메뉴 건너뛰기




Volumn 26, Issue 9, 2008, Pages 991-1000

Using the IKEA model and virtual prototyping technology to improve construction process management

Author keywords

IKEA model; Site operations; Virtual prototyping

Indexed keywords

CONSTRUCTION INDUSTRY; INDUSTRIAL ENGINEERING;

EID: 53349108776     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190802290477     Document Type: Article
Times cited : (23)

References (30)
  • 3
    • 33750377971 scopus 로고    scopus 로고
    • The experimental roots of revolutionary vision
    • Barthelemy, J. (2006) The experimental roots of revolutionary vision. MIT Sloan Management Review, 3, pp. 81-84.
    • (2006) MIT Sloan Management Review , vol.3 , pp. 81-84
    • Barthelemy, J.1
  • 4
    • 84993047600 scopus 로고    scopus 로고
    • Understanding the diffusion and application of new management ideas in construction
    • Bresnen, M. and Marshall, N. (2001) Understanding the diffusion and application of new management ideas in construction. Engineering, Construction and Architectural Management, 56, pp. 335-345.
    • (2001) Engineering, Construction and Architectural Management , vol.56 , pp. 335-345
    • Bresnen, M.1    Marshall, N.2
  • 5
    • 84900550373 scopus 로고    scopus 로고
    • Electronic commerce to support construction design and supply-chain management: A research note
    • Elliman, T. and Orange, G. (2000) Electronic commerce to support construction design and supply-chain management: A research note. International Journal of Physical Distribution and Logistics Management, 30:34, pp. 345-352.
    • (2000) International Journal of Physical Distribution and Logistics Management , vol.30 , Issue.34 , pp. 345-352
    • Elliman, T.1    Orange, G.2
  • 6
    • 84992933843 scopus 로고    scopus 로고
    • The technocratic totalitarianism of construction process improvement: A critical perspective
    • Green, S. D. (1998) The technocratic totalitarianism of construction process improvement: A critical perspective. Engineering, Construction and Architectural Management, 5, pp. 376-386.
    • (1998) Engineering, Construction and Architectural Management , vol.5 , pp. 376-386
    • Green, S.D.1
  • 8
    • 34147115212 scopus 로고    scopus 로고
    • A virtual prototyping system for simulating construction processes
    • Huang, T., Kong, C. W., Guo, H. L., Baldwin, A. and Li, H. (2007) A virtual prototyping system for simulating construction processes. Automation in Construction, 16:5, pp. 576-585.
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 576-585
    • Huang, T.1    Kong, C.W.2    Guo, H.L.3    Baldwin, A.4    Li, H.5
  • 14
    • 0001187120 scopus 로고    scopus 로고
    • Determining the causal structure of rework influence in construction
    • Love, P., Pundal, M. and Li, H. (1999) Determining the causal structure of rework influence in construction. Construction Management and Economics, 17:4, pp. 505-517.
    • (1999) Construction Management and Economics , vol.17 , Issue.4 , pp. 505-517
    • Love, P.1    Pundal, M.2    Li, H.3
  • 15
    • 2342559104 scopus 로고    scopus 로고
    • A seamless supply chain management model for construction supply chain management
    • Love, P. E. D., Irani, Z. and Edwards, D. J. (2004) A seamless supply chain management model for construction supply chain management. Supply Chain Management, 9:1, pp. 43-56.
    • (2004) Supply Chain Management , vol.9 , Issue.1 , pp. 43-56
    • Love, P.E.D.1    Irani, Z.2    Edwards, D.J.3
  • 16
    • 0345296554 scopus 로고
    • Design for logistics (DFL): The next challenge for designers
    • Mather, H. (1992) Design for logistics (DFL): The next challenge for designers. Production and Inventory Management Journal, 33:1, pp. 7-10.
    • (1992) Production and Inventory Management Journal , vol.33 , Issue.1 , pp. 7-10
    • Mather, H.1
  • 17
    • 0142025004 scopus 로고    scopus 로고
    • Dynamic change management for construction: Introducing the change cycle into model-based project management
    • Park, M. and Pena-Mora, F. (2003) Dynamic change management for construction: Introducing the change cycle into model-based project management. System Dynamics Review, 19, pp. 213-242.
    • (2003) System Dynamics Review , vol.19 , pp. 213-242
    • Park, M.1    Pena-Mora, F.2
  • 18
    • 0035464414 scopus 로고    scopus 로고
    • Post-genome integrative biology: So that's what they call clinical science
    • Rees, J. (2001) Post-genome integrative biology: So that's what they call clinical science. Clinical Medicine, 1, pp. 393-400.
    • (2001) Clinical Medicine , vol.1 , pp. 393-400
    • Rees, J.1
  • 19
    • 53349093845 scopus 로고    scopus 로고
    • One Island East, Hong Kong: A case study in construction virtual prototyping
    • Riese, M. (2006) One Island East, Hong Kong: A case study in construction virtual prototyping. Proceedings of Virtual Prototyping Workshop
    • (2006) Proceedings of Virtual Prototyping Workshop
    • Riese, M.1
  • 22
    • 23944437350 scopus 로고    scopus 로고
    • A cooperative virtual prototyping system for mechatronic solution elements based assembly
    • Shen, Q., Gausemeier, J., Bauch, J. and Radkowski, R. (2005) A cooperative virtual prototyping system for mechatronic solution elements based assembly. Advanced Engineering Informatics, 19, pp. 169-177.
    • (2005) Advanced Engineering Informatics , vol.19 , pp. 169-177
    • Shen, Q.1    Gausemeier, J.2    Bauch, J.3    Radkowski, R.4
  • 23
    • 0031145409 scopus 로고    scopus 로고
    • Simulation of structural steel erection to assess innovations
    • Slaughter, E. S. and Eraso, M. (1997) Simulation of structural steel erection to assess innovations. IEEE Transactions on Engineering Management, 44:2, pp. 196-207.
    • (1997) IEEE Transactions on Engineering Management , vol.44 , Issue.2 , pp. 196-207
    • Slaughter, E.S.1    Eraso, M.2
  • 25
    • 33645150497 scopus 로고    scopus 로고
    • Developing a resource supply chain planning system for construction projects
    • Tserng, H. P., Yin, S. Y. L. and Li, S. (2006) Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132:4, pp. 393-407.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.4 , pp. 393-407
    • Tserng, H.P.1    Yin, S.Y.L.2    Li, S.3
  • 27
    • 22144466968 scopus 로고    scopus 로고
    • Faster, shorter, cheaper may be simple: It's never easy
    • Weisbord, M. and Jandoff, S. (2005) Faster, shorter, cheaper may be simple: It's never easy. Journal of Applied Behavioral Science, 41:1, pp. 70-82.
    • (2005) Journal of Applied Behavioral Science , vol.41 , Issue.1 , pp. 70-82
    • Weisbord, M.1    Jandoff, S.2
  • 28
    • 0442325259 scopus 로고    scopus 로고
    • Total quality management in the construction industry in Hong Kong: A supply chain management perspective
    • Wong, A. and Fung, P. (1999) Total quality management in the construction industry in Hong Kong: A supply chain management perspective. Total Quality Management, 10:2, pp. 199-208.
    • (1999) Total Quality Management , vol.10 , Issue.2 , pp. 199-208
    • Wong, A.1    Fung, P.2
  • 29
    • 2642586428 scopus 로고    scopus 로고
    • Agent-based composable simulation for virtual prototyping of fluid power system
    • Xiang, W., Fok, S. C. and Thimm, G. (2004) Agent-based composable simulation for virtual prototyping of fluid power system. Computers in Industry, 54, pp. 237-251.
    • (2004) Computers in Industry , vol.54 , pp. 237-251
    • Xiang, W.1    Fok, S.C.2    Thimm, G.3
  • 30
    • 33846466483 scopus 로고    scopus 로고
    • Coordination mechanisms for construction supply chain management in the Internet environment
    • Xue, X. L., Wang, Y. W., Shen, Q. P. and Yu, X. G. (2007) Coordination mechanisms for construction supply chain management in the Internet environment. International Journal of Project Management, 25, pp. 150-157.
    • (2007) International Journal of Project Management , vol.25 , pp. 150-157
    • Xue, X.L.1    Wang, Y.W.2    Shen, Q.P.3    Yu, X.G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.