-
1
-
-
0003267827
-
Is construction project planning really doing its job? A critical examination of focus, role and process
-
winter, ISSN 0144-6193
-
Laufer A., Tucker R.L. Is construction project planning really doing its job? A critical examination of focus, role and process. Construction Management & Economics. 5(3):winter 1987;. ISSN 0144-6193.
-
(1987)
Construction Management & Economics
, vol.5
, Issue.3
-
-
Laufer, A.1
Tucker, R.L.2
-
3
-
-
0011469575
-
An automated model for generating a short-interval schedule
-
May 30-June 3, 1999, Vancouver, Canada
-
Waly A.F., Thabet W.Y., Wakefield R. An automated model for generating a short-interval schedule. Proceedings of 8DBMC Conference and CIB W78 Workshop, May 30-June 3, 1999, Vancouver, Canada. 1999;2386-2392.
-
(1999)
Proceedings of 8DBMC Conference and CIB W78 Workshop
, pp. 2386-2392
-
-
Waly, A.F.1
Thabet, W.Y.2
Wakefield, R.3
-
5
-
-
0023440167
-
Expert system for construction planning
-
Hendrickson C., Zozoya-Gorostiza C., Rehak D., Baracco-Miller E., Lim P. Expert system for construction planning. Journal of Computing in Civil Engineering. 1(4):1987;253-269.
-
(1987)
Journal of Computing in Civil Engineering
, vol.1
, Issue.4
, pp. 253-269
-
-
Hendrickson, C.1
Zozoya-Gorostiza, C.2
Rehak, D.3
Baracco-Miller, E.4
Lim, P.5
-
6
-
-
84974449619
-
OARPLAN: Generating project plans by reasoning about objects, actions, and resources
-
Darwiche A., Levitt R.E., Hayes-Roth B. OARPLAN: generating project plans by reasoning about objects, actions, and resources. AI EDAM. 2(3):1988;169-181.
-
(1988)
AI EDAM
, vol.2
, Issue.3
, pp. 169-181
-
-
Darwiche, A.1
Levitt, R.E.2
Hayes-Roth, B.3
-
9
-
-
0011508168
-
-
PhD dissertation, Virginia Tech, Blacksburg, VA
-
W.Y. Thabet, A space-constrained resource-constrained scheduling system for multi-story buildings, PhD dissertation, Virginia Tech, Blacksburg, VA, 1992.
-
(1992)
A space-constrained resource-constrained scheduling system for multi-story buildings
-
-
Thabet, W.Y.1
-
13
-
-
0031633334
-
4D annotator: A visual decision support tool for construction planners
-
Boston, MA, USA
-
McKinney K., Fischer M., Kunz J. 4D annotator: a visual decision support tool for construction planners. Proceedings of the 1998 International Computing Congress on Computing in Civil Engineering, Boston, MA, USA. 1998;331-341.
-
(1998)
Proceedings of the 1998 International Computing Congress on Computing in Civil Engineering
, pp. 331-341
-
-
McKinney, K.1
Fischer, M.2
Kunz, J.3
-
14
-
-
0032165225
-
Generating, evaluation, and visualizing construction schedules with CAD tools
-
McKinney K., Fischer M. Generating, evaluation, and visualizing construction schedules with CAD tools. Journal of Automation in Construction. 7:1998;433-447.
-
(1998)
Journal of Automation in Construction
, vol.7
, pp. 433-447
-
-
McKinney, K.1
Fischer, M.2
-
17
-
-
0028517808
-
MDA planner: Interactive planning tool using product models and construction methods
-
Jagbeck A. MDA planner: interactive planning tool using product models and construction methods. Journal of Computing in Civil Engineering. 8(4):1994;536-554.
-
(1994)
Journal of Computing in Civil Engineering
, vol.8
, Issue.4
, pp. 536-554
-
-
Jagbeck, A.1
-
21
-
-
0011425168
-
Virtual construction for constructability improvement
-
Civil Comp., September 13-15, 1999, Oxford, England
-
Waly A.F., Thabet W.Y., Beliveau Y.J. Virtual construction for constructability improvement. The Fifth International Conference on the Application of Artificial Intelligence, Civil Comp., September 13-15, 1999, Oxford, England:1999;71-76.
-
(1999)
The Fifth International Conference on the Application of Artificial Intelligence
, pp. 71-76
-
-
Waly, A.F.1
Thabet, W.Y.2
Beliveau, Y.J.3
-
22
-
-
0030196033
-
Examples and characteristics of shared project models
-
July
-
Fischer M., Froese T. Examples and characteristics of shared project models. Journal of Computing in Civil Engineering. 10(3):July, 1996;536-554.
-
(1996)
Journal of Computing in Civil Engineering
, vol.10
, Issue.3
, pp. 536-554
-
-
Fischer, M.1
Froese, T.2
-
23
-
-
0011467512
-
-
accessed on 7/29/00
-
URL: http://www.sv.vt.edu/future/vt-cave/whatis/ (accessed on 7/29/00).
-
-
-
|