메뉴 건너뛰기




Volumn 52, Issue 24, 2014, Pages 7529-7548

Balancing and sequencing of stochastic mixed-model assembly U-lines to minimise the expectation of work overload time

Author keywords

balancing and sequencing; mixed model U line; simulated annealing; stochastic; work overload time

Indexed keywords

ASSEMBLY; BENCHMARKING; JUST IN TIME PRODUCTION; MANUFACTURE; NORMAL DISTRIBUTION; SIMULATED ANNEALING; STOCHASTIC PROGRAMMING; STOCHASTIC SYSTEMS;

EID: 84911985273     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2014.944280     Document Type: Article
Times cited : (52)

References (44)
  • 1
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed-model u-shaped disassembly line balancing and sequencing problem
    • Agrawal, S., and M. K. Tiwari. 2008. " A Collaborative Ant Colony Algorithm to Stochastic Mixed-model U-shaped Disassembly Line Balancing and Sequencing Problem. " International Journal of Production Research 46 (6): 1405-1429.
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 3
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solution approaches
    • Battaïa, O., and A. Dolgui. 2012. " A Taxonomy of Line Balancing Problems and their Solution Approaches. " International Journal of Production Economics 142 (2): 259-277.
    • (2012) International Journal of Production Economics , vol.142 , Issue.2 , pp. 259-277
    • Battaïa, O.1    Dolgui, A.2
  • 4
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker, C., and A. Scholl. 2006. " A Survey on Problems and Methods in Generalized Assembly Line Balancing. " European Journal of Operational Research 168 (3): 694-715.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 7
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines: Survey, classification and model critique
    • Boysen, N., M. Fliedner, and A. Scholl. 2009. " Sequencing Mixed-model Assembly Lines: Survey, Classification and Model Critique. " European Journal of Operational Research 192 (2): 349-373.
    • (2009) European Journal of Operational Research , vol.192 , Issue.2 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 8
    • 84867085078 scopus 로고    scopus 로고
    • Mixed-model u-shaped assembly line balancing problems with coincidence memetic algorithm
    • Chutima, P., and P. Olanviwatchai. 2010. " Mixed-model U-shaped Assembly Line Balancing Problems with Coincidence Memetic Algorithm. " Journal of Software Engineering and Applications 3 (4): 347-363.
    • (2010) Journal of Software Engineering and Applications , vol.3 , Issue.4 , pp. 347-363
    • Chutima, P.1    Olanviwatchai, P.2
  • 10
    • 84862191908 scopus 로고    scopus 로고
    • Scenario based robust line balancing: Computational complexity
    • Dolgui, A., and S. Kovalev. 2012. " Scenario Based Robust Line Balancing: Computational Complexity. " Discrete Applied Mathematics 160 (13): 1955-1963.
    • (2012) Discrete Applied Mathematics , vol.160 , Issue.13 , pp. 1955-1963
    • Dolgui, A.1    Kovalev, S.2
  • 12
    • 84870419286 scopus 로고    scopus 로고
    • Stability measure for a generalized assembly line balancing problem
    • Gurevsky, E., O. Battaïa, and A. Dolgui. 2013. " Stability Measure for a Generalized Assembly Line Balancing Problem. " Discrete Applied Mathematics 161 (3): 377-394.
    • (2013) Discrete Applied Mathematics , vol.161 , Issue.3 , pp. 377-394
    • Gurevsky, E.1    Battaïa, O.2    Dolgui, A.3
  • 13
    • 82755160654 scopus 로고    scopus 로고
    • AGenetic algorithm based approach for simultaneously balancing and sequencing of mixed-model u-lines with parallel workstations and zoning constraints
    • Hamzadayi, A., and G. Yildiz. 2012. " AGenetic Algorithm Based Approach for Simultaneously Balancing and Sequencing ofMixed-model U-lines with ParallelWorkstations and Zoning Constraints. " Computers & Industrial Engineering 62 (1): 206-215.
    • (2012) Computers & Industrial Engineering , vol.62 , Issue.1 , pp. 206-215
    • Hamzadayi, A.1    Yildiz, G.2
  • 14
    • 84872462306 scopus 로고    scopus 로고
    • A simulated annealing algorithm based approach for balancing and sequencing of mixed-model u-lines
    • Hamzadayi, A., and G. Yildiz. 2013. " A Simulated Annealing Algorithm Based Approach for Balancing and Sequencing of Mixed-model U-lines. " Computers & Industrial Engineering 64 (2): 669-685.
    • (2013) Computers & Industrial Engineering , vol.64 , Issue.2 , pp. 669-685
    • Hamzadayi, A.1    Yildiz, G.2
  • 15
    • 25144504530 scopus 로고    scopus 로고
    • A heuristic solution for fuzzy mixed-model line balancing problem
    • Hop, N. V. 2006. " A Heuristic Solution for Fuzzy Mixed-model Line Balancing Problem. " European Journal of Operational Research 168 (3): 798-810.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 798-810
    • Hop, N.V.1
  • 16
    • 70449632610 scopus 로고    scopus 로고
    • A multi-decision genetic approach for workload balancing of mixed-model u-shaped assembly line systems
    • Hwang, R., and H. Katayama. 2009. " A Multi-decision Genetic Approach for Workload Balancing of Mixed-model U-shaped Assembly Line Systems. " International Journal of Production Research 47 (14): 3797-3822.
    • (2009) International Journal of Production Research , vol.47 , Issue.14 , pp. 3797-3822
    • Hwang, R.1    Katayama, H.2
  • 17
    • 77956658470 scopus 로고    scopus 로고
    • Integrated procedure of balancing and sequencing for mixed-model assembly lines: A multi-objective evolutionary approach
    • Hwang, R., and H. Katayama. 2010. " Integrated Procedure of Balancing and Sequencing for Mixed-model Assembly Lines: A Multi-Objective Evolutionary Approach. " International Journal of Production Research 48 (21): 6417-6441.
    • (2010) International Journal of Production Research , vol.48 , Issue.21 , pp. 6417-6441
    • Hwang, R.1    Katayama, H.2
  • 19
    • 33846576096 scopus 로고    scopus 로고
    • Balancing and sequencingmixed-model just-in-Timeu-lines with multipleobjectives
    • Kara, Y., U. Ozcan, and A. Peker. 2007. " Balancing and SequencingMixed-model Just-in-TimeU-lines with MultipleObjectives. " Applied Mathematics and Computation 184 (2): 566-588.
    • (2007) Applied Mathematics and Computation , vol.184 , Issue.2 , pp. 566-588
    • Kara, Y.1    Ozcan, U.2    Peker, A.3
  • 20
    • 46149104167 scopus 로고    scopus 로고
    • Line balancing and model sequencing to reduce work overload in mixed-model u-line production environments
    • Kara, Y. 2008. " Line Balancing and Model Sequencing to Reduce Work Overload in Mixed-model U-line Production Environments. " Engineering Optimization 40 (7): 669-684.
    • (2008) Engineering Optimization , vol.40 , Issue.7 , pp. 669-684
    • Kara, Y.1
  • 21
    • 56249109072 scopus 로고    scopus 로고
    • Binary fuzzy goal programming approach to singlemodel straight and u-shapedassembly line balancing
    • Kara, Y., T. Paksoy, and C. T. Chang. 2009. " Binary Fuzzy Goal Programming Approach to SingleModel Straight and U-shapedAssembly Line Balancing. " European Journal of Operational Research 195 (2): 335-347.
    • (2009) European Journal of Operational Research , vol.195 , Issue.2 , pp. 335-347
    • Kara, Y.1    Paksoy, T.2    Chang, C.T.3
  • 22
    • 0034588691 scopus 로고    scopus 로고
    • Balancing and sequencing mixed-model u-lines with a co-evolutionary algorithm
    • Kim, Y. K., S. J. Kim, and J. Y. Kim. 2000. " Balancing and Sequencing Mixed-model U-lines with a Co-evolutionary Algorithm. " Production Planning & Control 11 (8): 754-764.
    • (2000) Production Planning & Control , vol.11 , Issue.8 , pp. 754-764
    • Kim, Y.K.1    Kim, S.J.2    Kim, J.Y.3
  • 23
    • 25144469836 scopus 로고    scopus 로고
    • An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model u-lines
    • Kim, Y. K., J. Y. Kim, and Y. Kim. 2006. " An Endosymbiotic Evolutionary Algorithm for the Integration of Balancing and Sequencing in Mixed-model U-lines. " European Journal of Operational Research 168 (3): 838-852.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 838-852
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.3
  • 24
    • 26444479778 scopus 로고
    • Optimization by simmulated annealing
    • Kirkpatrick Jr., S., D. Gelatt, and M. P. Vecchi. 1983. " Optimization by Simmulated Annealing. " Science 220 (4598): 671-680.
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, D.2    Vecchi, M.P.3
  • 25
    • 84867034634 scopus 로고    scopus 로고
    • A modified colonial competitive algorithm for the mixed-model u-line balancing and sequencing problem
    • Lian, K., C. Zhang, L. Gao, and X. Shao. 2012. " A Modified Colonial Competitive Algorithm for the Mixed-model U-line Balancing and Sequencing Problem. " International Journal of Production Research 50 (18): 5117-5131.
    • (2012) International Journal of Production Research , vol.50 , Issue.18 , pp. 5117-5131
    • Lian, K.1    Zhang, C.2    Gao, L.3    Shao, X.4
  • 30
    • 78650589919 scopus 로고    scopus 로고
    • A genetic algorithm for the stochastic mixed-model u-line balancing and sequencing problem
    • Ozcan, U., T. Kellegoz, and B. Toklu. 2011. " A Genetic Algorithm for the Stochastic Mixed-model U-line Balancing and Sequencing Problem. " International Journal of Production Research 49 (6): 1605-1626.
    • (2011) International Journal of Production Research , vol.49 , Issue.6 , pp. 1605-1626
    • Ozcan, U.1    Kellegoz, T.2    Toklu, B.3
  • 31
    • 0036966648 scopus 로고    scopus 로고
    • State of art of optimization methods for assembly line design
    • Rekiek, B., A. Dolgui, A. Delchambre, and A. Bratcu. 2002. " State of Art of Optimization Methods for Assembly Line Design. " Annual Reviews in Control 26 (2): 163-174.
    • (2002) Annual Reviews in Control , vol.26 , Issue.2 , pp. 163-174
    • Rekiek, B.1    Dolgui, A.2    Delchambre, A.3    Bratcu, A.4
  • 33
    • 25144482035 scopus 로고    scopus 로고
    • State-of-The-Art exact and heuristic solution procedures for simple assembly line balancing
    • Scholl, A., and C. Becker. 2006. " State-of-The-Art Exact and Heuristic Solution Procedures for Simple Assembly Line Balancing. " European Journal of Operational Research 168 (3): 666-693.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 35
    • 25144442374 scopus 로고    scopus 로고
    • Stability analysis of an optimal balance for an assembly line with fixed cycle time
    • Sotskov, Y. N., A. Dolgui, and M. C. Portmann. 2006. " Stability Analysis of an Optimal Balance for an Assembly Line with Fixed Cycle Time. " European Journal of Operational Research 168 (3): 783-797.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 783-797
    • Sotskov, Y.N.1    Dolgui, A.2    Portmann, M.C.3
  • 37
    • 0000423498 scopus 로고
    • Stochastic assembly line balancing using simulated annealing
    • Suresh, G., and S. Sahu. 1994. " Stochastic Assembly Line Balancing Using Simulated Annealing. " International Journal of Production Research 32 (8): 1801-1810.
    • (1994) International Journal of Production Research , vol.32 , Issue.8 , pp. 1801-1810
    • Suresh, G.1    Sahu, S.2
  • 38
    • 0000566084 scopus 로고
    • Mixed model line balancing with smoothed station assignments
    • Thomopoulos, N. T. 1970. " Mixed Model Line Balancing with Smoothed Station Assignments. " Management Science 16 (9): 593-603.
    • (1970) Management Science , vol.16 , Issue.9 , pp. 593-603
    • Thomopoulos, N.T.1
  • 39
    • 77951798581 scopus 로고    scopus 로고
    • An integrated approach to mixed-modelassembly line balancing and sequencing
    • Uddin, M. K., M. C. Soto, and J. L.M. Lastra. 2010. " An Integrated Approach to Mixed-modelAssembly Line Balancing and Sequencing. " Assembly Automation 30 (2): 164-172.
    • (2010) Assembly Automation , vol.30 , Issue.2 , pp. 164-172
    • Uddin, M.K.1    Soto, M.C.2    Lastra, J.L.M.3
  • 42
    • 84862303222 scopus 로고    scopus 로고
    • Multi-objective fuzzy assembly line balancing using genetic algorithms
    • Zacharia, P. T., and A. C. Nearchou. 2012. " Multi-objective Fuzzy Assembly Line Balancing Using Genetic Algorithms. " Journal of Intelligent Manufacturing 23 (3): 615-627.
    • (2012) Journal of Intelligent Manufacturing , vol.23 , Issue.3 , pp. 615-627
    • Zacharia, P.T.1    Nearchou, A.C.2
  • 43
    • 84891804044 scopus 로고    scopus 로고
    • Mixed-model u-line balancing and sequencing in lean production
    • edited by Qi, E., J. Shen, and R. Dou, 10-11 August Germany, Beijing, China, Berlin Heidelberg: Springer
    • Zha, J., and X. Zeng. 2013. " Mixed-model U-line Balancing and Sequencing in Lean Production. " In International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012) Proceedings, edited by Qi, E., J. Shen, and R. Dou, 10-11 August 2012, 479-490. Germany, Beijing, China, Berlin Heidelberg: Springer.
    • (2013) International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012) Proceedings , vol.2012 , pp. 479-490
    • Zha, J.1    Zeng, X.2
  • 44
    • 34548567778 scopus 로고    scopus 로고
    • Modeling and analysis of a mixed-model assembly line with stochastic operation times
    • Zhao, X., J. Liu, K. Ohno, and S. Kotani. 2007. " Modeling and Analysis of a Mixed-model Assembly Line with Stochastic Operation Times. " Naval Research Logistics (NRL) 54 (6): 681-691.
    • (2007) Naval Research Logistics (NRL) , vol.54 , Issue.6 , pp. 681-691
    • Zhao, X.1    Liu, J.2    Ohno, K.3    Kotani, S.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.