A simulation approach to the selection of construction equipment
-
Stanford University, Palo Alto, CA
-
P. Teicholz, A simulation approach to the selection of construction equipment, Technical Report 26, Construction Institute, Stanford University, Palo Alto, CA, 1963.
-
(1963)
Technical Report 26, Construction Institute
-
-
Teicholz, P.1
-
3
-
-
0342949301
-
Stochastic models to estimate the production of material handling systems in the construction industry
-
Stanford University, Stanford, CA
-
A. Gaarslev, Stochastic models to estimate the production of material handling systems in the construction industry, Technical Report No. 1 (11), Department of Civil Engineering, Stanford University, Stanford, CA, 1969.
-
(1969)
Technical Report No. 1 (11), Department of Civil Engineering
-
-
Gaarslev, A.1
-
4
-
-
0015315831
-
Estimating costs of earthwork via simulation
-
American Society of Civil Engineers
-
J. Willenbrock, Estimating costs of earthwork via simulation. Journal of the Construction Division, American Society of Civil Engineers 98 (1972).
-
(1972)
Journal of the Construction Division
, vol.98
-
-
Willenbrock, J.1
-
5
-
-
0017539255
-
CYCLONE - Method for modeling job site processes
-
D.W. Halpin CYCLONE - method for modeling job site processes Journal of the Construction Division 103 3 1977 489 499
-
(1977)
Journal of the Construction Division
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
6
-
-
0021479871
-
The use of simulation models in
-
ICE, London
-
R. Pilcher, I. Flood, The use of simulation models in construction, in: Proceedings of Institution of Civil engineers, Part 1, Design and Construction, ICE, London, vol. 76, 1984.
-
(1984)
Proceedings of Institution of Civil Engineers, Part 1, Design and Construction
, vol.76
-
-
Pilcher, R.1
Flood, I.2
-
8
-
-
0039797035
-
-
Division of Construction Engineering and Management, Purdue University, West Lafayette, Indian
-
D.W. Halpin, MicroCYCLONE User's Manual, Division of Construction Engineering and Management, Purdue University, West Lafayette, Indian, 1990.
-
(1990)
MicroCYCLONE User's Manual
-
-
Halpin, D.W.1
-
9
-
-
0028137930
-
Visual construction operation simulation: The DISCO approach
-
R. Huang, and D.W. Halpin Visual construction operation simulation: the DISCO approach Microcomputers in Civil Engineering 9 6 1994 175 184
-
(1994)
Microcomputers in Civil Engineering
, vol.9
, Issue.6
, pp. 175-184
-
-
Huang, R.1
Halpin, D.W.2
-
10
-
-
0028741632
-
General purpose simulation with stroboscope
-
Orlando, FL, United States
-
J.C. Martinez, G.P. Ioannou, General purpose simulation with stroboscope, in: Proceedings of the 1994 Winter Simulation Conference, Orlando, FL, United States, 1994.
-
(1994)
Proceedings of the 1994 Winter Simulation Conference
-
-
Martinez, J.C.1
Ioannou, G.P.2
-
11
-
-
0041304359
-
Unified modeling methodology for construction simulation
-
DOI 10.1061/(ASCE)0733-9364(2002)128:2(1)
-
D. Hajjar, and S. AbouRizk Unified modeling methodology for construction simulation Journal of Construction Engineering and Management 128 2 2002 174 185 (Pubitemid 40265565)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.2
, pp. 174-185
-
-
Hajjar, D.1
AbouRizk, S.M.2
-
12
-
-
0037118776
-
Optimization with simulation and multiobjective analysis in industrial decision-making: A case study
-
DOI 10.1016/S0377-2217(02)00075-9, PII S0377221702000759
-
L. Alberto, C. Azcarate, F. Mallor, and P.M. Mateo Optimization with simulation and multi-objective analysis in industrial decision-making: a case study European Journal of Operational Research 140 2 2002 373 383 (Pubitemid 34435039)
-
(2002)
European Journal of Operational Research
, vol.140
, Issue.2
, pp. 373-383
-
-
Alberto, I.1
Azcarate, C.2
Mallor, F.3
Mateo, P.M.4
-
13
-
-
0030418937
-
New advances and applications of combining simulation and optimization
-
Piscataway, NJ, United States
-
F. Glover, J.P. Kelly, M. Laguna, New advances and applications of combining simulation and optimization, in: Proceedings of the 1996 Winter Simulation Conference, Piscataway, NJ, United States, 1996.
-
(1996)
Proceedings of the 1996 Winter Simulation Conference
-
-
Glover, F.1
Kelly, J.P.2
Laguna, M.3
-
14
-
-
1642602943
-
Simulation-based optimization for dynamic resource allocation
-
H. Zhang, and H. Li Simulation-based optimization for dynamic resource allocation Automation in Construction 13 3 2004 407 418
-
(2004)
Automation in Construction
, vol.13
, Issue.3
, pp. 407-418
-
-
Zhang, H.1
Li, H.2
-
15
-
-
0032158042
-
Simulation optimisation using a genetic algorithm
-
DOI 10.1016/S0928-4869(98)00007-X, PII S092848699800007X
-
R.J. Paul, and T.S. Chanev Simulation optimization using a genetic algorithm Simulation Practice and Theory 6 6 1998 601 611 (Pubitemid 44933135)
-
(1998)
Simulation Practice and Theory
, vol.6
, Issue.6
, pp. 601-611
-
-
Paul, R.J.1
Chanev, T.S.2
-
16
-
-
0031221996
-
Optimizing discrete stochastic systems using simulated annealing and simulation
-
PII S0360835297000065
-
M.A. Ahmed, T.M. Alkhamis, and M. Hasan Optimizing discrete stochastic systems using simulated annealing and simulation Computers and Industrial Engineering 32 4 1997 832 836 (Pubitemid 127424623)
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.4
, pp. 823-836
-
-
Ahmed, M.A.1
Alkhamis, T.M.2
Hasan, M.3
-
17
-
-
33751276778
-
Particle swarm optimization-supported simulation for construction operations
-
DOI 10.1061/(ASCE)0733-9364(2006)132:12(1267), 009612QCO
-
H. Zhang, C.M. Tam, H. Li, and J.J. Shi Particle swarm optimization-supported simulation for construction operations Journal of Construction Engineering and Management 132 12 2006 1267 1274 (Pubitemid 44794266)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.12
, pp. 1267-1274
-
-
Zhang, H.1
Tam, C.M.2
Li, H.3
Shi, J.J.4
-
18
-
-
41749098857
-
Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization
-
M. Lu, H.-C. Lam, and F. Dai Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization Automation in Construction 17 6 2008 670 681
-
(2008)
Automation in Construction
, vol.17
, Issue.6
, pp. 670-681
-
-
Lu, M.1
Lam, H.-C.2
Dai, F.3
-
19
-
-
77957280201
-
Constraint-Based Simulation of Outfitting Processes in Building Engineering
-
Maribor, Slovenia
-
U. Beißert, M. König, H.-J. Bargstädt, Constraint-Based Simulation of Outfitting Processes in Building Engineering, in: Proceedings of CIB w78 Conference, Maribor, Slovenia, 2007.
-
(2007)
Proceedings of CIB w78 Conference
-
-
Beißert, U.1
-
20
-
-
77957285665
-
Execution strategy investigation using soft constraint-based simulation
-
Helsinki, Finland
-
U. Beißert, M. König, H.-J. Bargstädt, Execution strategy investigation using soft constraint-based simulation, in: Proceedings of the IABSE Conference, Information and Communication Technology (ICT) for Bridges, Buildings and Construction Practice, Helsinki, Finland, 2008.
-
(2008)
Proceedings of the IABSE Conference, Information and Communication Technology (ICT) for Bridges, Buildings and Construction Practice
-
-
Beißert, U.1
-
23
-
-
0034322953
-
Simplifying simulation modeling through integration with 3D CAD
-
DOI 10.1061/(ASCE)0733-9364(2000)126:6(475)
-
S. AbouRizk, and K. Mather Simplifying simulation modeling through integration with 3D CAD Journal of Construction Engineering and Management 126 6 2000 475 483 (Pubitemid 32022001)
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.6
, pp. 475-483
-
-
AbouRizk, S.1
Mather, K.2
-
25
-
-
3142565144
-
4D dynamic management for construction planning and resource utilization
-
H.J. Wang, J.P. Zhang, K.W. Chau, and M. Anson 4D dynamic management for construction planning and resource utilization Automation in Construction 13 5 2004 575 589
-
(2004)
Automation in Construction
, vol.13
, Issue.5
, pp. 575-589
-
-
Wang, H.J.1
Zhang, J.P.2
Chau, K.W.3
Anson, M.4
-
26
-
-
0000693991
-
Scheduling with computer-interpretable construction method models
-
M. Fischer, and F. Aalami Scheduling with computer-interpretable construction method models Journal of Construction Engineering and Management 122 4 1996 337 347 (Pubitemid 126567114)
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, Issue.4
, pp. 337-347
-
-
Fischer, M.A.1
Aalami, F.2
-
27
-
-
34147170085
-
Simulation study on construction process of FRP bridge deck panels
-
DOI 10.1016/j.autcon.2006.10.004, PII S0926580506001105
-
T. Hong, and M. Hastak Simulation study on construction process of FRP bridge deck panels Journal of Automation in Construction 16 5 2007 620 631 (Pubitemid 46575191)
-
(2007)
Automation in Construction
, vol.16
, Issue.5
, pp. 620-631
-
-
Hong, T.1
Hastak, M.2
-
28
-
-
33847335678
-
Cell-based representation and analysis of spatial resources in construction simulation
-
DOI 10.1016/j.autcon.2006.07.009, PII S0926580506000781
-
C. Zhang, A. Hammad, T.M. Zayed, G. Wainer, and H. Pang Cell-based representation and analysis of spatial resources in construction simulation Automation in Construction 16 4 2007 436 448 (Pubitemid 46321513)
-
(2007)
Automation in Construction
, vol.16
, Issue.4
, pp. 436-448
-
-
Zhang, C.1
Hammad, A.2
Zayed, T.M.3
Wainer, G.4
Pang, H.5
-
29
-
-
63549124746
-
Application of computer simulation to bridge deck construction: Case study
-
H. Said, M. Marzouk, and M. El-Said Application of computer simulation to bridge deck construction: case study Automation in Construction 18 4 2009 377 385
-
(2009)
Automation in Construction
, vol.18
, Issue.4
, pp. 377-385
-
-
Said, H.1
Marzouk, M.2
El-Said, M.3
-
30
-
-
0042889335
-
N-an agent-based negotiation algorithm for dynamic scheduling and rescheduling
-
H.W. Chun, and R.Y.M. Wong N-an agent-based negotiation algorithm for dynamic scheduling and rescheduling Advanced Engineering Informatics 17 1 2003 1 22
-
(2003)
Advanced Engineering Informatics
, vol.17
, Issue.1
, pp. 1-22
-
-
Chun, H.W.1
Wong, R.Y.M.2
-
31
-
-
13844281795
-
Inter-agent cooperation and communication for agent-based robust dynamic scheduling in steel production
-
DOI 10.1016/j.aei.2004.10.003, PII S1474034604000370
-
D. Ouelhadja, S. Petrovica, P.I. Cowling, and A. Meisels Inter-agent cooperation and communication for agent-based robust dynamic scheduling in steel production Advanced Engineering Informatics 18 3 2004 161 172 (Pubitemid 40253379)
-
(2004)
Advanced Engineering Informatics
, vol.18
, Issue.3
, pp. 161-172
-
-
Ouelhadj, D.1
Petrovic, S.2
Cowling, P.I.3
Meisels, A.4
-
32
-
-
57549090622
-
A formal mapping-based approach for distributed schedule coordination on projects
-
M.K. Siddiqui, and W.J. O'Brien A formal mapping-based approach for distributed schedule coordination on projects Advanced Engineering Informatics 23 1 2009 104 115
-
(2009)
Advanced Engineering Informatics
, vol.23
, Issue.1
, pp. 104-115
-
-
Siddiqui, M.K.1
O'Brien, W.J.2
-
34
-
-
77949351113
-
Constraint-based simulation of outfitting processes in shipbuilding and civil engineering
-
Ljubljana, Slovenia
-
M. König, U. Beißert, D. Steinhauer, H.-J. Bargstädt, Constraint-based simulation of outfitting processes in shipbuilding and civil engineering, in: Proceedings of the Sixth EUROSIM Congress on Modeling and Simulation, Ljubljana, Slovenia, 2007.
-
(2007)
Proceedings of the Sixth EUROSIM Congress on Modeling and Simulation
-
-
König, M.1
|