메뉴 건너뛰기




Volumn 40, Issue 11, 2013, Pages 2599-2610

Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line

Author keywords

GASA; Just in time; Mixed model assembly line; Part supply; Vehicle scheduling

Indexed keywords

GASA; JUST IN TIME; MIXED-MODEL ASSEMBLY LINES; PART SUPPLIES; VEHICLE SCHEDULING;

EID: 84879045089     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2013.05.007     Document Type: Article
Times cited : (44)

References (20)
  • 2
    • 0032026875 scopus 로고    scopus 로고
    • Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies
    • M.F. Anwar, and R. Nagi Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies International Journal of Production Research 36 3 1998 653 681
    • (1998) International Journal of Production Research , vol.36 , Issue.3 , pp. 653-681
    • Anwar, M.F.1    Nagi, R.2
  • 3
    • 79551470593 scopus 로고    scopus 로고
    • Scheduling just-in-time part supply for mixed-model assembly lines
    • N. Boysen, and S. Bock Scheduling just-in-time part supply for mixed-model assembly lines European Journal of Operational Research 211 2011 15 25
    • (2011) European Journal of Operational Research , vol.211 , pp. 15-25
    • Boysen, N.1    Bock, S.2
  • 4
    • 58249083327 scopus 로고    scopus 로고
    • Assembly line balancing joint precedence graphs under high product variety
    • N. Boysen, M. Fliedner, and A. Scholl Assembly line balancing joint precedence graphs under high product variety IIE Transactions 41 3 2009 183 193
    • (2009) IIE Transactions , vol.41 , Issue.3 , pp. 183-193
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 5
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines survey, classification and model critique
    • N. Boysen, M. Fliedner, and A. Scholl Sequencing mixed-model assembly lines survey, classification and model critique European Journal of Operational Research 192 2 2009 349 373
    • (2009) European Journal of Operational Research , vol.192 , Issue.2 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 7
    • 0036642734 scopus 로고    scopus 로고
    • A dynamic part-feeding system for an automotive assembly line
    • W. Choi, and Y. Lee A dynamic part-feeding system for an automotive assembly line Computers & Industrial Engineering 43 1-2 2002 123 134
    • (2002) Computers & Industrial Engineering , vol.43 , Issue.12 , pp. 123-134
    • Choi, W.1    Lee, Y.2
  • 8
    • 0035295083 scopus 로고    scopus 로고
    • Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
    • A. Drexl, and A. Kimms Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints Management Science 47 3 2001 480 491
    • (2001) Management Science , vol.47 , Issue.3 , pp. 480-491
    • Drexl, A.1    Kimms, A.2
  • 10
    • 33745684417 scopus 로고    scopus 로고
    • Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm
    • J. Jerald, P. Asokan, and A.D.C. Rani Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm The International Journal of Advanced Manufacturing Technology 29 5-6 2006 584 589
    • (2006) The International Journal of Advanced Manufacturing Technology , vol.29 , Issue.56 , pp. 584-589
    • Jerald, J.1    Asokan, P.2    Rani, A.D.C.3
  • 11
    • 33748920331 scopus 로고    scopus 로고
    • Integrated production and material handling scheduling using mathematical programming and constraint programming
    • G.E. Khayat, A. Langevin, and D. Riopel Integrated production and material handling scheduling using mathematical programming and constraint programming European Journal of Operational Research 175 2006 1818 1832
    • (2006) European Journal of Operational Research , vol.175 , pp. 1818-1832
    • Khayat, G.E.1    Langevin, A.2    Riopel, D.3
  • 13
    • 78149280440 scopus 로고    scopus 로고
    • A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles
    • T. Nishi, Y. Hiranaka, and I.E. Grossmann A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles Computers & Operations Research 38 5 2011 876 888
    • (2011) Computers & Operations Research , vol.38 , Issue.5 , pp. 876-888
    • Nishi, T.1    Hiranaka, Y.2    Grossmann, I.E.3
  • 14
    • 61349139323 scopus 로고    scopus 로고
    • Application of heuristic and hybrid-GASA algorithms to tool-path optimization problem for minimizing airtime during machining
    • C. Oysu, and Z. Bingul Application of heuristic and hybrid-GASA algorithms to tool-path optimization problem for minimizing airtime during machining Engineering Applications of Artificial Intelligence 22 2009 389 396
    • (2009) Engineering Applications of Artificial Intelligence , vol.22 , pp. 389-396
    • Oysu, C.1    Bingul, Z.2
  • 15
    • 0030241635 scopus 로고    scopus 로고
    • A hybrid GA-SA algorithm for just-in-time scheduling of multi-level assemblies
    • A. Roach, and R. Nagi A hybrid GA-SA algorithm for just-in-time scheduling of multi-level assemblies Computers & Industrial Engineering 30 4 1996 1047 1060
    • (1996) Computers & Industrial Engineering , vol.30 , Issue.4 , pp. 1047-1060
    • Roach, A.1    Nagi, R.2
  • 16
    • 0037566323 scopus 로고    scopus 로고
    • Approximative procedures for no-wait job-shop scheduling
    • C.J. Schuster, and J.M. Framinan Approximative procedures for no-wait job-shop scheduling Operations Research Letters 31 2003 308 318
    • (2003) Operations Research Letters , vol.31 , pp. 308-318
    • Schuster, C.J.1    Framinan, J.M.2
  • 18
    • 2942631424 scopus 로고    scopus 로고
    • Object oriented modelling and development of a dispatching algorithm for automated guided vehicles
    • S. Singh, and M. Tiwari Object oriented modelling and development of a dispatching algorithm for automated guided vehicles The International Journal of Advanced Manufacturing Technology 23 9-10 2004 682 695
    • (2004) The International Journal of Advanced Manufacturing Technology , vol.23 , Issue.910 , pp. 682-695
    • Singh, S.1    Tiwari, M.2
  • 19
    • 0035324670 scopus 로고    scopus 로고
    • An effective hybrid optimization strategy for job-shop scheduling problems
    • L. Wang, and D.-Z. Zheng An effective hybrid optimization strategy for job-shop scheduling problems Computers & Operations Research 28 2001 585 596
    • (2001) Computers & Operations Research , vol.28 , pp. 585-596
    • Wang, L.1    Zheng, D.-Z.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.