-
1
-
-
79955916213
-
An advanced multi objective genetic algorithm design for the time and space assembly line balancing problem
-
Chica M, Cordón Ó, Damas S. An advanced multi objective genetic algorithm design for the time and space assembly line balancing problem. Computers & Industrial Engineering, 2011, 61(1): 103–117
-
(2011)
Computers & Industrial Engineering
, vol.61
, Issue.1
, pp. 103-117
-
-
Chica, M.1
Cordón2
Damas, S.3
-
2
-
-
84869496192
-
A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect
-
Hamta N, Fatemi Ghomi S M T, Jolai F, Akbarpour Shirazi M. A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect. International Journal of Production Economics, 2013, 141(1): 99–111
-
(2013)
International Journal of Production Economics
, vol.141
, Issue.1
, pp. 99-111
-
-
Hamta, N.1
Fatemi Ghomi, S.M.T.2
Jolai, F.3
Akbarpour Shirazi, M.4
-
3
-
-
0033745068
-
A multiobjective genetic algorithm for solving assembly line balancing problem
-
Ponnambalam S G, Aravindan P, Mogileeswar Naidu G. A multiobjective genetic algorithm for solving assembly line balancing problem. International Journal of Advanced Manufacturing Technology, 2000, 16(5): 341–352
-
(2000)
International Journal of Advanced Manufacturing Technology
, vol.16
, Issue.5
, pp. 341-352
-
-
Ponnambalam, S.G.1
Aravindan, P.2
Mogileeswar Naidu, G.3
-
4
-
-
80053189489
-
A solution procedure for type E-simple assembly line balancing problem
-
Wei N C, Chao I M. A solution procedure for type E-simple assembly line balancing problem. Computers & Industrial Engineering, 2011, 61(3): 824–830
-
(2011)
Computers & Industrial Engineering
, vol.61
, Issue.3
, pp. 824-830
-
-
Wei, N.C.1
Chao, I.M.2
-
5
-
-
0025603598
-
An efficient heuristic for solving stochastic assembly line balancing problems
-
Shin D. An efficient heuristic for solving stochastic assembly line balancing problems. Computers & Industrial Engineering, 1990, 18(3): 285–295
-
(1990)
Computers & Industrial Engineering
, vol.18
, Issue.3
, pp. 285-295
-
-
Shin, D.1
-
6
-
-
79751537157
-
Multi-objective optimization of a stochastic assembly line balancing: a hybrid simulated annealing algorithm
-
Cakir B, Altiparmak F, Dengiz B. Multi-objective optimization of a stochastic assembly line balancing: a hybrid simulated annealing algorithm. Computers & Industrial Engineering, 2011, 60(3): 376–384
-
(2011)
Computers & Industrial Engineering
, vol.60
, Issue.3
, pp. 376-384
-
-
Cakir, B.1
Altiparmak, F.2
Dengiz, B.3
-
7
-
-
29344438441
-
Multi-objective assembly line balancing via a modified ant colony optimization technique
-
McMullen P R, Tarasewich P. Multi-objective assembly line balancing via a modified ant colony optimization technique. International Journal of Production Research, 2006, 44(1): 27–42
-
(2006)
International Journal of Production Research
, vol.44
, Issue.1
, pp. 27-42
-
-
McMullen, P.R.1
Tarasewich, P.2
-
8
-
-
84876972240
-
Multi-objective optimization of stochastic disassembly line balancing with station paralleling
-
Aydemir-Karadag A, Turkbey O. Multi-objective optimization of stochastic disassembly line balancing with station paralleling. Computers & Industrial Engineering, 2013, 65(3): 413–425
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.3
, pp. 413-425
-
-
Aydemir-Karadag, A.1
Turkbey, O.2
-
9
-
-
25144504530
-
A heuristic solution for fuzzy mixed-model line balancing problem
-
Hop N V. A heuristic solution for fuzzy mixed-model line balancing problem. European Journal of Operational Research, 2006, 168(3): 798–810
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 798-810
-
-
Hop, N.V.1
-
10
-
-
60749129511
-
Mixed model assembly line balancing problem with fuzzy operation times and drifting operations
-
Xu W, Xiao T. Mixed model assembly line balancing problem with fuzzy operation times and drifting operations. In: Proceeding of Winter Simulation Conference, Miami, FL, USA, 2008, 1752–1760
-
(2008)
In: Proceeding of Winter Simulation Conference, Miami, FL, USA
, pp. 1752-1760
-
-
Xu, W.1
Xiao, T.2
-
11
-
-
0030422390
-
Fuzzy assembly line balancing using genetic algorithms
-
Gen M, Tsujimura Y, Li Y. Fuzzy assembly line balancing using genetic algorithms. Computers & Industrial Engineering, 1996, 31(3–4): 631–634
-
(1996)
Computers & Industrial Engineering
, vol.31
, Issue.3-4
, pp. 631-634
-
-
Gen, M.1
Tsujimura, Y.2
Li, Y.3
-
12
-
-
56249109072
-
Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing
-
Kara Y, Paksoy T, Chang C T. Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing. European Journal of Operational Research, 2009, 195(2): 335–347
-
(2009)
European Journal of Operational Research
, vol.195
, Issue.2
, pp. 335-347
-
-
Kara, Y.1
Paksoy, T.2
Chang, C.T.3
-
14
-
-
79958174505
-
Strategic robust mixed model assembly line balancing based on scenario planning
-
Xu W, Xiao T. Strategic robust mixed model assembly line balancing based on scenario planning. Tsinghua Science and Technology, 2011, 16(3): 308–314
-
(2011)
Tsinghua Science and Technology
, vol.16
, Issue.3
, pp. 308-314
-
-
Xu, W.1
Xiao, T.2
-
15
-
-
35349001644
-
Scenario relaxation algorithm for finite scenario-based min-max regret and min-max relative regret robust optimization
-
Assavapokee T, Realff M J, Ammons J C, Hong I H. Scenario relaxation algorithm for finite scenario-based min-max regret and min-max relative regret robust optimization. Computers & Operations Research, 2008, 35(6): 2093–2102
-
(2008)
Computers & Operations Research
, vol.35
, Issue.6
, pp. 2093-2102
-
-
Assavapokee, T.1
Realff, M.J.2
Ammons, J.C.3
Hong, I.H.4
-
16
-
-
69749108455
-
Robustness in operational research and decision aiding: a multi-faceted issue
-
Roy B. Robustness in operational research and decision aiding: a multi-faceted issue. European Journal of Operational Research, 2010, 200(3): 629–638
-
(2010)
European Journal of Operational Research
, vol.200
, Issue.3
, pp. 629-638
-
-
Roy, B.1
-
17
-
-
79960918926
-
Locating a competitive facility in the plane with a robustness criterion
-
Blanquero R, Carrizosa E, Hendrix E M T. Locating a competitive facility in the plane with a robustness criterion. European Journal of Operational Research, 2011, 215(1): 21–24
-
(2011)
European Journal of Operational Research
, vol.215
, Issue.1
, pp. 21-24
-
-
Blanquero, R.1
Carrizosa, E.2
Hendrix, E.M.T.3
-
18
-
-
84862191908
-
Scenario based robust line balancing: Computational complexity
-
Dolgui A, Kovalev S. Scenario based robust line balancing: Computational complexity. Discrete Applied Mathematics, 2012, 160(13–14): 1955–1963
-
(2012)
Discrete Applied Mathematics
, vol.160
, Issue.13-14
, pp. 1955-1963
-
-
Dolgui, A.1
Kovalev, S.2
-
19
-
-
84876104666
-
Assembly line balancing under uncertainty: Robust optimization models and exact solution method
-
Hazir Ö, Dolgui A. Assembly line balancing under uncertainty: Robust optimization models and exact solution method. Computers & Industrial Engineering, 2013, 65(2): 261–267
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.2
, pp. 261-267
-
-
Hazir1
Dolgui, A.2
-
20
-
-
0031268742
-
β-Robust scheduling for single-machine systems with uncertain processing times
-
Daniels R L, Carrillo J E. β-Robust scheduling for single-machine systems with uncertain processing times. IIE Transactions, 1997, 29(11): 977–985
-
(1997)
IIE Transactions
, vol.29
, Issue.11
, pp. 977-985
-
-
Daniels, R.L.1
Carrillo, J.E.2
-
21
-
-
77949496571
-
Scheduling with uncertain processing times: applying β-robust schedule on two-machine flowshop with constraints
-
Saif U, Liu Q, Zhang C Y, Yasser R. Scheduling with uncertain processing times: applying β-robust schedule on two-machine flowshop with constraints. Proceedings of IEEM, 2009, 1946–1951
-
(2009)
Proceedings of IEEM
, pp. 1946-1951
-
-
Saif, U.1
Liu, Q.2
Zhang, C.Y.3
Yasser, R.4
-
22
-
-
79960982986
-
An improved genetic algorithm for robust permutation flowshop scheduling
-
Liu Q, Ullah S, Zhang C Y. An improved genetic algorithm for robust permutation flowshop scheduling. International Journal of Advanced Manufacturing Technology, 2011, 56(1–4): 345–354
-
(2011)
International Journal of Advanced Manufacturing Technology
, vol.56
, Issue.1-4
, pp. 345-354
-
-
Liu, Q.1
Ullah, S.2
Zhang, C.Y.3
-
23
-
-
33646348751
-
Facility location under uncertainty: a review
-
Snyder L. Facility location under uncertainty: a review. IIE Transactions, 2006, 38(7): 547–554
-
(2006)
IIE Transactions
, vol.38
, Issue.7
, pp. 547-554
-
-
Snyder, L.1
-
24
-
-
84859765320
-
Lexicographic α-robustness: An alternative to min-max criteria
-
Kalai R, Lamboray C, Vanderpooten D. Lexicographic α-robustness: An alternative to min-max criteria. European Journal of Operational Research, 2012, 220(3): 722–728
-
(2012)
European Journal of Operational Research
, vol.220
, Issue.3
, pp. 722-728
-
-
Kalai, R.1
Lamboray, C.2
Vanderpooten, D.3
-
25
-
-
0036530772
-
A fast and elitist multi objective genetic algorithm: NSGA-II
-
Deb K, Pratap A, Agarwal S, Meyarivan T. A fast and elitist multi objective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation, 2002, 6(2): 182–197
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
26
-
-
37349007853
-
Assembly line balancing: Which model to use when?
-
Boysen N, Fliedner M, Scholl A. Assembly line balancing: Which model to use when? International Journal of Production Economics, 2008, 111(2): 509–528
-
(2008)
International Journal of Production Economics
, vol.111
, Issue.2
, pp. 509-528
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
|