Volumn 24, Issue 4, 2010, Pages 379-388

Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation

Author keywords

Constraint based simulation; Construction method; Monte Carlo method; Process pattern; Schedule generation

Indexed keywords

3D MODELS; BRIDGE CONSTRUCTIONS; BUILDING ELEMENT; CONSTRAINT MODULE; CONSTRAINT-BASED; CONSTRUCTION METHOD; CONSTRUCTION SCHEDULES; CONSTRUCTION WORKS; ERROR PRONES; INPUT DATAS; LEVEL-OF-DETAIL; MANPOWER RESOURCES; MANUFACTURING INDUSTRIES; NOVEL METHODOLOGY; PRE-REQUISITES; PROCESS CHAIN; PROCESS MODEL; PROCESS PATTERNS; PRODUCT MODELS; SCHEDULE GENERATION; SCHEDULING SOFTWARE; TIME SCHEDULES;

EID: 77957282618     PISSN: 14740346     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.aei.2010.07.002     Document Type: Conference Paper
Times cited : (74)

References (35)
  • 2
    • 0003880227 scopus 로고
    • A simulation approach to the selection of construction equipment
    • Stanford University, Palo Alto, CA
    • P. Teicholz, A simulation approach to the selection of construction equipment, Technical Report 26, Construction Institute, Stanford University, Palo Alto, CA, 1963.
    • (1963) Technical Report 26, Construction Institute
    • Teicholz, P.1
  • 3
    • 0342949301 scopus 로고
    • Stochastic models to estimate the production of material handling systems in the construction industry
    • Stanford University, Stanford, CA
    • A. Gaarslev, Stochastic models to estimate the production of material handling systems in the construction industry, Technical Report No. 1 (11), Department of Civil Engineering, Stanford University, Stanford, CA, 1969.
    • (1969) Technical Report No. 1 (11), Department of Civil Engineering
    • Gaarslev, A.1
  • 4
    • 0015315831 scopus 로고
    • Estimating costs of earthwork via simulation
    • American Society of Civil Engineers
    • J. Willenbrock, Estimating costs of earthwork via simulation. Journal of the Construction Division, American Society of Civil Engineers 98 (1972).
    • (1972) Journal of the Construction Division , vol.98
    • Willenbrock, J.1
  • 5
    • 0017539255 scopus 로고
    • CYCLONE - Method for modeling job site processes
    • D.W. Halpin CYCLONE - method for modeling job site processes Journal of the Construction Division 103 3 1977 489 499
    • (1977) Journal of the Construction Division , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 8
    • 0039797035 scopus 로고
    • Division of Construction Engineering and Management, Purdue University, West Lafayette, Indian
    • D.W. Halpin, MicroCYCLONE User's Manual, Division of Construction Engineering and Management, Purdue University, West Lafayette, Indian, 1990.
    • (1990) MicroCYCLONE User's Manual
    • Halpin, D.W.1
  • 9
    • 0028137930 scopus 로고
    • Visual construction operation simulation: The DISCO approach
    • R. Huang, and D.W. Halpin Visual construction operation simulation: the DISCO approach Microcomputers in Civil Engineering 9 6 1994 175 184
    • (1994) Microcomputers in Civil Engineering , vol.9 , Issue.6 , pp. 175-184
    • Huang, R.1    Halpin, D.W.2
  • 11
    • 0041304359 scopus 로고    scopus 로고
    • Unified modeling methodology for construction simulation
    • DOI 10.1061/(ASCE)0733-9364(2002)128:2(1)
    • D. Hajjar, and S. AbouRizk Unified modeling methodology for construction simulation Journal of Construction Engineering and Management 128 2 2002 174 185 (Pubitemid 40265565)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.2 , pp. 174-185
    • Hajjar, D.1    AbouRizk, S.M.2
  • 12
    • 0037118776 scopus 로고    scopus 로고
    • Optimization with simulation and multiobjective analysis in industrial decision-making: A case study
    • DOI 10.1016/S0377-2217(02)00075-9, PII S0377221702000759
    • L. Alberto, C. Azcarate, F. Mallor, and P.M. Mateo Optimization with simulation and multi-objective analysis in industrial decision-making: a case study European Journal of Operational Research 140 2 2002 373 383 (Pubitemid 34435039)
    • (2002) European Journal of Operational Research , vol.140 , Issue.2 , pp. 373-383
    • Alberto, I.1    Azcarate, C.2    Mallor, F.3    Mateo, P.M.4
  • 14
    • 1642602943 scopus 로고    scopus 로고
    • Simulation-based optimization for dynamic resource allocation
    • H. Zhang, and H. Li Simulation-based optimization for dynamic resource allocation Automation in Construction 13 3 2004 407 418
    • (2004) Automation in Construction , vol.13 , Issue.3 , pp. 407-418
    • Zhang, H.1    Li, H.2
  • 15
    • 0032158042 scopus 로고    scopus 로고
    • Simulation optimisation using a genetic algorithm
    • DOI 10.1016/S0928-4869(98)00007-X, PII S092848699800007X
    • R.J. Paul, and T.S. Chanev Simulation optimization using a genetic algorithm Simulation Practice and Theory 6 6 1998 601 611 (Pubitemid 44933135)
    • (1998) Simulation Practice and Theory , vol.6 , Issue.6 , pp. 601-611
    • Paul, R.J.1    Chanev, T.S.2
  • 16
    • 0031221996 scopus 로고    scopus 로고
    • Optimizing discrete stochastic systems using simulated annealing and simulation
    • PII S0360835297000065
    • M.A. Ahmed, T.M. Alkhamis, and M. Hasan Optimizing discrete stochastic systems using simulated annealing and simulation Computers and Industrial Engineering 32 4 1997 832 836 (Pubitemid 127424623)
    • (1997) Computers and Industrial Engineering , vol.32 , Issue.4 , pp. 823-836
    • Ahmed, M.A.1    Alkhamis, T.M.2    Hasan, M.3
  • 17
    • 33751276778 scopus 로고    scopus 로고
    • Particle swarm optimization-supported simulation for construction operations
    • DOI 10.1061/(ASCE)0733-9364(2006)132:12(1267), 009612QCO
    • H. Zhang, C.M. Tam, H. Li, and J.J. Shi Particle swarm optimization-supported simulation for construction operations Journal of Construction Engineering and Management 132 12 2006 1267 1274 (Pubitemid 44794266)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.12 , pp. 1267-1274
    • Zhang, H.1    Tam, C.M.2    Li, H.3    Shi, J.J.4
  • 18
    • 41749098857 scopus 로고    scopus 로고
    • Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization
    • M. Lu, H.-C. Lam, and F. Dai Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization Automation in Construction 17 6 2008 670 681
    • (2008) Automation in Construction , vol.17 , Issue.6 , pp. 670-681
    • Lu, M.1    Lam, H.-C.2    Dai, F.3
  • 19
    • 77957280201 scopus 로고    scopus 로고
    • Constraint-Based Simulation of Outfitting Processes in Building Engineering
    • Maribor, Slovenia
    • U. Beißert, M. König, H.-J. Bargstädt, Constraint-Based Simulation of Outfitting Processes in Building Engineering, in: Proceedings of CIB w78 Conference, Maribor, Slovenia, 2007.
    • (2007) Proceedings of CIB w78 Conference
    • Beißert, U.1
  • 23
    • 0034322953 scopus 로고    scopus 로고
    • Simplifying simulation modeling through integration with 3D CAD
    • DOI 10.1061/(ASCE)0733-9364(2000)126:6(475)
    • S. AbouRizk, and K. Mather Simplifying simulation modeling through integration with 3D CAD Journal of Construction Engineering and Management 126 6 2000 475 483 (Pubitemid 32022001)
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.6 , pp. 475-483
    • AbouRizk, S.1    Mather, K.2
  • 25
    • 3142565144 scopus 로고    scopus 로고
    • 4D dynamic management for construction planning and resource utilization
    • H.J. Wang, J.P. Zhang, K.W. Chau, and M. Anson 4D dynamic management for construction planning and resource utilization Automation in Construction 13 5 2004 575 589
    • (2004) Automation in Construction , vol.13 , Issue.5 , pp. 575-589
    • Wang, H.J.1    Zhang, J.P.2    Chau, K.W.3    Anson, M.4
  • 26
    • 0000693991 scopus 로고    scopus 로고
    • Scheduling with computer-interpretable construction method models
    • M. Fischer, and F. Aalami Scheduling with computer-interpretable construction method models Journal of Construction Engineering and Management 122 4 1996 337 347 (Pubitemid 126567114)
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.4 , pp. 337-347
    • Fischer, M.A.1    Aalami, F.2
  • 27
    • 34147170085 scopus 로고    scopus 로고
    • Simulation study on construction process of FRP bridge deck panels
    • DOI 10.1016/j.autcon.2006.10.004, PII S0926580506001105
    • T. Hong, and M. Hastak Simulation study on construction process of FRP bridge deck panels Journal of Automation in Construction 16 5 2007 620 631 (Pubitemid 46575191)
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 620-631
    • Hong, T.1    Hastak, M.2
  • 28
    • 33847335678 scopus 로고    scopus 로고
    • Cell-based representation and analysis of spatial resources in construction simulation
    • DOI 10.1016/j.autcon.2006.07.009, PII S0926580506000781
    • C. Zhang, A. Hammad, T.M. Zayed, G. Wainer, and H. Pang Cell-based representation and analysis of spatial resources in construction simulation Automation in Construction 16 4 2007 436 448 (Pubitemid 46321513)
    • (2007) Automation in Construction , vol.16 , Issue.4 , pp. 436-448
    • Zhang, C.1    Hammad, A.2    Zayed, T.M.3    Wainer, G.4    Pang, H.5
  • 29
    • 63549124746 scopus 로고    scopus 로고
    • Application of computer simulation to bridge deck construction: Case study
    • H. Said, M. Marzouk, and M. El-Said Application of computer simulation to bridge deck construction: case study Automation in Construction 18 4 2009 377 385
    • (2009) Automation in Construction , vol.18 , Issue.4 , pp. 377-385
    • Said, H.1    Marzouk, M.2    El-Said, M.3
  • 30
    • 0042889335 scopus 로고    scopus 로고
    • N-an agent-based negotiation algorithm for dynamic scheduling and rescheduling
    • H.W. Chun, and R.Y.M. Wong N-an agent-based negotiation algorithm for dynamic scheduling and rescheduling Advanced Engineering Informatics 17 1 2003 1 22
    • (2003) Advanced Engineering Informatics , vol.17 , Issue.1 , pp. 1-22
    • Chun, H.W.1    Wong, R.Y.M.2
  • 31
    • 13844281795 scopus 로고    scopus 로고
    • Inter-agent cooperation and communication for agent-based robust dynamic scheduling in steel production
    • DOI 10.1016/j.aei.2004.10.003, PII S1474034604000370
    • D. Ouelhadja, S. Petrovica, P.I. Cowling, and A. Meisels Inter-agent cooperation and communication for agent-based robust dynamic scheduling in steel production Advanced Engineering Informatics 18 3 2004 161 172 (Pubitemid 40253379)
    • (2004) Advanced Engineering Informatics , vol.18 , Issue.3 , pp. 161-172
    • Ouelhadj, D.1    Petrovic, S.2    Cowling, P.I.3    Meisels, A.4
  • 32
    • 57549090622 scopus 로고    scopus 로고
    • A formal mapping-based approach for distributed schedule coordination on projects
    • M.K. Siddiqui, and W.J. O'Brien A formal mapping-based approach for distributed schedule coordination on projects Advanced Engineering Informatics 23 1 2009 104 115
    • (2009) Advanced Engineering Informatics , vol.23 , Issue.1 , pp. 104-115
    • Siddiqui, M.K.1    O'Brien, W.J.2
  • 34
    • 77949351113 scopus 로고    scopus 로고
    • Constraint-based simulation of outfitting processes in shipbuilding and civil engineering
    • Ljubljana, Slovenia
    • M. König, U. Beißert, D. Steinhauer, H.-J. Bargstädt, Constraint-based simulation of outfitting processes in shipbuilding and civil engineering, in: Proceedings of the Sixth EUROSIM Congress on Modeling and Simulation, Ljubljana, Slovenia, 2007.
    • (2007) Proceedings of the Sixth EUROSIM Congress on Modeling and Simulation
    • König, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.