.1
Golany, B.2
Shtub, A.3
-
14
-
-
77951623200
-
Simulator-based team training to share resources in a matrix structure organization
-
Davidovitch L., Parush A., Shtub A. Simulator-based team training to share resources in a matrix structure organization. IEEE Trans. Eng. Manag. 2010, 57:288-300.
-
(2010)
IEEE Trans. Eng. Manag.
, vol.57
, pp. 288-300
-
-
Davidovitch, L.1
Parush, A.2
Shtub, A.3
-
15
-
-
84986166756
-
Decision support system for risk management: a case study
-
Dey P.K. Decision support system for risk management: a case study. Manag. Decis. 2001, 39:634-649.
-
(2001)
Manag. Decis.
, vol.39
, pp. 634-649
-
-
Dey, P.K.1
-
16
-
-
33749575089
-
Using fuzzy decision making for the evaluation of the project management internal efficiency
-
Dweiri F., Kablan M. Using fuzzy decision making for the evaluation of the project management internal efficiency. Decis. Support. Syst. 2006, 42:712-726.
-
(2006)
Decis. Support. Syst.
, vol.42
, pp. 712-726
-
-
Dweiri, F.1
Kablan, M.2
-
17
-
-
0032594626
-
Improving the cost and schedule control system
-
El-Mashaleh M.S., Chasey A.D. Improving the cost and schedule control system. Cost Eng. 1999, 41:39-42.
-
(1999)
Cost Eng.
, vol.41
, pp. 39-42
-
-
El-Mashaleh, M.S.1
Chasey, A.D.2
-
18
-
-
84875117724
-
Impact of sensitivity information on the prediction of project's duration using earned schedule method
-
Elshaer R. Impact of sensitivity information on the prediction of project's duration using earned schedule method. Int. J. Proj. Manag. 2013, 31:579-588.
-
(2013)
Int. J. Proj. Manag.
, vol.31
, pp. 579-588
-
-
Elshaer, R.1
-
19
-
-
33750475183
-
A survey of decision support system applications (1995-2001)
-
Eom S., Kim E. A survey of decision support system applications (1995-2001). J. Oper. Res. Soc. 1997, 57:1264-1278.
-
(1997)
J. Oper. Res. Soc.
, vol.57
, pp. 1264-1278
-
-
Eom, S.1
Kim, E.2
-
20
-
-
0031999964
-
Timing of control activities in project planning
-
Falco M.D., Macchiaroli R. Timing of control activities in project planning. Int. J. Proj. Manag. 1998, 16:51-58.
-
(1998)
Int. J. Proj. Manag.
, vol.16
, pp. 51-58
-
-
Falco, M.D.1
Macchiaroli, R.2
-
21
-
-
84855984356
-
A simulation-based risk network model for decision support in project risk management
-
Fang C., Marle F. A simulation-based risk network model for decision support in project risk management. Decis. Support. Syst. 2012, 52:635-644.
-
(2012)
Decis. Support. Syst.
, vol.52
, pp. 635-644
-
-
Fang, C.1
Marle, F.2
-
22
-
-
33746627741
-
Evaluating the relative performance of engineering design projects: a case study using data envelopment analysis
-
Farris J., Groesbeck R., Van Aken E., Letens G. Evaluating the relative performance of engineering design projects: a case study using data envelopment analysis. IEEE Trans. Eng. Manag. 2006, 53:471-482.
-
(2006)
IEEE Trans. Eng. Manag.
, vol.53
, pp. 471-482
-
-
Farris, J.1
Groesbeck, R.2
Van Aken, E.3
Letens, G.4
-
24
-
-
0031070492
-
On-line control model for network construction projects
-
Golenko-Ginzburg D., Gonik A. On-line control model for network construction projects. J. Oper. Res. Soc. 1997, 48:175-183.
-
(1997)
J. Oper. Res. Soc.
, vol.48
, pp. 175-183
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
25
-
-
84862549719
-
Designing decision support systems for value-based management: a survey and an architecture
-
Hahn G., Kuhn H. Designing decision support systems for value-based management: a survey and an architecture. Decis. Support. Syst. 2012, 53:591-598.
-
(2012)
Decis. Support. Syst.
, vol.53
, pp. 591-598
-
-
Hahn, G.1
Kuhn, H.2
-
26
-
-
84863308988
-
Project management: recent developments and research opportunities
-
Hall N.G. Project management: recent developments and research opportunities. J. Syst. Sci. Syst. Eng. 2012, 21:129-143.
-
(2012)
J. Syst. Sci. Syst. Eng.
, vol.21
, pp. 129-143
-
-
Hall, N.G.1
-
27
-
-
33751531856
-
A hierarchical approach to multi-project planning under uncertainty
-
Hans E., Herroelen W., Leus R., Wullink G. A hierarchical approach to multi-project planning under uncertainty. Omega 2007, 35:563-577.
-
(2007)
Omega
, vol.35
, pp. 563-577
-
-
Hans, E.1
Herroelen, W.2
Leus, R.3
Wullink, G.4
-
28
-
-
0035480326
-
The prediction and control of project duration: a recursive model
-
Hardie N. The prediction and control of project duration: a recursive model. Int. J. Proj. Manag. 2001, 19:401-409.
-
(2001)
Int. J. Proj. Manag.
, vol.19
, pp. 401-409
-
-
Hardie, N.1
-
29
-
-
84872675946
-
An integrated scheduling and control model for multi-mode projects
-
Hazir O., Schmidt K. An integrated scheduling and control model for multi-mode projects. Flex. Serv. Manuf. J. 2013, 25:230-254.
-
(2013)
Flex. Serv. Manuf. J.
, vol.25
, pp. 230-254
-
-
Hazir, O.1
Schmidt, K.2
-
30
-
-
80755181224
-
Effects of the information presentation format on project control
-
Hazir O., Shtub A. Effects of the information presentation format on project control. J. Oper. Res. Soc. 2011, 62:2157-2161.
-
(2011)
J. Oper. Res. Soc.
, vol.62
, pp. 2157-2161
-
-
Hazir, O.1
Shtub, A.2
-
31
-
-
33646106557
-
Project scheduling - theory and practice
-
Herroelen W. Project scheduling - theory and practice. Prod. Oper. Manag. 2005, 14:413-432.
-
(2005)
Prod. Oper. Manag.
, vol.14
, pp. 413-432
-
-
Herroelen, W.1
-
32
-
-
13444269168
-
Project scheduling under uncertainty: survey and research potentials
-
Herroelen W., Leus R. Project scheduling under uncertainty: survey and research potentials. Eur. J. Oper. Res. 2005, 165:289-306.
-
(2005)
Eur. J. Oper. Res.
, vol.165
, pp. 289-306
-
-
Herroelen, W.1
Leus, R.2
-
33
-
-
84878705610
-
Optimal allocation of testing effort during testing and debugging phases: a control theoretic approach
-
Kapur P., Pham H., Chanda U., Kumar V. Optimal allocation of testing effort during testing and debugging phases: a control theoretic approach. Int. J. Syst. Sci. 2013, 44:1639-1650.
-
(2013)
Int. J. Syst. Sci.
, vol.44
, pp. 1639-1650
-
-
Kapur, P.1
Pham, H.2
Chanda, U.3
Kumar, V.4
-
34
-
-
67349138638
-
The effectiveness of resource levelling tools for resource constraint project scheduling problem
-
Kastor A., Sirakoulis K. The effectiveness of resource levelling tools for resource constraint project scheduling problem. Int. J. Proj. Manag. 2009, 27:493-500.
-
(2009)
Int. J. Proj. Manag.
, vol.27
, pp. 493-500
-
-
Kastor, A.1
Sirakoulis, K.2
-
35
-
-
84901619040
-
EDM: earned duration management, a new approach to schedule performance management and measurement
-
Khamooshi H., Golafshani H. EDM: earned duration management, a new approach to schedule performance management and measurement. Int. J. Proj. Manag. 2014, 32:1019-1041.
-
(2014)
Int. J. Proj. Manag.
, vol.32
, pp. 1019-1041
-
-
Khamooshi, H.1
Golafshani, H.2
-
36
-
-
0036164988
-
Optimal control in homogeneous projects: analytically solvable deterministic cases
-
Kogan K., Raz T., Elitzur R. Optimal control in homogeneous projects: analytically solvable deterministic cases. IIE Trans. 2002, 34:63-75.
-
(2002)
IIE Trans.
, vol.34
, pp. 63-75
-
-
Kogan, K.1
Raz, T.2
Elitzur, R.3
-
37
-
-
0000801563
-
An integrated survey of deterministic project scheduling
-
Kolisch R., Padman R. An integrated survey of deterministic project scheduling. Omega 2001, 29:249-272.
-
(2001)
Omega
, vol.29
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
38
-
-
68049106327
-
Exploring Monte Carlo simulation applications for project management
-
Kwaka Y.H., Ingall L. Exploring Monte Carlo simulation applications for project management. Risk Manag. 2007, 9:44-57.
-
(2007)
Risk Manag.
, vol.9
, pp. 44-57
-
-
Kwaka, Y.H.1
Ingall, L.2
-
39
-
-
71649097609
-
Towards a multi-dimensional project performance measurement system
-
Lauras M., Marques G., Gourc D. Towards a multi-dimensional project performance measurement system. Decis. Support. Syst. 2010, 48:342-353.
-
(2010)
Decis. Support. Syst.
, vol.48
, pp. 342-353
-
-
Lauras, M.1
Marques, G.2
Gourc, D.3
-
40
-
-
0037596721
-
Factors influencing the usage and selection of project management software
-
Liberatore M., Pollack-Johnson B. Factors influencing the usage and selection of project management software. IEEE Trans. Eng. Manag. 2003, 50:164-174.
-
(2003)
IEEE Trans. Eng. Manag.
, vol.50
, pp. 164-174
-
-
Liberatore, M.1
Pollack-Johnson, B.2
-
41
-
-
0035279805
-
Project management in construction: software use and research directions
-
Liberatore M., Pollack-Johnson B., Smith C. Project management in construction: software use and research directions. J. Constr. Eng. Manag. 2001, 127:101-107.
-
(2001)
J. Constr. Eng. Manag.
, vol.127
, pp. 101-107
-
-
Liberatore, M.1
Pollack-Johnson, B.2
Smith, C.3
-
42
-
-
64449085007
-
Prediction of project outcome: the application of statistical methods to earned value management and earned schedule performance indexes
-
Lipke W., Zwikael O., Henderson K., Anbari F. Prediction of project outcome: the application of statistical methods to earned value management and earned schedule performance indexes. Int. J. Proj. Manag. 2009, 27:400-407.
-
(2009)
Int. J. Proj. Manag.
, vol.27
, pp. 400-407
-
-
Lipke, W.1
Zwikael, O.2
Henderson, K.3
Anbari, F.4
-
43
-
-
33748202986
-
An intelligent early warning system for software quality improvement and project management
-
Liu X.F., Kane G., Bambroo M. An intelligent early warning system for software quality improvement and project management. J. Syst. Softw. 2006, 79:1552-1564.
-
(2006)
J. Syst. Softw.
, vol.79
, pp. 1552-1564
-
-
Liu, X.F.1
Kane, G.2
Bambroo, M.3
-
44
-
-
79955761935
-
Decision support and optimization in shutdown and turnaround scheduling
-
Megow N., Möhring R.H., Schulz J. Decision support and optimization in shutdown and turnaround scheduling. INFORMS J. Comput. 2011, 23:189-204.
-
(2011)
INFORMS J. Comput.
, vol.23
, pp. 189-204
-
-
Megow, N.1
Möhring, R.H.2
Schulz, J.3
-
46
-
-
79952441224
-
Evaluating fuzzy earned value indices and estimates by applying alpha cuts
-
Naeni L.M., Salehipour A. Evaluating fuzzy earned value indices and estimates by applying alpha cuts. Expert Syst. Appl. 2011, 38:8193-8198.
-
(2011)
Expert Syst. Appl.
, vol.38
, pp. 8193-8198
-
-
Naeni, L.M.1
Salehipour, A.2
-
47
-
-
84901636676
-
An earned schedule-based regression model to improve cost estimate at completion
-
Narbaev T., Marco A.D. An earned schedule-based regression model to improve cost estimate at completion. Int. J. Proj. Manag. 2014, 32:1007-1018.
-
(2014)
Int. J. Proj. Manag.
, vol.32
, pp. 1007-1018
-
-
Narbaev, T.1
Marco, A.D.2
-
48
-
-
84874548283
-
A decision-making tool to maximize chances of meeting project commitments
-
Nguyen T.H., Marmier F., Gourc D. A decision-making tool to maximize chances of meeting project commitments. Int. J. Prod. Econ. 2013, 142:214-224.
-
(2013)
Int. J. Prod. Econ.
, vol.142
, pp. 214-224
-
-
Nguyen, T.H.1
Marmier, F.2
Gourc, D.3
-
49
-
-
0021434091
-
Optimal control policies for resource allocation in an activity network
-
Nowicki E., Zdrzalka S. Optimal control policies for resource allocation in an activity network. Eur. J. Oper. Res. 1984, 16:198-214.
-
(1984)
Eur. J. Oper. Res.
, vol.16
, pp. 198-214
-
-
Nowicki, E.1
Zdrzalka, S.2
-
51
-
-
79955974818
-
An extension of the EVM analysis for project monitoring: the cost control index and the schedule control index
-
Pajares J., Lopez-Paredes A. An extension of the EVM analysis for project monitoring: the cost control index and the schedule control index. Int. J. Proj. Manag. 2011, 29:615-621.
-
(2011)
Int. J. Proj. Manag.
, vol.29
, pp. 615-621
-
-
Pajares, J.1
Lopez-Paredes, A.2
-
52
-
-
0027542416
-
Timing of monitoring and control of CPM projects
-
Partovi F., Burton J. Timing of monitoring and control of CPM projects. IEEE Trans. Eng. Manag. 1993, 40:68-75.
-
(1993)
IEEE Trans. Eng. Manag.
, vol.40
, pp. 68-75
-
-
Partovi, F.1
Burton, J.2
-
53
-
-
72049118175
-
A model-based DSS for integrating the impact of learning in project control
-
Plaza M., Turetken O. A model-based DSS for integrating the impact of learning in project control. Decis. Support. Syst. 2009, 47:488-499.
-
(2009)
Decis. Support. Syst.
, vol.47
, pp. 488-499
-
-
Plaza, M.1
Turetken, O.2
-
54
-
-
33947502562
-
Model-driven decision support systems: concepts and research directions
-
Power D.J., Sharda R. Model-driven decision support systems: concepts and research directions. Decis. Support. Syst. 2007, 43:1044-1061.
-
(2007)
Decis. Support. Syst.
, vol.43
, pp. 1044-1061
-
-
Power, D.J.1
Sharda, R.2
-
55
-
-
0034563573
-
Optimal timing of project control points
-
Raz T., Erel E. Optimal timing of project control points. Eur. J. Oper. Res. 2000, 127:252-261.
-
(2000)
Eur. J. Oper. Res.
, vol.127
, pp. 252-261
-
-
Raz, T.1
Erel, E.2
-
59
-
-
0036604498
-
Past, present, and future of decision support technology
-
Shim J., Warkentin M., Courtney J.F., Power D.J., Sharda R., Carlsson C. Past, present, and future of decision support technology. Decis. Support. Syst. 2002, 33:111-126.
-
(2002)
Decis. Support. Syst.
, vol.33
, pp. 111-126
-
-
Shim, J.1
Warkentin, M.2
Courtney, J.F.3
Power, D.J.4
Sharda, R.5
Carlsson, C.6
-
60
-
-
27944499151
-
-
Pearson, Prentice Hall
-
Shtub A., Bard J.F., Globerson S.S. Project Management: Processes, Methodologies, and Economics 2005, Pearson, Prentice Hall. 2nd edition.
-
(2005)
Project Management: Processes, Methodologies, and Economics
-
-
Shtub, A.1
Bard, J.F.2
Globerson, S.S.3
-
61
-
-
33750559364
-
Simulation-based learning in engineering education: performance and transfer in learning project management
-
Shtub A., Parush A., Davidovitch L. Simulation-based learning in engineering education: performance and transfer in learning project management. J. Eng. Educ. 2006, 95.
-
(2006)
J. Eng. Educ.
, vol.95
-
-
Shtub, A.1
Parush, A.2
Davidovitch, L.3
-
63
-
-
84861836907
-
A review of applications of analytic hierarchy process in operations management
-
Subramanian N., Ramanathan R. A review of applications of analytic hierarchy process in operations management. Int. J. Prod. Econ. 2012, 138:215-241.
-
(2012)
Int. J. Prod. Econ.
, vol.138
, pp. 215-241
-
-
Subramanian, N.1
Ramanathan, R.2
-
64
-
-
0036027411
-
A review of the contribution of operational research to project management
-
Tavares L. A review of the contribution of operational research to project management. Eur. J. Oper. Res. 2002, 136:1-18.
-
(2002)
Eur. J. Oper. Res.
, vol.136
, pp. 1-18
-
-
Tavares, L.1
-
66
-
-
84859217753
-
PERT 21: fitting PERT/CPM for use in the 21st century
-
Trietsch D., Baker K.R. PERT 21: fitting PERT/CPM for use in the 21st century. Int. J. Proj. Manag. 2012, 30:490-502.
-
(2012)
Int. J. Proj. Manag.
, vol.30
, pp. 490-502
-
-
Trietsch, D.1
Baker, K.R.2
-
67
-
-
79952631789
-
Statistical analysis for comparison of overall performance of projects using Weibull analysis on earned value metrics
-
Tseng C.C. Statistical analysis for comparison of overall performance of projects using Weibull analysis on earned value metrics. J. Chin. Inst. Ind. Eng. 2011, 28:165-178.
-
(2011)
J. Chin. Inst. Ind. Eng.
, vol.28
, pp. 165-178
-
-
Tseng, C.C.1
-
68
-
-
33645967441
-
A comparison of different project duration forecasting methods using earned value metrics
-
Vandevoorde S., Vanhoucke M. A comparison of different project duration forecasting methods using earned value metrics. J. Oper. Res. Soc. 2006, 24:289-302.
-
(2006)
J. Oper. Res. Soc.
, vol.24
, pp. 289-302
-
-
Vandevoorde, S.1
Vanhoucke, M.2
-
70
-
-
77953177108
-
Using activity sensitivity and network topology information to monitor project time performance
-
Vanhoucke M. Using activity sensitivity and network topology information to monitor project time performance. Omega 2010, 38:359-370.
-
(2010)
Omega
, vol.38
, pp. 359-370
-
-
Vanhoucke, M.1
-
71
-
-
78649854792
-
On the dynamic use of project performance and schedule risk information during project tracking
-
Vanhoucke M. On the dynamic use of project performance and schedule risk information during project tracking. Omega 2011, 39:416-426.
-
(2011)
Omega
, vol.39
, pp. 416-426
-
-
Vanhoucke, M.1
-
72
-
-
84655167747
-
Measuring the efficiency of project control using fictitious and empirical project data
-
Vanhoucke M. Measuring the efficiency of project control using fictitious and empirical project data. Int. J. Proj. Manag. 2012, 30:252-263.
-
(2012)
Int. J. Proj. Manag.
, vol.30
, pp. 252-263
-
-
Vanhoucke, M.1
-
73
-
-
84925183369
-
An overview of recent research results and future research avenues using simulation studies in project management
-
Vanhoucke M. An overview of recent research results and future research avenues using simulation studies in project management. ISRN Comput. Math. 2013, 10.1155/2013/513549.
-
(2013)
ISRN Comput. Math.
-
-
Vanhoucke, M.1
-
74
-
-
35448944883
-
A simulation and evaluation of earned value metrics to forecast the project duration
-
Vanhoucke M., Vandevoorde S. A simulation and evaluation of earned value metrics to forecast the project duration. Int. J. Proj. Manag. 2007, 58:1361-1374.
-
(2007)
Int. J. Proj. Manag.
, vol.58
, pp. 1361-1374
-
-
Vanhoucke, M.1
Vandevoorde, S.2
-
75
-
-
33646009470
-
Using data envelope analysis to compare project efficiency in a multi-project environment
-
Vitner G., Rozenes S., Spraggett S. Using data envelope analysis to compare project efficiency in a multi-project environment. Int. J. Proj. Manag. 2006, 24:323-329.
-
(2006)
Int. J. Proj. Manag.
, vol.24
, pp. 323-329
-
-
Vitner, G.1
Rozenes, S.2
Spraggett, S.3
-
76
-
-
0019612987
-
Project scheduling with continuously-divisible, doubly constrained resources
-
Weglarz J. Project scheduling with continuously-divisible, doubly constrained resources. Manag. Sci. 1981, 27:1040-1053.
-
(1981)
Manag. Sci.
, vol.27
, pp. 1040-1053
-
-
Weglarz, J.1
-
77
-
-
71849110668
-
Modeling and analysis of project performance factors in an extended project-oriented virtual organization (EPROVO)
-
Wi H., Jung M. Modeling and analysis of project performance factors in an extended project-oriented virtual organization (EPROVO). Expert Syst. Appl. 2010, 37:1143-1151.
-
(2010)
Expert Syst. Appl.
, vol.37
, pp. 1143-1151
-
-
Wi, H.1
Jung, M.2
-
78
-
-
0011715339
-
Towards realism in network simulation
-
Williams T. Towards realism in network simulation. Omega 1999, 27:305-314.
-
(1999)
Omega
, vol.27
, pp. 305-314
-
-
Williams, T.1
-
79
-
-
0344441886
-
The contribution of mathematical modelling to the practice of project management
-
Williams T. The contribution of mathematical modelling to the practice of project management. IMA J. Manag. Math. 2003, 14:3-30.
-
(2003)
IMA J. Manag. Math.
, vol.14
, pp. 3-30
-
-
Williams, T.1
-
80
-
-
78650544542
-
The effectiveness of risk management: an analysis of project risk planning across industries and countries
-
Zwikael O., Ahn M. The effectiveness of risk management: an analysis of project risk planning across industries and countries. Risk Anal. 2011, 31:25-37.
-
(2011)
Risk Anal.
, vol.31
, pp. 25-37
-
-
Zwikael, O.1
Ahn, M.2
|