메뉴 건너뛰기




Volumn 21, Issue 2, 2012, Pages 129-143

Project management: Recent developments and research opportunities

Author keywords

opportunities for research; overview; Project management; recent practical developments

Indexed keywords

AGILE METHODS; APPLICATION AREA; BUSINESS APPLICATIONS; BUSINESS PROCESS; CHANGE MANAGEMENT; CRITICAL CHAIN PROJECT MANAGEMENT; NEW APPLICATIONS; NEW PRODUCT; OVERVIEW; PROJECT MANAGEMENT METHODOLOGY; RECENT PRACTICAL DEVELOPMENTS; RESEARCH AND DEVELOPMENT; RESEARCH OPPORTUNITIES; RESEARCH TOPICS;

EID: 84863308988     PISSN: 10043756     EISSN: None     Source Type: Journal    
DOI: 10.1007/s11518-012-5190-5     Document Type: Review
Times cited : (57)

References (44)
  • 5
  • 6
    • 67650045642 scopus 로고    scopus 로고
    • Satisficing measures for analysis of risky positions
    • Brown, D. B. & Sim, M. (2009). Satisficing measures for analysis of risky positions. Management Science, 55: 71-84.
    • (2009) Management Science , vol.55 , pp. 71-84
    • Brown, D.B.1    Sim, M.2
  • 7
    • 84863312743 scopus 로고    scopus 로고
    • Working paper, Department of Systems Engineering and Engineering Management, Chinese University of Hong Kong
    • Cai, X., Hall, N. G. & Zhang, F. (2012). Cooperation and contract design in project management. Working paper, Department of Systems Engineering and Engineering Management, Chinese University of Hong Kong.
    • (2012) Cooperation and contract design in project management
    • Cai, X.1    Hall, N.G.2    Zhang, F.3
  • 8
    • 36349034504 scopus 로고    scopus 로고
    • A polynomial rule for the problem of sharing delay costs in PERT networks
    • Castro, J., Gómez, D. & Tejada, J. (2008). A polynomial rule for the problem of sharing delay costs in PERT networks. Computers & Operations Research, 35: 2376-2387.
    • (2008) Computers & Operations Research , vol.35 , pp. 2376-2387
    • Castro, J.1    Gómez, D.2    Tejada, J.3
  • 11
    • 0035517620 scopus 로고    scopus 로고
    • Technology portfolio management: optimizing interdependent projects over multiple time periods
    • Dickinson, M. W., Thornton, A. C. & Graves, S. (2001). Technology portfolio management: optimizing interdependent projects over multiple time periods. IEEE Transactions on Engineering Management, 48: 518-527.
    • (2001) IEEE Transactions on Engineering Management , vol.48 , pp. 518-527
    • Dickinson, M.W.1    Thornton, A.C.2    Graves, S.3
  • 12
    • 0021458579 scopus 로고
    • Economic models for R&D project selection in the presence of project interactions
    • Fox, G. E., Baker, N. R. & Bryant, L. J. (1984). Economic models for R&D project selection in the presence of project interactions. Management Science, 30: 890-902.
    • (1984) Management Science , vol.30 , pp. 890-902
    • Fox, G.E.1    Baker, N.R.2    Bryant, L.J.3
  • 14
    • 77955897551 scopus 로고    scopus 로고
    • Distributionally robust optimization and its tractable approximations
    • Goh, J. & Sim, M. (2010). Distributionally robust optimization and its tractable approximations. Operations Research, 58: 902-917.
    • (2010) Operations Research , vol.58 , pp. 902-917
    • Goh, J.1    Sim, M.2
  • 15
    • 0003926816 scopus 로고    scopus 로고
    • Great Barrington, MA: North River Press
    • Goldratt, E. M. (1997). The Critical Chain. North River Press, Great Barrington, MA.
    • (1997) The Critical Chain
    • Goldratt, E.M.1
  • 17
    • 0035239263 scopus 로고    scopus 로고
    • Project management under risk: using the real options approach to evaluate exibility in R&D
    • Huchzermeier, A. & Loch, C. H. (2001). Project management under risk: using the real options approach to evaluate exibility in R&D. Management Science, 47: 85-101.
    • (2001) Management Science , vol.47 , pp. 85-101
    • Huchzermeier, A.1    Loch, C.H.2
  • 18
    • 0002553472 scopus 로고
    • On informationally decentralized systems
    • Amsterdam, Netherlands: North-Holland
    • Hurwicz, L. (1972). On informationally decentralized systems. In: McGuire, C. B., Radner, R. (eds.), Decisions and Organization. North-Holland, Amsterdam, Netherlands.
    • (1972) Decisions and Organization
    • Hurwicz, L.1    McGuire, C.B.2    Radner, R.3
  • 21
    • 77956801364 scopus 로고    scopus 로고
    • Berkeley, CA: Department of Civil and Environmental Enginering, University of California at Berkeley
    • Kim, Y. W. & Ballard, G. (2000). Is the earned-value method an enemy of work flow? Working paper, Department of Civil and Environmental Enginering, University of California at Berkeley, Berkeley, CA.
    • (2000) Is the Earned-Value Method an Enemy of Work Flow?
    • Kim, Y.W.1    Ballard, G.2
  • 23
    • 0010395935 scopus 로고    scopus 로고
    • Organizational learning practices in the project management environment
    • Kotnour, T. (2000). Organizational learning practices in the project management environment. International Journal of Quality & Reliability Management, 17: 393-406.
    • (2000) International Journal of Quality & Reliability Management , vol.17 , pp. 393-406
    • Kotnour, T.1
  • 26
    • 0002970608 scopus 로고
    • Incentive compatibility and the bargaining problem
    • Myerson, R. (1979). Incentive compatibility and the bargaining problem. Econometrica, 47: 61-73.
    • (1979) Econometrica , vol.47 , pp. 61-73
    • Myerson, R.1
  • 27
    • 84863303064 scopus 로고    scopus 로고
    • MSDN Blogs, Cited May 19, 2012
    • MSDN Blogs. (2009). Architecture makes agile processes scalable. Available via DIALOG. http://blogs. msdn. com/b/nickmalik/archive/2009/05/19/architecture-makes-agile-processesscalable. aspx. Cited May 19, 2012.
    • (2009) Architecture makes agile processes scalable. Available via DIALOG
  • 33
    • 0036697280 scopus 로고    scopus 로고
    • On uncertainty, ambiguity, and complexity in project management
    • Pich, M. T., Loch, C. H. & De Meyer, A. (2002). On uncertainty, ambiguity, and complexity in project management. Management Science, 48: 1008-1023.
    • (2002) Management Science , vol.48 , pp. 1008-1023
    • Pich, M.T.1    Loch, C.H.2    de Meyer, A.3
  • 35
    • 18144388787 scopus 로고    scopus 로고
    • A critical look at critical chain project management
    • Raz, T., Barnes, R. & Dvir, D. (2003). A critical look at critical chain project management. Project Management Journal, 36: 24-32.
    • (2003) Project Management Journal , vol.36 , pp. 24-32
    • Raz, T.1    Barnes, R.2    Dvir, D.3
  • 36
    • 0001567393 scopus 로고
    • Safety-first and the holding of assets
    • Roy, A. D. (1952). Safety-first and the holding of assets. Econometrica, 20: 431-449.
    • (1952) Econometrica , vol.20 , pp. 431-449
    • Roy, A.D.1
  • 37
    • 84863334113 scopus 로고    scopus 로고
    • Royal Commission on Environmental Pollution
    • Royal Commission on Environmental Pollution. (2007). The urban environment. Available via DIALOG http://www. official-documents. gov. uk/document/cm70/7009/7009. pdf.
    • (2007) The urban environment. Available via DIALOG
  • 38
    • 0037375524 scopus 로고    scopus 로고
    • Harvesting project knowledge: a review of project learning methods and success factors
    • Schindler, M. & Eppler, M. J. (2003). Harvesting project knowledge: a review of project learning methods and success factors. International Journal of Project Management, 21: 219-228.
    • (2003) International Journal of Project Management , vol.21 , pp. 219-228
    • Schindler, M.1    Eppler, M.J.2
  • 39
    • 0038654496 scopus 로고
    • Why projects are always late: a rationale based on manual simulation of a PERT/CPM network
    • Schonberger, R. J. (1981). Why projects are always late: a rationale based on manual simulation of a PERT/CPM network. Interfaces, 11: 66-70.
    • (1981) Interfaces , vol.11 , pp. 66-70
    • Schonberger, R.J.1
  • 44
    • 0008588785 scopus 로고    scopus 로고
    • wwwF, Available via DIALOG
    • wwwF. (2010). Living planet report. Available via DIALOG. http://wwf. panda. org/about_our_earth/all_publications/living_planet_report.
    • (2010) Living planet report


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.