메뉴 건너뛰기




Volumn 242, Issue 1, 2015, Pages 107-120

Part logistics in the automotive industry: Decision problems, literature review and research agenda

Author keywords

Automotive industry; Just in time; Part logistics; Survey

Indexed keywords

AUTOMOTIVE INDUSTRY; SURVEYING; SURVEYS;

EID: 84920841758     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2014.09.065     Document Type: Article
Times cited : (194)

References (105)
  • 1
    • 0033225131 scopus 로고    scopus 로고
    • An overview of design and operational issues of kanban systems
    • Akturk, M. S., & Erhun, F. (1999). An overview of design and operational issues of kanban systems. International Journal of Production Research, 37, 3859-3881.
    • (1999) International Journal of Production Research , vol.37 , pp. 3859-3881
    • Akturk, M.S.1    Erhun, F.2
  • 4
    • 51149110544 scopus 로고    scopus 로고
    • Allocating space in a forward pick area of a distribution center for small parts
    • Bartholdi, J. J., III, & Hackman, S. T. (2008). Allocating space in a forward pick area of a distribution center for small parts. IIE Transactions, 40, 1046-1053.
    • (2008) IIE Transactions , vol.40 , pp. 1046-1053
    • Bartholdi, J.J.1    Hackman, S.T.2
  • 5
    • 84880797694 scopus 로고    scopus 로고
    • Just-in-time supermarkets for part supply in the automobile industry
    • Battini, D., Boysen, N., & Emde, S. (2013). Just-in-time supermarkets for part supply in the automobile industry. Journal of Management Control, 24, 209-217.
    • (2013) Journal of Management Control , vol.24 , pp. 209-217
    • Battini, D.1    Boysen, N.2    Emde, S.3
  • 8
    • 84986958388 scopus 로고
    • A review of the kanban production control research literature
    • Berkley, B. J. (1992). A review of the kanban production control research literature. Production and Operations Management, 1, 393-411.
    • (1992) Production and Operations Management , vol.1 , pp. 393-411
    • Berkley, B.J.1
  • 9
    • 68249114212 scopus 로고    scopus 로고
    • Truck scheduling at zero-inventory cross docking terminals
    • Boysen, N. (2010). Truck scheduling at zero-inventory cross docking terminals. Computers & Operations Research, 37, 32-41.
    • (2010) Computers & Operations Research , vol.37 , pp. 32-41
    • Boysen, N.1
  • 10
    • 79551470593 scopus 로고    scopus 로고
    • Scheduling just-in-time part supply for mixed-model assembly lines
    • Boysen, N., & Bock, S. (2011). Scheduling just-in-time part supply for mixed-model assembly lines. European Journal of Operational Research 211, 15-25.
    • (2011) European Journal of Operational Research , vol.211 , pp. 15-25
    • Boysen, N.1    Bock, S.2
  • 11
    • 84880700174 scopus 로고    scopus 로고
    • Scheduling of inventory releasing jobs to satisfy time-varying demand: An analysis of complexity
    • Boysen, N., Bock, S., & Fliedner, M. (2013a). Scheduling of inventory releasing jobs to satisfy time-varying demand: An analysis of complexity. Journal of Scheduling, 16, 185-198.
    • (2013) Journal of Scheduling , vol.16 , pp. 185-198
    • Boysen, N.1    Bock, S.2    Fliedner, M.3
  • 12
    • 84874022139 scopus 로고    scopus 로고
    • Truck scheduling in cross-docking terminals with fixed outbound departures
    • Boysen, N., Briskorn, D., & Tschöke, M. (2013b). Truck scheduling in cross-docking terminals with fixed outbound departures. OR Spectrum, 35, 479-504.
    • (2013) OR Spectrum , vol.35 , pp. 479-504
    • Boysen, N.1    Briskorn, D.2    Tschöke, M.3
  • 14
    • 67651205275 scopus 로고    scopus 로고
    • Production planning of mixed-model assembly lines: Overview and extensions
    • Boysen, N., Fliedner, M., & Scholl, A. (2009a). Production planning of mixed-model assembly lines: Overview and extensions. Production Planning & Control, 20, 455-471.
    • (2009) Production Planning & Control , vol.20 , pp. 455-471
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 15
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines: Survey, classification and model critique
    • Boysen, N., Fliedner, M., & Scholl, A. (2009b). Sequencing mixed-model assembly lines: Survey, classification and model critique. European Journal of Operational Research, 192, 349-373.
    • (2009) European Journal of Operational Research , vol.192 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 16
    • 71149103397 scopus 로고    scopus 로고
    • Scheduling inbound and outbound trucks at cross docking terminals
    • Boysen, N., Fliedner, M., & Scholl, A. (2010). Scheduling inbound and outbound trucks at cross docking terminals. OR Spectrum, 32, 135-161.
    • (2010) OR Spectrum , vol.32 , pp. 135-161
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 18
    • 80053896596 scopus 로고    scopus 로고
    • Resequencing of mixed-model assembly lines: Survey and research agenda
    • Boysen, N., Scholl, A., & Wopperer, N. (2012). Resequencing of mixed-model assembly lines: Survey and research agenda. European Journal of Operational Research, 216, 594-604.
    • (2012) European Journal of Operational Research , vol.216 , pp. 594-604
    • Boysen, N.1    Scholl, A.2    Wopperer, N.3
  • 19
    • 38249010213 scopus 로고
    • Kitting versus line stocking: A conceptual framework and a descriptive model
    • Bozer, Y. A., & McGinnis, L. F. (1992). Kitting versus line stocking: A conceptual framework and a descriptive model. International Journal of Production Economics, 28, 1-19.
    • (1992) International Journal of Production Economics , vol.28 , pp. 1-19
    • Bozer, Y.A.1    McGinnis, L.F.2
  • 21
    • 11844274635 scopus 로고    scopus 로고
    • A space allocation algorithm for assembly line components
    • Bukchin, Y., & Meller, R. D. (2005). A space allocation algorithm for assembly line components. IIE Transactions, 37, 51-61.
    • (2005) IIE Transactions , vol.37 , pp. 51-61
    • Bukchin, Y.1    Meller, R.D.2
  • 22
    • 0002148143 scopus 로고    scopus 로고
    • Reverse logistics: A review of the literature and framework for future investigation
    • Carter, C. R., & Ellram, L. M. (1998). Reverse logistics: A review of the literature and framework for future investigation. Journal of Business Logistics, 19, 85-102.
    • (1998) Journal of Business Logistics , vol.19 , pp. 85-102
    • Carter, C.R.1    Ellram, L.M.2
  • 23
    • 52049122618 scopus 로고    scopus 로고
    • Minimizing the makespan in a two-machine cross-docking flow shop problem
    • Chen, F., & Lee, C. Y. (2009). Minimizing the makespan in a two-machine cross-docking flow shop problem. European Journal of Operational Research, 193, 59-72.
    • (2009) European Journal of Operational Research , vol.193 , pp. 59-72
    • Chen, F.1    Lee, C.Y.2
  • 24
    • 56549110639 scopus 로고    scopus 로고
    • Minimizing makespan in two-stage hybrid cross docking scheduling problem
    • Chen, F., & Song, K. (2009). Minimizing makespan in two-stage hybrid cross docking scheduling problem. Computers & Operations Research, 36, 2066-2073.
    • (2009) Computers & Operations Research , vol.36 , pp. 2066-2073
    • Chen, F.1    Song, K.2
  • 25
    • 0030288205 scopus 로고    scopus 로고
    • An exploration of supplier selection practices across the supply chain
    • Choi, T. Y., & Hartley, J. L. (1996). An exploration of supplier selection practices across the supply chain. Journal of Operations Management, 14, 333-343.
    • (1996) Journal of Operations Management , vol.14 , pp. 333-343
    • Choi, T.Y.1    Hartley, J.L.2
  • 26
    • 0036642734 scopus 로고    scopus 로고
    • A dynamic part-feeding system for an automotive assembly line
    • Choi, W., & Lee, Y. (2002). A dynamic part-feeding system for an automotive assembly line. Computers & Industrial Engineering, 43, 123-134.
    • (2002) Computers & Industrial Engineering , vol.43 , pp. 123-134
    • Choi, W.1    Lee, Y.2
  • 28
    • 25144483929 scopus 로고    scopus 로고
    • Routing for a just-in-time supply pickup and delivery system
    • Chuah, K. H., & Yingling, J. C. (2005). Routing for a just-in-time supply pickup and delivery system. Transportation Science, 39, 328-339.
    • (2005) Transportation Science , vol.39 , pp. 328-339
    • Chuah, K.H.1    Yingling, J.C.2
  • 29
    • 77955444898 scopus 로고    scopus 로고
    • Recent results on arc routing problems: An annotated bibliography
    • Corberán, A., & Prins, C. (2010). Recent results on arc routing problems: An annotated bibliography. Networks, 56, 50-69.
    • (2010) Networks , vol.56 , pp. 50-69
    • Corberán, A.1    Prins, C.2
  • 31
    • 84989012425 scopus 로고
    • Supplier relations and management: A survey of Japanese, Japanese-transplant, and US auto plants
    • Cusumano, M. A., & Takeishi, A. (1991). Supplier relations and management: A survey of Japanese, Japanese-transplant, and US auto plants. Strategic Management Journal, 12, 563-588.
    • (1991) Strategic Management Journal , vol.12 , pp. 563-588
    • Cusumano, M.A.1    Takeishi, A.2
  • 35
    • 34247111842 scopus 로고    scopus 로고
    • Materials flow improvement in a lean assembly line: A case study
    • Domingo, R., Alvarez, R., Peña, M. M., & Calvo, R. (2007). Materials flow improvement in a lean assembly line: A case study. Assembly Automation, 27, 141-147.
    • (2007) Assembly Automation , vol.27 , pp. 141-147
    • Domingo, R.1    Alvarez, R.2    Peña, M.M.3    Calvo, R.4
  • 36
    • 84865109540 scopus 로고    scopus 로고
    • Synchronization in vehicle routing - A survey of VRPs with multiple synchronization constraints
    • Drexl, M. (2012). Synchronization in vehicle routing - A survey of VRPs with multiple synchronization constraints. Transportation Science, 46, 297-316.
    • (2012) Transportation Science , vol.46 , pp. 297-316
    • Drexl, M.1
  • 39
    • 34250117476 scopus 로고
    • Computational comparisons of algorithms for the inventory routing problem
    • Dror, M., Ball, M., & Golden, B. (1985). Computational comparisons of algorithms for the inventory routing problem. Annals of Operations Research, 4, 3-23.
    • (1985) Annals of Operations Research , vol.4 , pp. 3-23
    • Dror, M.1    Ball, M.2    Golden, B.3
  • 40
    • 84880712689 scopus 로고    scopus 로고
    • Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times
    • Drótos, M., & Kis, T. (2013). Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times. Journal of Scheduling, 16, 337-346.
    • (2013) Journal of Scheduling , vol.16 , pp. 337-346
    • Drótos, M.1    Kis, T.2
  • 43
    • 0029239726 scopus 로고
    • Relationships between ergonomics and quality in assembly work
    • Eklund, J. A. (1995). Relationships between ergonomics and quality in assembly work. Applied Ergonomics, 26, 15-20.
    • (1995) Applied Ergonomics , vol.26 , pp. 15-20
    • Eklund, J.A.1
  • 44
    • 80755186522 scopus 로고    scopus 로고
    • Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines
    • Emde, S., Boysen, N. (2012a). Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines. European Journal of Operational Research, 217, 287-299.
    • (2012) European Journal of Operational Research , vol.217 , pp. 287-299
    • Emde, S.1    Boysen, N.2
  • 45
    • 80055039560 scopus 로고    scopus 로고
    • Optimally locating in-house logistics areas to facilitate JIT-supply ofmixed-model assembly lines
    • Emde, S., Boysen, N. (2012b).Optimally locating in-house logistics areas to facilitate JIT-supply ofmixed-model assembly lines. International Journal of Production Economics, 135, 393-402.
    • (2012) International Journal of Production Economics , vol.135 , pp. 393-402
    • Emde, S.1    Boysen, N.2
  • 46
    • 84856698416 scopus 로고    scopus 로고
    • Optimally loading tow trains for JIT-supply of mixed-model assembly lines
    • Emde, S., Fliedner, M., & Boysen, N. (2012). Optimally loading tow trains for JIT-supply of mixed-model assembly lines. IIE Transactions, 44, 121-135.
    • (2012) IIE Transactions , vol.44 , pp. 121-135
    • Emde, S.1    Fliedner, M.2    Boysen, N.3
  • 47
    • 84880791700 scopus 로고    scopus 로고
    • Design and simulation of assembly line feeding systems in the automotive sector using supermarket, kanbans and tow trains: A general framework
    • Faccio, M., Gamberi, M., Persona, A., Regattieri, A., & Sgarbossa, F. (2013). Design and simulation of assembly line feeding systems in the automotive sector using supermarket, kanbans and tow trains: A general framework. Journal of Management Control, 24, 187-208.
    • (2013) Journal of Management Control , vol.24 , pp. 187-208
    • Faccio, M.1    Gamberi, M.2    Persona, A.3    Regattieri, A.4    Sgarbossa, F.5
  • 51
    • 0041952542 scopus 로고
    • The forward-reserve problem
    • T.Ciriani, R.Leachman (Eds.), New York: Wiley
    • Frazelle, E. H., Hackman, S. T., Passy, U., & Platzman, L. K. (1994). The forward-reserve problem. In: T.Ciriani, R.Leachman (Eds.), Optimization in industry,Vol. II (pp. 43-61). New York: Wiley.
    • (1994) Optimization in Industry , vol.2 , pp. 43-61
    • Frazelle, E.H.1    Hackman, S.T.2    Passy, U.3    Platzman, L.K.4
  • 52
    • 84861567531 scopus 로고    scopus 로고
    • Storage policies and order picking strategies in U-shaped order-picking systems with a movable base
    • Glock, C. H., & Grosse, E. H. (2012). Storage policies and order picking strategies in U-shaped order-picking systems with a movable base. International Journal of Production Research, 50, 4344-4357.
    • (2012) International Journal of Production Research , vol.50 , pp. 4344-4357
    • Glock, C.H.1    Grosse, E.H.2
  • 56
    • 70449529526 scopus 로고    scopus 로고
    • Research on warehouse design and performance evaluation: A comprehensive review
    • Gu, J., Goetschalckx, M., & McGinnis, L. F. (2010a). Research on warehouse design and performance evaluation: A comprehensive review. European Journal of Operational Research, 203, 539-549.
    • (2010) European Journal of Operational Research , vol.203 , pp. 539-549
    • Gu, J.1    Goetschalckx, M.2    McGinnis, L.F.3
  • 57
    • 77951965360 scopus 로고    scopus 로고
    • Solving the forward-reserve allocation problem in warehouse order picking systems
    • Gu, J., Goetschalckx, M., & McGinnis, M. F. (2010b). Solving the forward-reserve allocation problem in warehouse order picking systems. Journal of the Operational Research Society, 61, 1013-1021.
    • (2010) Journal of the Operational Research Society , vol.61 , pp. 1013-1021
    • Gu, J.1    Goetschalckx, M.2    McGinnis, M.F.3
  • 58
    • 48249130526 scopus 로고    scopus 로고
    • Appointment scheduling in health care: Challenges and opportunities
    • Gupta, D., & Denton, B. (2008). Appointment scheduling in health care: Challenges and opportunities. IIE Transactions, 40, 800-819.
    • (2008) IIE Transactions , vol.40 , pp. 800-819
    • Gupta, D.1    Denton, B.2
  • 59
    • 0025399565 scopus 로고
    • Allocating items to an automated storage and retrieval system
    • Hackman, S. T., & Rosenblatt, M. J. (1990). Allocating items to an automated storage and retrieval system. IIE Transactions, 22, 7-14.
    • (1990) IIE Transactions , vol.22 , pp. 7-14
    • Hackman, S.T.1    Rosenblatt, M.J.2
  • 60
    • 84905397216 scopus 로고    scopus 로고
    • Harmony search optimization algorithm for a novel transportation problem in a consolidation network
    • Hosseini, S. D., Shirazi, M. A., & Ghomi, S. M. T. F. (2013). Harmony search optimization algorithm for a novel transportation problem in a consolidation network. Engineering Optimization, 46, 1538-1552.
    • (2013) Engineering Optimization , vol.46 , pp. 1538-1552
    • Hosseini, S.D.1    Shirazi, M.A.2    Ghomi, S.M.T.F.3
  • 61
    • 74549216440 scopus 로고    scopus 로고
    • Research issues on factors influencing the choice of kitting versus line stocking
    • Hua, S. Y., & Johnson, D. J. (2010). Research issues on factors influencing the choice of kitting versus line stocking. International Journal of Production Research, 48, 779-800.
    • (2010) International Journal of Production Research , vol.48 , pp. 779-800
    • Hua, S.Y.1    Johnson, D.J.2
  • 65
    • 0030288472 scopus 로고    scopus 로고
    • Facility layout to support just-in-time
    • Kamoun, M., & Yano, C. A. (1996). Facility layout to support just-in-time. Transportation Science, 30, 315-329.
    • (1996) Transportation Science , vol.30 , pp. 315-329
    • Kamoun, M.1    Yano, C.A.2
  • 67
    • 8444229387 scopus 로고    scopus 로고
    • Facility location models for distribution system design
    • Klose, A., & Drexl, A. (2005). Facility location models for distribution system design. European Journal of Operational Research, 162, 4-29.
    • (2005) European Journal of Operational Research , vol.162 , pp. 4-29
    • Klose, A.1    Drexl, A.2
  • 69
    • 0033882294 scopus 로고    scopus 로고
    • An integrated material handling system for a truck assembly plant
    • Kozan, E. (2000). An integrated material handling system for a truck assembly plant. Journal of the Operational Research Society, 51, 263-271.
    • (2000) Journal of the Operational Research Society , vol.51 , pp. 263-271
    • Kozan, E.1
  • 70
    • 84880776902 scopus 로고    scopus 로고
    • Strategische Implikationen einer geringen Fertigungstiefe für die Automobilindustrie
    • University of Heidelberg, Germany
    • Krcal, H.-C. (2007). Strategische Implikationen einer geringen Fertigungstiefe für die Automobilindustrie. Discussion Paper Series No. 456, University of Heidelberg, Germany.
    • (2007) Discussion Paper Series No. 456
    • Krcal, H.-C.1
  • 71
    • 0026874435 scopus 로고
    • The vehicle routing problem: An overview of exact and approximate algorithms
    • Laporte, G. (1992). The vehicle routing problem: An overview of exact and approximate algorithms. European Journal of Operational Research, 59, 345-358.
    • (1992) European Journal of Operational Research , vol.59 , pp. 345-358
    • Laporte, G.1
  • 72
    • 0030269710 scopus 로고    scopus 로고
    • Retrieval sequencing for unit-load automated storage and retrieval systems with multiple openings
    • Lee, H. F., & Schaefer, S. K. (1996). Retrieval sequencing for unit-load automated storage and retrieval systems with multiple openings. International Journal of Production Research, 34, 2943-2962.
    • (1996) International Journal of Production Research , vol.34 , pp. 2943-2962
    • Lee, H.F.1    Schaefer, S.K.2
  • 73
    • 33750203805 scopus 로고    scopus 로고
    • Vehicle routing scheduling for cross-docking in the supply chain
    • Lee, Y. H., Jung, J. W., & Lee, K. M. (2006). Vehicle routing scheduling for cross-docking in the supply chain. Computers & Industrial Engineering, 51, 247-256.
    • (2006) Computers & Industrial Engineering , vol.51 , pp. 247-256
    • Lee, Y.H.1    Jung, J.W.2    Lee, K.M.3
  • 74
    • 78049527306 scopus 로고    scopus 로고
    • Vehicle routing with cross-docking in the supply chain
    • Liao, C. J., Lin, Y., & Shih, S. C. (2010). Vehicle routing with cross-docking in the supply chain. Expert Systems with Applications, 37, 6868-6873.
    • (2010) Expert Systems with Applications , vol.37 , pp. 6868-6873
    • Liao, C.J.1    Lin, Y.2    Shih, S.C.3
  • 78
    • 17444400924 scopus 로고    scopus 로고
    • Supply chain planning in the German automotive industry
    • Meyr, H. (2004). Supply chain planning in the German automotive industry. OR Spectrum, 26, 447-470.
    • (2004) OR Spectrum , vol.26 , pp. 447-470
    • Meyr, H.1
  • 79
    • 50849137192 scopus 로고    scopus 로고
    • Truck dock assignment problem with operational time constraint within crossdocks
    • Miao, Z., Lim, A., Ma, H. (2009). Truck dock assignment problem with operational time constraint within crossdocks. European Journal of Operational Research, 192, 105-115.
    • (2009) European Journal of Operational Research , vol.192 , pp. 105-115
    • Miao, Z.1    Lim, A.2    Ma, H.3
  • 82
    • 79953325678 scopus 로고    scopus 로고
    • Incorporating ergonomic risks into assembly line balancing
    • Otto, A., & Scholl, A. (2011). Incorporating ergonomic risks into assembly line balancing. European Journal of Operational Research, 212, 277-286.
    • (2011) European Journal of Operational Research , vol.212 , pp. 277-286
    • Otto, A.1    Scholl, A.2
  • 83
    • 84879212526 scopus 로고    scopus 로고
    • Reducing ergonomic risks by job rotation scheduling
    • Otto, A., & Scholl, A. (2013). Reducing ergonomic risks by job rotation scheduling. OR Spectrum, 35, 711-733.
    • (2013) OR Spectrum , vol.35 , pp. 711-733
    • Otto, A.1    Scholl, A.2
  • 84
    • 8644278723 scopus 로고    scopus 로고
    • Linking product variety to orderfulfillment strategies
    • Pil, F. K., & Holweg, M. (2004). Linking product variety to orderfulfillment strategies. Interfaces, 34, 394-403.
    • (2004) Interfaces , vol.34 , pp. 394-403
    • Pil, F.K.1    Holweg, M.2
  • 86
    • 84879045089 scopus 로고    scopus 로고
    • Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line
    • Rao, Y. Q., Wang, M. C., Wang, K. P., & Wu, T. M. (2013). Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line. Computers & Operations Research, 40, 2599-2610.
    • (2013) Computers & Operations Research , vol.40 , pp. 2599-2610
    • Rao, Y.Q.1    Wang, M.C.2    Wang, K.P.3    Wu, T.M.4
  • 87
  • 88
    • 0035815837 scopus 로고    scopus 로고
    • The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost
    • Richter, K., & Weber, J. (2001). The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost. International Journal of Production Economics, 71, 447-456.
    • (2001) International Journal of Production Economics , vol.71 , pp. 447-456
    • Richter, K.1    Weber, J.2
  • 89
    • 54449094293 scopus 로고    scopus 로고
    • A survey of literature on automated storage and retrieval systems
    • Roodbergen, K. J., Vis, I. F. A. (2009). A survey of literature on automated storage and retrieval systems. European Journal of Operational Research, 194, 343-362.
    • (2009) European Journal of Operational Research , vol.194 , pp. 343-362
    • Roodbergen, K.J.1    Vis, I.F.A.2
  • 90
    • 68849104895 scopus 로고    scopus 로고
    • A new mathematical modeling and a genetic algorithm search for milk run problem (an auto industry supply chain case study)
    • Sadjadi, S. J., Jafari, M., & Amini, T. (2009). A new mathematical modeling and a genetic algorithm search for milk run problem (an auto industry supply chain case study). The International Journal of Advanced Manufacturing Technology, 44, 194-200.
    • (2009) The International Journal of Advanced Manufacturing Technology , vol.44 , pp. 194-200
    • Sadjadi, S.J.1    Jafari, M.2    Amini, T.3
  • 91
    • 33751049900 scopus 로고    scopus 로고
    • An efficient genetic algorithm for determining the optimal price discrimination
    • Safaei, N., Sadjadi, S. J., & Babakhani, M. (2006). An efficient genetic algorithm for determining the optimal price discrimination. Applied Mathematics and Computation, 181, 1693-1702.
    • (2006) Applied Mathematics and Computation , vol.181 , pp. 1693-1702
    • Safaei, N.1    Sadjadi, S.J.2    Babakhani, M.3
  • 92
    • 84874324928 scopus 로고    scopus 로고
    • Design of a just-in-time periodic material supply system for the assembly lines and an application in electronics industry
    • Satoglu, S. I., & Sahin, I. E. (2013). Design of a just-in-time periodic material supply system for the assembly lines and an application in electronics industry. The International Journal of Advanced Manufacturing Technology, 65, 319-332.
    • (2013) The International Journal of Advanced Manufacturing Technology , vol.65 , pp. 319-332
    • Satoglu, S.I.1    Sahin, I.E.2
  • 94
    • 0022731384 scopus 로고
    • On the worst-case performance of some heuristics for the vehicle routing and scheduling problem with time window constraints
    • Solomon, M. M. (1986). On the worst-case performance of some heuristics for the vehicle routing and scheduling problem with time window constraints. Networks, 16, 161-174.
    • (1986) Networks , vol.16 , pp. 161-174
    • Solomon, M.M.1
  • 95
    • 38849199302 scopus 로고    scopus 로고
    • Managing product variety in automobile assembly: The importance of the sequencing point
    • Swaminathan, J. M., Nitsch, T. R. (2007). Managing product variety in automobile assembly: The importance of the sequencing point. Interfaces, 37, 324-333.
    • (2007) Interfaces , vol.37 , pp. 324-333
    • Swaminathan, J.M.1    Nitsch, T.R.2
  • 97
    • 0033342220 scopus 로고    scopus 로고
    • A capacitated vehicle routing problem for just-in-time delivery
    • Vaidyanathan, B. S., Matson, J. O., Miller, D. M., & Matson, J. E. (1999). A capacitated vehicle routing problem for just-in-time delivery. IIE Transactions, 31, 1083-1092.
    • (1999) IIE Transactions , vol.31 , pp. 1083-1092
    • Vaidyanathan, B.S.1    Matson, J.O.2    Miller, D.M.3    Matson, J.E.4
  • 100
    • 84877710876 scopus 로고    scopus 로고
    • The discrete forward-reserve problem - Allocating space, selecting products, and area sizing in forward order picking
    • Walter, R., Boysen, N., & Scholl, A. (2013). The discrete forward-reserve problem - Allocating space, selecting products, and area sizing in forward order picking. European Journal of Operational Research, 229, 585-594.
    • (2013) European Journal of Operational Research , vol.229 , pp. 585-594
    • Walter, R.1    Boysen, N.2    Scholl, A.3
  • 102
    • 0007768196 scopus 로고    scopus 로고
    • Research paper 4/2000. The International Car Distribution Programme, Solihull
    • Williams, G. (2000). Progress towards customer pull distribution. Research paper 4/2000. The International Car Distribution Programme, Solihull.
    • (2000) Progress Towards Customer Pull Distribution
    • Williams, G.1
  • 103
  • 104
    • 0032120465 scopus 로고    scopus 로고
    • Optimizing dock configuration and staffing in decentralized receiving
    • Yano, C. A., Bozer, Y., & Kamoun, M. (1998). Optimizing dock configuration and staffing in decentralized receiving. IIE Transactions, 30, 657-668.
    • (1998) IIE Transactions , vol.30 , pp. 657-668
    • Yano, C.A.1    Bozer, Y.2    Kamoun, M.3
  • 105
    • 34548432064 scopus 로고    scopus 로고
    • Scheduling of inbound and outbound trucks in cross docking systems with temporary storage
    • Yu, W., & Egbelu, P. J. (2008). Scheduling of inbound and outbound trucks in cross docking systems with temporary storage. European Journal of Operational Research, 184, 377-396.
    • (2008) European Journal of Operational Research , vol.184 , pp. 377-396
    • Yu, W.1    Egbelu, P.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.