메뉴 건너뛰기




Volumn 27, Issue 2, 2007, Pages 141-147

Materials flow improvement in a lean assembly line: A case study

Author keywords

Assembly plants; Lean production; Materials handling equipment

Indexed keywords

ASSEMBLY; INDUSTRIAL PLANTS; MANUFACTURE; PRODUCTION;

EID: 34247111842     PISSN: 01445154     EISSN: None     Source Type: Journal    
DOI: 10.1108/01445150710733379     Document Type: Article
Times cited : (82)

References (14)
  • 1
    • 33748693686 scopus 로고    scopus 로고
    • "Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach"
    • available at
    • Agarwal, A., Shankar, R. and Tiwari, M.K. (2006), "Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach", European Journal of Operational Research, Vol. 173 No. 1, pp. 211-25, available at: http://dx.doi.org/10.1016/ j.ejor.2004.12.005.
    • (2006) European Journal of Operational Research , vol.173 , Issue.1 , pp. 211-225
    • Agarwal, A.1    Shankar, R.2    Tiwari, M.K.3
  • 2
    • 34247093081 scopus 로고    scopus 로고
    • "A heuristic approach for decision-making on assembly systems for mass customisation"
    • available at
    • Calvo, R., Domingo, R. and Rubio, E.M. (2006), "A heuristic approach for decision-making on assembly systems for mass customisation", Materials Science Forum, Vol. 526, pp. 1-6, available at: www.scientific.net/0-87849-417-0/1/.
    • (2006) Materials Science Forum , vol.526
    • Calvo, R.1    Domingo, R.2    Rubio, E.M.3
  • 3
    • 33645706997 scopus 로고    scopus 로고
    • "Automation, motivation and lean production reconsidered"
    • available at
    • Coffey, D. and Thornley, C. (2006), "Automation, motivation and lean production reconsidered", Assembly Automation, Vol. 26 No. 2, pp. 98-103, available at: www.emeraldinsight.com/10.1108/ 01445150610658068.
    • (2006) Assembly Automation , vol.26 , Issue.2 , pp. 98-103
    • Coffey, D.1    Thornley, C.2
  • 4
    • 34347234572 scopus 로고    scopus 로고
    • "A real-time vehicle-dispatching system for consolidating milk runs"
    • available at (accessed 5 June 2006) (in press)
    • Du, T., Wang, F.K. and Lu, P.Y. (2006), "A real-time vehicle-dispatching system for consolidating milk runs", Transportation Research Part E: Logistics and Transportation Review, available at: http://dx.doi.org/10.1016/j.tre.2006.03.001 (accessed 5 June 2006) (in press).
    • (2006) Transportation Research Part E: Logistics and Transportation Review
    • Du, T.1    Wang, F.K.2    Lu, P.Y.3
  • 5
    • 2042542065 scopus 로고    scopus 로고
    • "Heuristic transporter routing model for manufacturing facility design"
    • available at
    • Hwang, H.S. (2004), "Heuristic transporter routing model for manufacturing facility design", Computers & Industrial Engineering, Vol. 46 No. 2, pp. 243-51, available at: http://dx.doi.org/ 10.1016/j.cie.2003.12.021.
    • (2004) Computers & Industrial Engineering , vol.46 , Issue.2 , pp. 243-251
    • Hwang, H.S.1
  • 6
    • 0037061455 scopus 로고    scopus 로고
    • "Design of a suitable production management system for a manufacturing company"
    • available at
    • Lejtman, Y., Shayan, E. and Nagarajah, R. (2002), "Design of a suitable production management system for a manufacturing company", Computers & Industrial Engineering, Vol. 42 Nos 2/4, pp. 169-74, available at: http://dx.doi.org/10.1016/S0360-8352(02)00012-8.
    • (2002) Computers & Industrial Engineering , vol.42 , Issue.2-4 , pp. 169-174
    • Lejtman, Y.1    Shayan, E.2    Nagarajah, R.3
  • 7
    • 3843065481 scopus 로고    scopus 로고
    • "Lean indicators and manufacturing strategies"
    • available at
    • Martínez, A. and Pérez, M. (2001), "Lean indicators and manufacturing strategies", International Journal of Operations & Production Management, Vol. 21 No. 11, pp. 1433-52, available at: www.emeraldinsight.com/10.1108/01443570110407436.
    • (2001) International Journal of Operations & Production Management , vol.21 , Issue.11 , pp. 1433-1452
    • Martínez, A.1    Pérez, M.2
  • 8
    • 0242364676 scopus 로고    scopus 로고
    • "Classification scheme for lean manufacturing tools"
    • available at
    • Pavnaskar, S.J., Gershenson, J.K. and Jambekar, A.B. (2003), "Classification scheme for lean manufacturing tools", International Journal of Production Research, Vol. 41 No. 3, pp. 3075-90, available at: http://dx.doi.org/10.1080/0020754021000049817.
    • (2003) International Journal of Production Research , vol.41 , Issue.3 , pp. 3075-3090
    • Pavnaskar, S.J.1    Gershenson, J.K.2    Jambekar, A.B.3
  • 9
    • 34248539177 scopus 로고
    • "Flexibility in manufacturing: A survey"
    • available at
    • Sethi, A.K. and Sethi, S.P. (1990), "Flexibility in manufacturing: a survey", International Journal of Flexible Manufacturing Systems, Vol. 2 No. 4, pp. 289-328, available at: http://dx.doi.org/10.1007/ BF00186471.
    • (1990) International Journal of Flexible Manufacturing Systems , vol.2 , Issue.4 , pp. 289-328
    • Sethi, A.K.1    Sethi, S.P.2
  • 10
    • 0037357671 scopus 로고    scopus 로고
    • "Lean manufacturing: Context, practice bundles, and performance"
    • available at
    • Shah, R. and Ward, P. (2003), "Lean manufacturing: Context, practice bundles, and performance", Journal of Operation Management, Vol. 21 No. 2, pp. 129-49, available at: http://dx.doi.org/ 10.1016/S0272-6963(02)00108-0.
    • (2003) Journal of Operation Management , vol.21 , Issue.2
    • Shah, R.1    Ward, P.2
  • 11
    • 0036190151 scopus 로고    scopus 로고
    • "A model for evaluating the degree of leanness of manufacturing firms"
    • available at
    • Soriano-Meier, H. and Forrester, P. (2002), "A model for evaluating the degree of leanness of manufacturing firms", Integrated Manufacturing Systems, Vol. 2 No. 2, pp. 104-9, available at: www.emerald-library.com/10.1108/09576060210415437.
    • (2002) Integrated Manufacturing Systems , vol.2 , Issue.2 , pp. 104-109
    • Soriano-Meier, H.1    Forrester, P.2
  • 12
    • 0036609510 scopus 로고    scopus 로고
    • "Equipment replacement decisions and lean manufacturing"
    • available at
    • Sullivan, W.G., McDonald, T.N. and van Aken, E.M. (2002), "Equipment replacement decisions and lean manufacturing", Robotics & Computer-Integrated Manufacturing, Vol. 18 Nos 3/4, pp. 255-65, available at: http://dx.doi.org/10.1016/S0736-5845(02)00016-9.
    • (2002) Robotics & Computer-Integrated Manufacturing , vol.18 , Issue.3-4 , pp. 255-265
    • Sullivan, W.G.1    McDonald, T.N.2    van Aken, E.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.