메뉴 건너뛰기




Volumn 64, Issue 2, 2013, Pages 669-685

A Simulated Annealing algorithm for a mixed model assembly U-line balancing type-I problem considering human efficiency and Just-In-Time approach

Author keywords

Human Efficiency; Kanban; Make to order; Mixed model assembly line balancing; Pull system; Simulated Annealing

Indexed keywords

ALERT SYSTEMS; BALANCING PROBLEMS; COMPUTATIONAL RESULTS; CONTROL DECISIONS; CONTROL POINT; COOLING SCHEDULE; INITIAL SOLUTION; JUST-IN-TIME APPROACH; KANBAN; KANBAN SYSTEM; LARGE-SCALE PROBLEM; MAKE TO ORDER; MIXED MODELS; MIXED-MODEL ASSEMBLY LINES; MIXED-MODEL U-LINE; NEIGHBORHOOD SEARCH; PROCESSING TIME; PULL SYSTEMS; RESEARCH PAPERS; SA ALGORITHM; SIMULATED ANNEALING ALGORITHMS; SKILL LEVELS; U-LINE BALANCING; WORK STATION;

EID: 84872462306     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2012.11.010     Document Type: Article
Times cited : (93)

References (53)
  • 1
    • 0031238178 scopus 로고    scopus 로고
    • A parametric procedure for multicriterion sequence scheduling for Just-In-Time mixed-model assembly lines
    • H. Aigbedo, and Y. Monden A parametric procedure for multi criterion sequence scheduling for just-in-time mixed-model assembly lines International Journal of Production Research 35 1997 2543 2564 (Pubitemid 127560028)
    • (1997) International Journal of Production Research , vol.35 , Issue.9 , pp. 2543-2564
    • Aigbedo, H.1    Monden, Y.2
  • 2
    • 33748063302 scopus 로고    scopus 로고
    • Design and analysis of production control scheme for Kanban-based JIT environment
    • Mohammad D. Al-Tahat, and Adnan M. Mukattash Design and analysis of production control scheme for Kanban-based JIT environment Journal of the Franklin Institute 343 2006 521 531
    • (2006) Journal of the Franklin Institute , vol.343 , pp. 521-531
    • Al-Tahat, M.D.1    Mukattash, A.M.2
  • 3
    • 0001188971 scopus 로고
    • Genetic algorithms for combinatorial optimization: The assemble line balancing problem
    • E.J. Anderson, and M.C. Ferris Genetic algorithms for combinatorial optimization: The assemble line balancing problem ORSA Journal on Computing 6 2 1994 61
    • (1994) ORSA Journal on Computing , vol.6 , Issue.2 , pp. 61
    • Anderson, E.J.1    Ferris, M.C.2
  • 4
    • 67651146397 scopus 로고    scopus 로고
    • Defining inventory control points in multiproduct stochastic pull systems
    • R.G. Askin, and S. Krishnan Defining inventory control points in multiproduct stochastic pull systems International Journal of Production Economics 120 2009 418 429
    • (2009) International Journal of Production Economics , vol.120 , pp. 418-429
    • Askin, R.G.1    Krishnan, S.2
  • 5
    • 0022768294 scopus 로고
    • Survey of exact algorithms for the simple assembly line balancing problem
    • I. Baybars A survey of exact algorithms for the simple assembly line balancing problem Management Science 32 1986 909 932 (Pubitemid 16612186)
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars Ilker1
  • 6
    • 33645509107 scopus 로고    scopus 로고
    • Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems
    • A. Baykasoglu Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems Journal of Intelligent Manufacturing 17 2006 217 232
    • (2006) Journal of Intelligent Manufacturing , vol.17 , pp. 217-232
    • Baykasoglu, A.1
  • 8
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • DOI 10.1016/j.ejor.2004.07.023, PII S0377221704004801, Balancing Assembly and Transfer Lines
    • C. Becker, and A. Scholl A survey on problems and methods in generalized assembly line balancing European Journal of Operational Research 168 2006 694 715 (Pubitemid 41336587)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 9
    • 0001429020 scopus 로고
    • A comparison of just in time and batch manufacturing the role of performance obstacles
    • K.A. Brown, and T.R. Mitchell A comparison of just in time and batch manufacturing the role of performance obstacles The Academy of Management Journal 34 4 1991 906 917
    • (1991) The Academy of Management Journal , vol.34 , Issue.4 , pp. 906-917
    • Brown, K.A.1    Mitchell, T.R.2
  • 11
    • 0035944508 scopus 로고    scopus 로고
    • Effect of kanban size on just-in-time manufacturing systems
    • DOI 10.1016/S0924-0136(01)01022-6, PII S0924013601010226
    • F.T.S. Chan effect of kanban size on just-in-time manufacturing systems Journal of Materials Processing Technology 116 2001 146 160 (Pubitemid 32975576)
    • (2001) Journal of Materials Processing Technology , vol.116 , Issue.2-3 , pp. 146-160
    • Chan, F.T.S.1
  • 13
    • 84867085078 scopus 로고    scopus 로고
    • Mixed-model U-shaped assembly line balancing problems with coincidence Memetic algorithm
    • P. Chutima, and P. Olanviwatchai Mixed-model U-shaped assembly line balancing problems with coincidence Memetic algorithm Journal of Software Engineering & Applications 3 2010 347 363
    • (2010) Journal of Software Engineering & Applications , vol.3 , pp. 347-363
    • Chutima, P.1    Olanviwatchai, P.2
  • 15
    • 0032043473 scopus 로고    scopus 로고
    • Binary integer formulation for mixed-model assembly line balancing problem
    • PII S0360835297001423
    • E. Erel, and H. Gokcen Binary integer formulation for mixed-model assembly line balancing problem Computers & Industrial Engineering 23 1998 451 461 (Pubitemid 128458251)
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.2-4 , pp. 451-461
    • Gokcen, H.1    Erel, E.2
  • 16
    • 0032677007 scopus 로고    scopus 로고
    • Shortest-route formulation of mixed-model assembly line balancing problem
    • E. Erel, and H. Gokcen Shortest-route formulation of mixed-model assembly line balancing problem European Journal of Operational Research 116 1999 194 204
    • (1999) European Journal of Operational Research , vol.116 , pp. 194-204
    • Erel, E.1    Gokcen, H.2
  • 17
    • 0035840757 scopus 로고    scopus 로고
    • Balancing of U-type assembly systems using simulated annealing
    • DOI 10.1080/00207540110051905
    • E. Erel, I. Sabuncuoglu, and B.A. Aksu Balancing of U-type assembly systems using simulated annealing International Journal of Production Research 39 13 2001 3003 3015 (Pubitemid 35165557)
    • (2001) International Journal of Production Research , vol.39 , Issue.13 , pp. 3003-3015
    • Erel, E.1    Sabuncuoglu, I.2    Aksu, B.A.3
  • 18
    • 17444382729 scopus 로고    scopus 로고
    • A review and comparison of hybrid and pull-type production control strategies
    • DOI 10.1007/s00291-005-0204-z
    • John Geraghty, and Cathal Heavey A review and comparison of hybrid and pull-type production control strategies OR Spectrum 27 2005 435 457 (Pubitemid 40550383)
    • (2005) OR Spectrum , vol.27 , Issue.2-3 , pp. 435-457
    • Geraghty, J.1    Heavey, C.2
  • 19
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • S. Ghosh, and R.J. Gagnon A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems International Journal of Production Research 27 1989 637 670
    • (1989) International Journal of Production Research , vol.27 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 21
    • 0001474336 scopus 로고
    • An algorithm for the line balancing problem
    • A.L. Gutjahr, and G.L. Nemhauser An algorithm for the line balancing problem Management Science 11 2 1964 308 315
    • (1964) Management Science , vol.11 , Issue.2 , pp. 308-315
    • Gutjahr, A.L.1    Nemhauser, G.L.2
  • 25
    • 35348949412 scopus 로고    scopus 로고
    • A station-oriented enumerative algorithm for two-sided assembly line balancing
    • DOI 10.1016/j.ejor.2007.01.022, PII S0377221707001427
    • X.-F. Hu, E.-F. Wu, and Y. Jin A station-oriented enumerative algorithm for two-sided assembly line balancing European Journal of Operational Research 186 2008 435 440 (Pubitemid 47600522)
    • (2008) European Journal of Operational Research , vol.186 , Issue.1 , pp. 435-440
    • Hu, X.1    Wu, E.2    Jin, Y.3
  • 26
    • 0037210110 scopus 로고    scopus 로고
    • A new heuristic method for mixed model assembly line balancing problem
    • M. Jin, and S.D. Wu A new heuristic method for mixed model assembly line balancing problem Computers & Industrial Engineering 44 2002 159 169
    • (2002) Computers & Industrial Engineering , vol.44 , pp. 159-169
    • Jin, M.1    Wu, S.D.2
  • 27
    • 0037508541 scopus 로고    scopus 로고
    • Assembly line balancing in a mixed-model sequencing environment with synchronous transfers
    • S. Karabati, and S. Sayin Assembly line balancing in a mixed-model sequencing environment with synchronous transfers European Journal of Operational Research 149 2003 417 429
    • (2003) European Journal of Operational Research , vol.149 , pp. 417-429
    • Karabati, S.1    Sayin, S.2
  • 28
    • 0030192703 scopus 로고    scopus 로고
    • Genetic algorithms for assembly line balancing with various objectives
    • DOI 10.1016/0360-8352(96)00009-5
    • Y.K. Kim, Y.J. Kim, and Y. Kim Genetic algorithms for assembly line balancing with various objectives Computers & Industrial Engineering 30 3 1996 397 409 (Pubitemid 126393347)
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.SPEC. ISS.3 , pp. 397-409
    • Kim, Y.K.1    Kim, Y.J.2    Kim, Y.3
  • 29
    • 53749096405 scopus 로고    scopus 로고
    • A mathematical model and a genetic algorithm for two-sided assembly line balancing
    • Y.K. Kim, W.S. Song, and J.H. Kim A mathematical model and a genetic algorithm for two-sided assembly line balancing Computers & Operations Research 36 3 2009 853 865
    • (2009) Computers & Operations Research , vol.36 , Issue.3 , pp. 853-865
    • Kim, Y.K.1    Song, W.S.2    Kim, J.H.3
  • 31
    • 25144457210 scopus 로고    scopus 로고
    • Balancing assembly lines with tabu search
    • DOI 10.1016/j.ejor.2004.07.031, PII S0377221704004886, Balancing Assembly and Transfer Lines
    • S.D. Lapierre, A. Ruiz, and P. Soriano Balancing assembly lines with tabu search European Journal of Operational Research 168 3 2006 826 837 (Pubitemid 41336595)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 826-837
    • Lapierre, S.D.1    Ruiz, A.2    Soriano, P.3
  • 32
    • 0035399914 scopus 로고    scopus 로고
    • Two-sided assembly line balancing to maximize work relatedness and slackness
    • DOI 10.1016/S0360-8352(01)00029-8, PII S0360835201000298
    • T.O. Lee, Y. Kim, and Y.K. Kim Two-sided assembly line balancing to maximize work relatedness and slackness Computers & Industrial Engineering 40 2001 273 292 (Pubitemid 32573629)
    • (2001) Computers and Industrial Engineering , vol.40 , Issue.3 , pp. 273-292
    • Lee, T.O.1    Kim, Y.2    Kim, Y.K.3
  • 33
    • 0015483845 scopus 로고
    • Production-line balances for mixed model lines
    • March-April, 93-103.
    • J.L.C. Macaskill Production-line balances for mixed model lines Management Science 19 1972 423 434 March-April, 93-103.
    • (1972) Management Science , vol.19 , pp. 423-434
    • MacAskill, J.L.C.1
  • 34
    • 0032188659 scopus 로고    scopus 로고
    • Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
    • P.R. McMullen, and G.V. Frazier Using simulated annealing to solve a multi-objective assembly line balancing problem with parallel work stations International Journal of Production Research 36 10 1998 2717 2741 (Pubitemid 128553169)
    • (1998) International Journal of Production Research , vol.36 , Issue.10 , pp. 2717-2741
    • McMullen, P.R.1    Frazier, G.V.2
  • 38
    • 0029256465 scopus 로고
    • Evaluating assembly sequences for automatic assembly system
    • L.C. Schmidt, and J. Jackman Evaluating assembly sequences for automatic assembly system IIE Transactions 27 1 1995 23 31
    • (1995) IIE Transactions , vol.27 , Issue.1 , pp. 23-31
    • Schmidt, L.C.1    Jackman, J.2
  • 40
    • 78649835376 scopus 로고    scopus 로고
    • A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks
    • S.A. Seyed-Alagheband, S.M.T. FatemiGhomi, and M. Zandieh A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks International Journal of Production Research 49 2011 805 825
    • (2011) International Journal of Production Research , vol.49 , pp. 805-825
    • Seyed-Alagheband, S.A.1    Fatemighomi, S.M.T.2    Zandieh, M.3
  • 41
    • 0034659589 scopus 로고    scopus 로고
    • A labour-constrained model for aggregate production planning
    • DOI 10.1080/002075400188546
    • J.P. Silva, J. Lisboa, and P. Huang A labour constrained model for aggregate production planning International Journal of Production Research 38 9 2000 2143 2152 (Pubitemid 35401866)
    • (2000) International Journal of Production Research , vol.38 , Issue.9 , pp. 2143-2152
    • Silva, J.P.1    Lisboa, J.2    Huang, P.3
  • 42
    • 10444289741 scopus 로고    scopus 로고
    • A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II
    • A.S. Simaria, and P.M. Vilarinho A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II Computers & Industrial Engineering 47 2004 391 407
    • (2004) Computers & Industrial Engineering , vol.47 , pp. 391-407
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 43
    • 59349112769 scopus 로고    scopus 로고
    • 2-ANTBAL: An ant colony optimization algorithm for balancing two-sided assembly lines
    • S. Simaria, and M. Vilarinho 2-ANTBAL: An ant colony optimization algorithm for balancing two-sided assembly lines Computers & Industrial Engineering 56 2009 489 506
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 489-506
    • Simaria, S.1    Vilarinho, M.2
  • 44
    • 0017557653 scopus 로고
    • Toyota production system and kanban system. materialization of just-in-time and respect-for-human system
    • Y. Sugimori Toyota production system and kanban system - materialization of just in time and respect for human system International Journal of Production Research 15 6 1977 553 564 (Pubitemid 8573924)
    • (1977) International Journal of Production Research , vol.15 , Issue.6 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 45
    • 0000423498 scopus 로고
    • Stochastic assembly line balancing using simulated annealing
    • G. Suresh, and S. Sahu Stochastic assembly line balancing using simulated annealing International Journal of Production Research 32 8 1994 1801 1810
    • (1994) International Journal of Production Research , vol.32 , Issue.8 , pp. 1801-1810
    • Suresh, G.1    Sahu, S.2
  • 46
    • 33745870883 scopus 로고    scopus 로고
    • A master scheduling model with skilled and unskilled temporary workers
    • DOI 10.1016/j.ijpe.2005.11.009, PII S0925527306001010
    • Atthawit Techawiboonwonga, Pisal Yenradeea, and Sanchoy K. Das A master scheduling model with skilled and unskilled temporary workers International Journal of Production Economics 103 2006 798 809 (Pubitemid 44038508)
    • (2006) International Journal of Production Economics , vol.103 , Issue.2 , pp. 798-809
    • Techawiboonwong, A.1    Yenradee, P.2    Das, S.K.3
  • 48
    • 0000566084 scopus 로고
    • Mixed model line balancing with smoothed station assignments
    • N.T. Thomopoulos Mixed model line balancing with smoothed station assignments Management Science 16 1970 593 603
    • (1970) Management Science , vol.16 , pp. 593-603
    • Thomopoulos, N.T.1
  • 49
    • 0037091985 scopus 로고    scopus 로고
    • A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
    • DOI 10.1080/00207540110116273
    • P.M. Vilarinho, and A.S. Simaria A two-stage heuristic method for balancing mixed-model assembly lines with parallel work stations International Journal of Production Research 40 6 2002 1405 1420 (Pubitemid 34593779)
    • (2002) International Journal of Production Research , vol.40 , Issue.6 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 50
    • 29344441733 scopus 로고    scopus 로고
    • ANTBAL: An ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations
    • DOI 10.1080/00207540500227612, PII G61382113X144158
    • P.M. Vilarinho, and A.S. Simaria ANTBAL: an ant colony optimization algorithm for balancing mixed-model assembly lines with parallel work stations International Journal of Production Research 44 2 2006 291 303 (Pubitemid 43000408)
    • (2006) International Journal of Production Research , vol.44 , Issue.2 , pp. 291-303
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 52
    • 0003463029 scopus 로고
    • The Story of Lean Production. Rawson/Harper Perennial, NewYork
    • Womack J. P. et al. (1991). The machine that change the world. The Story of Lean Production. Rawson/Harper Perennial, NewYork.
    • (1991) The Machine That Change the World
    • Womack, J.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.