Criticality in resource-constrained networks
-
Bowers J.A. Criticality in resource-constrained networks. J Oper Res Soc 46 1 (1995) 80-91
-
(1995)
J Oper Res Soc
, vol.46
, Issue.1
, pp. 80-91
-
-
Bowers, J.A.1
-
2
-
-
0035279805
-
Project management in construction: software use and research direction
-
Liberatore M.J., Pollack-Johnson B., and Smith C.A. Project management in construction: software use and research direction. J Constr Eng Manage 127 2 (2001) 101-107
-
(2001)
J Constr Eng Manage
, vol.127
, Issue.2
, pp. 101-107
-
-
Liberatore, M.J.1
Pollack-Johnson, B.2
Smith, C.A.3
-
3
-
-
0032042933
-
Resource-constrained project scheduling: A survey of recent developments
-
Herroelen W., De Reyck B., and Demeulemeester E. Resource-constrained project scheduling: A survey of recent developments. Comput Oper Res 25 4 (1998) 279-302
-
(1998)
Comput Oper Res
, vol.25
, Issue.4
, pp. 279-302
-
-
Herroelen, W.1
De Reyck, B.2
Demeulemeester, E.3
-
4
-
-
0000801563
-
An integrated survey of deterministic project scheduling
-
Kolisch R., and Padman R. An integrated survey of deterministic project scheduling. Omega 29 3 (2001) 249-272
-
(2001)
Omega
, vol.29
, Issue.3
, pp. 249-272
-
-
Kolisch, R.1
Padman, R.2
-
5
-
-
0002030301
-
Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis
-
Weglarz J. (Ed), Kluwer Academic Publishers, Boston
-
Kolisch R., and Hartmann S. Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis. In: Weglarz J. (Ed). Project Scheduling: recent models, algorithms and applications (1998), Kluwer Academic Publishers, Boston
-
(1998)
Project Scheduling: recent models, algorithms and applications
-
-
Kolisch, R.1
Hartmann, S.2
-
6
-
-
0001303226
-
Some properties of schedules for large projects with limited resources
-
Wiest J.D. Some properties of schedules for large projects with limited resources. Oper Res 12 3 (1964) 395-428
-
(1964)
Oper Res
, vol.12
, Issue.3
, pp. 395-428
-
-
Wiest, J.D.1
-
7
-
-
0001694940
-
A heuristic model for scheduling large projects with limited resources
-
Wiest J.D. A heuristic model for scheduling large projects with limited resources. Manage Sci 13 6 (1967) b359-b377
-
(1967)
Manage Sci
, vol.13
, Issue.6
-
-
Wiest, J.D.1
-
8
-
-
38249030739
-
Identifying the critical sequence in a resource constrained project
-
Woodworth B.M., and Shanahan S. Identifying the critical sequence in a resource constrained project. Int J Project Manage 6 2 (1988) 89-96
-
(1988)
Int J Project Manage
, vol.6
, Issue.2
, pp. 89-96
-
-
Woodworth, B.M.1
Shanahan, S.2
-
9
-
-
0027147257
-
Resource constrained scheduling within fixed project durations
-
Li R.K.-Y., and Willis R.J. Resource constrained scheduling within fixed project durations. J Oper Res Soc 44 1 (1993) 71-80
-
(1993)
J Oper Res Soc
, vol.44
, Issue.1
, pp. 71-80
-
-
Li, R.K.-Y.1
Willis, R.J.2
-
10
-
-
0030216997
-
Effect of resource constraints on float calculations in project networks
-
Raz T., and Marshall B. Effect of resource constraints on float calculations in project networks. Int J Project Manage 14 4 (1996) 241-248
-
(1996)
Int J Project Manage
, vol.14
, Issue.4
, pp. 241-248
-
-
Raz, T.1
Marshall, B.2
-
11
-
-
0003926816
-
-
The North River Press Publishing Corporation, Great Barrington
-
Goldratt E. Critical chain (1997), The North River Press Publishing Corporation, Great Barrington
-
(1997)
Critical chain
-
-
Goldratt, E.1
-
12
-
-
0034228552
-
Multiple schedules and measures of resource constrained float
-
Bowers J. Multiple schedules and measures of resource constrained float. J Oper Res Soc 51 7 (2000) 855-862
-
(2000)
J Oper Res Soc
, vol.51
, Issue.7
, pp. 855-862
-
-
Bowers, J.1
-
13
-
-
0035392810
-
Tools for resource-constrained project scheduling and control: forward and backward slack analysis
-
Tormos P., and Lova A. Tools for resource-constrained project scheduling and control: forward and backward slack analysis. J Oper Res Soc 52 7 (2001) 779-788
-
(2001)
J Oper Res Soc
, vol.52
, Issue.7
, pp. 779-788
-
-
Tormos, P.1
Lova, A.2
-
14
-
-
0034559445
-
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
-
Lova A., Maroto C., and Tormos P. A multicriteria heuristic method to improve resource allocation in multiproject scheduling. Eur J Oper Res 127 2 (2000) 408-424
-
(2000)
Eur J Oper Res
, vol.127
, Issue.2
, pp. 408-424
-
-
Lova, A.1
Maroto, C.2
Tormos, P.3
-
15
-
-
0026223051
-
The development of the construction engineer: past progress and future problems
-
Fondahl J.W. The development of the construction engineer: past progress and future problems. J Constr Eng Manage 117 3 (1991) 380-392
-
(1991)
J Constr Eng Manage
, vol.117
, Issue.3
, pp. 380-392
-
-
Fondahl, J.W.1
-
16
-
-
13944280651
-
Resource-activity critical-path method for construction planning
-
Lu M., and Li H. Resource-activity critical-path method for construction planning. J Constr Eng Manage 129 4 (2003) 412-420
-
(2003)
J Constr Eng Manage
, vol.129
, Issue.4
, pp. 412-420
-
-
Lu, M.1
Li, H.2
-
17
-
-
0025601132
-
Constraint knowledge for construction scheduling
-
Publ. Institute of Electrical Engineers, London, UK;
-
Waugh LM, Froese TM. Constraint knowledge for construction scheduling. In: IEE Conf. Publ. Institute of Electrical Engineers, London, UK; 1990. p. 114-118.
-
(1990)
IEE Conf
, pp. 114-118
-
-
Waugh, L.M.1
Froese, T.M.2
-
19
-
-
2442545204
-
Critical clouds and critical sets in resource-constrained projects
-
Rivera F.A., and Duran A. Critical clouds and critical sets in resource-constrained projects. Int J Project Manage 22 6 (2004) 489-497
-
(2004)
Int J Project Manage
, vol.22
, Issue.6
, pp. 489-497
-
-
Rivera, F.A.1
Duran, A.2
-
20
-
-
0002385938
-
Resource constrained scheduling capabilities of commercial project management software
-
Johnson R.V. Resource constrained scheduling capabilities of commercial project management software. Project Manage J 22 4 (1992) 39-43
-
(1992)
Project Manage J
, vol.22
, Issue.4
, pp. 39-43
-
-
Johnson, R.V.1
-
21
-
-
38149147048
-
Project Management: An evaluation of software quality
-
Maroto C., and Tormos P. Project Management: An evaluation of software quality. Int Trans Oper Res 1 2 (1994) 209-221
-
(1994)
Int Trans Oper Res
, vol.1
, Issue.2
, pp. 209-221
-
-
Maroto, C.1
Tormos, P.2
-
22
-
-
0040915930
-
Resource levelling with project management software
-
Paper presented at the, Singapore;
-
Burley E. Resource levelling with project management software. In: Paper presented at the INFORMS International Meeting, Singapore; 1995.
-
(1995)
INFORMS International Meeting
-
-
Burley, E.1
-
23
-
-
0009560659
-
Comparative analysis of resource-allocation capabilities of project management software packages
-
Farid F., and Manoharan S. Comparative analysis of resource-allocation capabilities of project management software packages. Project Manage J 24 (1996) 35-44
-
(1996)
Project Manage J
, vol.24
, pp. 35-44
-
-
Farid, F.1
Manoharan, S.2
-
24
-
-
0001787824
-
The evolution of software quality in project scheduling
-
Weglarz J. (Ed), Kluwer Academic Publishers, Boston
-
Maroto C., Tormos P., and Lova A. The evolution of software quality in project scheduling. In: Weglarz J. (Ed). Project scheduling-recent models, algorithms and applications (1998), Kluwer Academic Publishers, Boston
-
(1998)
Project scheduling-recent models, algorithms and applications
-
-
Maroto, C.1
Tormos, P.2
Lova, A.3
-
25
-
-
0038937965
-
Resource allocation capabilities of commercial project management software packages
-
Kolisch R. Resource allocation capabilities of commercial project management software packages. Interfaces 29 4 (1999) 19-31
-
(1999)
Interfaces
, vol.29
, Issue.4
, pp. 19-31
-
-
Kolisch, R.1
-
26
-
-
0021460636
-
A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
-
Patterson J.H. A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. IIE Trans 30 7 (1984) 854-867
-
(1984)
IIE Trans
, vol.30
, Issue.7
, pp. 854-867
-
-
Patterson, J.H.1
-
27
-
-
0002907360
-
A branch and bound procedure for the multiple resource-constrained project scheduling problem
-
Demeulemeester E., and Herroelen W. A branch and bound procedure for the multiple resource-constrained project scheduling problem. Manage Sci 38 12 (1992) 1803-1817
-
(1992)
Manage Sci
, vol.38
, Issue.12
, pp. 1803-1817
-
-
Demeulemeester, E.1
Herroelen, W.2
-
28
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch R., Sprecher A., and Drexl A. Characterization and generation of a general class of resource-constrained project scheduling problems. Manage Sci 41 10 (1995) 1693-1703
-
(1995)
Manage Sci
, vol.41
, Issue.10
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
29
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems
-
Talbot F.B., and Patterson J.H. An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems. Manage Sci 24 11 (1978) 1163-1174
-
(1978)
Manage Sci
, vol.24
, Issue.11
, pp. 1163-1174
-
-
Talbot, F.B.1
Patterson, J.H.2
-
30
-
-
0016935106
-
Project scheduling: the effects of problem structure on heuristic performance
-
Patterson J.H. Project scheduling: the effects of problem structure on heuristic performance. Naval Res Logist Quart 23 1 (1976) 95-123
-
(1976)
Naval Res Logist Quart
, vol.23
, Issue.1
, pp. 95-123
-
-
Patterson, J.H.1
-
31
-
-
0002907360
-
A branch and bound procedure for the multiple resource constrained projects scheduling problem
-
Demeulemeester E., and Kolisch. A branch and bound procedure for the multiple resource constrained projects scheduling problem. Manage Sci 38 12 (1992) 1803-1818
-
(1992)
Manage Sci
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.1
Kolisch2
-
32
-
-
12144278410
-
Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment
-
Herroelen W., and Leus R. Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment. J Oper Res Soc 56 (2005) 102-109
-
(2005)
J Oper Res Soc
, vol.56
, pp. 102-109
-
-
Herroelen, W.1
Leus, R.2
|