메뉴 건너뛰기




Volumn 118, Issue 2, 2009, Pages 501-507

Trading off between heijunka and just-in-sequence

Author keywords

Heijunka; Just in sequence; Lean production; Scheduling; Simulation

Indexed keywords

CAPACITY UTILIZATIONS; HEIJUNKA; JUST IN SEQUENCE; LEAN PRODUCTION; SIMULATION; SIMULATION-BASED;

EID: 63149148744     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2008.12.014     Document Type: Article
Times cited : (81)

References (36)
  • 1
    • 33846919290 scopus 로고    scopus 로고
    • Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study
    • Abdulmalek F.A., and Rajgopal J. Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study. International Journal of Production Economics 107 (2007) 223-236
    • (2007) International Journal of Production Economics , vol.107 , pp. 223-236
    • Abdulmalek, F.A.1    Rajgopal, J.2
  • 2
    • 57649084221 scopus 로고    scopus 로고
    • Reconceptualizing the effects of lean on production costs with evidence from the F-22 program
    • doi:10.1016/j.jom.2008.03.009, 22pp
    • Browning, T.R., Heath, R.D., 2008. Reconceptualizing the effects of lean on production costs with evidence from the F-22 program. Journal of Operations Management, doi:10.1016/j.jom.2008.03.009, 22pp.
    • (2008) Journal of Operations Management
    • Browning, T.R.1    Heath, R.D.2
  • 5
    • 0042044389 scopus 로고    scopus 로고
    • Using simulation to evaluate the introduction of a kanban subsystem within an MRP-controlled manufacturing environment
    • De Smet R., and Gelders L. Using simulation to evaluate the introduction of a kanban subsystem within an MRP-controlled manufacturing environment. International Journal of Production Economics 56-57 (1998) 111-122
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 111-122
    • De Smet, R.1    Gelders, L.2
  • 6
    • 29144481648 scopus 로고    scopus 로고
    • Can lean production be intrinsically motivating? Contextual, configurational, and levels-of-analysis issues
    • de Treville S., and Antonakis J. Can lean production be intrinsically motivating? Contextual, configurational, and levels-of-analysis issues. Journal of Operations Management 24 2 (2006) 99-123
    • (2006) Journal of Operations Management , vol.24 , Issue.2 , pp. 99-123
    • de Treville, S.1    Antonakis, J.2
  • 8
    • 0000085786 scopus 로고    scopus 로고
    • Mass customization at Hewlett Packard-the power of postponement
    • Feitzinger E., and Lee H.L. Mass customization at Hewlett Packard-the power of postponement. Harvard Business Review 75 1 (1997) 116-121
    • (1997) Harvard Business Review , vol.75 , Issue.1 , pp. 116-121
    • Feitzinger, E.1    Lee, H.L.2
  • 16
    • 84865090523 scopus 로고    scopus 로고
    • Japanese automakers, US suppliers and supply-chain superiority
    • Liker J.K., and Wu Y. Japanese automakers, US suppliers and supply-chain superiority. Sloan Management Review (2000) 81-93
    • (2000) Sloan Management Review , pp. 81-93
    • Liker, J.K.1    Wu, Y.2
  • 17
    • 0031276902 scopus 로고    scopus 로고
    • Management initiatives and just-in-time manufacturing
    • McLachlin R. Management initiatives and just-in-time manufacturing. Journal of Operations Management 15 (1997) 271-292
    • (1997) Journal of Operations Management , vol.15 , pp. 271-292
    • McLachlin, R.1
  • 18
    • 63149175046 scopus 로고    scopus 로고
    • Mishina, K, Takeda, K, 1994. Toyota Manufacturing USA, Inc. Case 9-693-019, Harvard Business School, Cambridge, MA, 22pp
    • Mishina, K., Takeda, K., 1994. Toyota Manufacturing USA, Inc. Case 9-693-019, Harvard Business School, Cambridge, MA, 22pp.
  • 19
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Institute of Industrial Engineers, Norcross, GA
    • Monden Y. Toyota Production System (1983), Industrial Engineering and Management Press, Institute of Industrial Engineers, Norcross, GA
    • (1983) Toyota Production System
    • Monden, Y.1
  • 20
    • 33747886515 scopus 로고    scopus 로고
    • Disentangling leanness and agility: an empirical investigation
    • Narasimhan R., Swink M.L., and Kim S.W. Disentangling leanness and agility: an empirical investigation. Journal of Operations Management 24 5 (2006) 440-457
    • (2006) Journal of Operations Management , vol.24 , Issue.5 , pp. 440-457
    • Narasimhan, R.1    Swink, M.L.2    Kim, S.W.3
  • 21
    • 1342308282 scopus 로고    scopus 로고
    • Exploring flexibility and execution competencies of manufacturing firms
    • Narasimhan R., Talluri S., and Das A. Exploring flexibility and execution competencies of manufacturing firms. Journal of Operations Management 22 1 (2004) 91-106
    • (2004) Journal of Operations Management , vol.22 , Issue.1 , pp. 91-106
    • Narasimhan, R.1    Talluri, S.2    Das, A.3
  • 22
    • 60449106481 scopus 로고    scopus 로고
    • Das neue Vertriebs- und Produktionssystem der BMW Group-Kundenorientierter Vertriebs- und Produktionsprozeß (KOVP)
    • Pietsch D. Das neue Vertriebs- und Produktionssystem der BMW Group-Kundenorientierter Vertriebs- und Produktionsprozeß (KOVP). ZfAW (BMW) (2002) 45-51
    • (2002) ZfAW (BMW) , pp. 45-51
    • Pietsch, D.1
  • 24
    • 0038824825 scopus 로고    scopus 로고
    • Combining lean and agile characteristics: creation of virtual groups by enhanced production flow analysis
    • Prince J., and Kay J. Combining lean and agile characteristics: creation of virtual groups by enhanced production flow analysis. International Journal of Production Economics 85 (2003) 305-318
    • (2003) International Journal of Production Economics , vol.85 , pp. 305-318
    • Prince, J.1    Kay, J.2
  • 25
    • 84937185693 scopus 로고    scopus 로고
    • After lean production: evolving employment practices in the world auto industry
    • Rinehart J. After lean production: evolving employment practices in the world auto industry. American Journal of Sociology (1997) 1212-1214
    • (1997) American Journal of Sociology , pp. 1212-1214
    • Rinehart, J.1
  • 26
    • 84976971986 scopus 로고
    • New developments in manufacturing: the just-in-time system
    • Sayer A. New developments in manufacturing: the just-in-time system. Capital & Class 10 (1986) 43-71
    • (1986) Capital & Class , vol.10 , pp. 43-71
    • Sayer, A.1
  • 28
    • 0001325940 scopus 로고
    • Assessing the organizational fit of a just-in-time manufacturing system: testing selection, interaction, and systems models of contingency theory
    • Selto F.H., Renner C.J., and Young S.M. Assessing the organizational fit of a just-in-time manufacturing system: testing selection, interaction, and systems models of contingency theory. Accounting, Organizations & Society 20 7/8 (1995) 665-684
    • (1995) Accounting, Organizations & Society , vol.20 , Issue.7-8 , pp. 665-684
    • Selto, F.H.1    Renner, C.J.2    Young, S.M.3
  • 29
    • 0037357671 scopus 로고    scopus 로고
    • Lean manufacturing: context, practice bundles, and performance
    • Shah R., and Ward P.T. Lean manufacturing: context, practice bundles, and performance. Journal of Operations Management 21 (2003) 129-149
    • (2003) Journal of Operations Management , vol.21 , pp. 129-149
    • Shah, R.1    Ward, P.T.2
  • 31
    • 38249038769 scopus 로고
    • Getting from just-in-case to just-in-time: insights from a simple model
    • Suri R., and de Treville S. Getting from just-in-case to just-in-time: insights from a simple model. Journal of Operations Management 6 3 (1986) 295-304
    • (1986) Journal of Operations Management , vol.6 , Issue.3 , pp. 295-304
    • Suri, R.1    de Treville, S.2
  • 33
  • 34
    • 0035252557 scopus 로고    scopus 로고
    • The rediscovery of postponement: a literature review and directions for research
    • Van Hoek R.I. The rediscovery of postponement: a literature review and directions for research. Journal of Operations Management 19 2 (2001) 161-184
    • (2001) Journal of Operations Management , vol.19 , Issue.2 , pp. 161-184
    • Van Hoek, R.I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.