메뉴 건너뛰기




Volumn , Issue , 2009, Pages 1946-1950

Scheduling with uncertain processsing times: Applying β-robust schedule on two-machine flow-shop with constraints

Author keywords

Robust schedule; Constraints; Flow shop scheduling; Risk; Schedule performance

Indexed keywords

COMPLETION TIME; CONSTRAINT-BASED; FLOW-SHOP SCHEDULING; FLOW-SHOPS; FLOW-TIME; MANUFACTURING COMPANIES; MAXIMUM PROBABILITY; ON-MACHINES; PERFORMANCE LEVEL; PERFORMANCE MEASURE; PROCESSING TIME; PRODUCTION EXPENSE; PRODUCTION RATES; SCHEDULE PERFORMANCE;

EID: 77949496571     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/IEEM.2009.5373216     Document Type: Conference Paper
Times cited : (4)

References (15)
  • 1
    • 0033894477 scopus 로고    scopus 로고
    • Robust scheduling of a two-machine flow shop with uncertain processing times
    • Panos Kouvelis, Richard L. Daniels and George Vairaktarakis, "Robust scheduling of a two-machine flow shop with uncertain processing times," IIE Transactions, vol. 32, no. 5, pp. 421-432, 2000.
    • (2000) IIE Transactions , vol.32 , Issue.5 , pp. 421-432
    • Kouvelis, P.1    Daniels, R.L.2    Vairaktarakis, G.3
  • 2
    • 0038479948 scopus 로고    scopus 로고
    • Generating robust and flexible job shop schedules using genetic algorithms
    • Mikkel T. Jensen, "Generating robust and flexible job shop schedules using genetic algorithms," IEEE transactions on evolutionary computation, vol. 7, no. 3, pp. 275-288, 2003.
    • (2003) IEEE transactions on evolutionary computation , vol.7 , Issue.3 , pp. 275-288
    • Jensen, M.T.1
  • 3
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • Richard L. Daniels and Panagiotis Kouvelis, "Robust scheduling to hedge against processing time uncertainty in single-stage production," Management Science, vol. 41, no. 2, pp. 363-376, 1995.
    • (1995) Management Science , vol.41 , Issue.2 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 4
    • 36148970840 scopus 로고    scopus 로고
    • Goren, Selcuk Sabuncuoglu and Ihsan, Robustness and stability measures for scheduling: single-machine environment, IIE Transactions, 2008.
    • Goren, Selcuk Sabuncuoglu and Ihsan, "Robustness and stability measures for scheduling: single-machine environment," IIE Transactions, 2008.
  • 5
    • 34249904369 scopus 로고    scopus 로고
    • A robust approach for the single machine scheduling problem
    • Cyril Briand, H. Trung La and Jacques Erschler, "A robust approach for the single machine scheduling problem," Journal of Scheduling, vol. 10, no. 3, pp. 209-22, 2007.
    • (2007) Journal of Scheduling , vol.10 , Issue.3 , pp. 209-222
    • Cyril Briand, H.1    Trung, L.2    Erschler, J.3
  • 6
    • 0031268742 scopus 로고    scopus 로고
    • β-Robust scheduling for single-machine systems with uncertain processing times
    • Richard l. Daniels and Janice E. Carrill, "β-Robust scheduling for single-machine systems with uncertain processing times," IIE Transactions, vol. 29, pp. 977-985, 1997.
    • (1997) IIE Transactions , vol.29 , pp. 977-985
    • Daniels, R.L.1    Carrill, J.E.2
  • 7
    • 58549094698 scopus 로고    scopus 로고
    • Scheduling with uncertain durations: Modeling β-robust scheduling with constraints
    • Christine Wei Wu, Kenneth N. Brown, and J. Christopher Beck, "Scheduling with uncertain durations: modeling β-robust scheduling with constraints," Computers & Operations Research, vol. 36, no. 8, pp. 2348-2356, 2009.
    • (2009) Computers & Operations Research , vol.36 , Issue.8 , pp. 2348-2356
    • Wei Wu, C.1    Kenneth, N.2    Brown3    Christopher Beck, J.4
  • 8
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • S.M. Johnson, "Optimal two- and three-stage production schedules with setup times included," Naval Res. Logist, vol. 1, no. 1, pp. 61-68, 1954.
    • (1954) Naval Res. Logist , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 10
    • 0022569338 scopus 로고
    • On Johnson's two-machine flowshop with random processing times
    • Peng Sheng Ku and Shun Chen Nu, "On Johnson's two-machine flowshop with random processing times," operations research, vol. 34, pp. 130-136, 1986.
    • (1986) operations research , vol.34 , pp. 130-136
    • Peng, S.1    Chen Nu, S.2
  • 11
    • 0037081993 scopus 로고    scopus 로고
    • A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
    • J. Balasubramanian and I.E. Grossmann, "A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times," Computers and Chemical Engineering, vol. 26, no. 1, pp. 41-57, 2002.
    • (2002) Computers and Chemical Engineering , vol.26 , Issue.1 , pp. 41-57
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 12
    • 45049088287 scopus 로고    scopus 로고
    • Reliability modeling and analysis of serial-parallel hybrid multi-operational manufacturing system considering dimensional quality, tool degradation and system configuration
    • Ji-wen Sun, Li-feng Xi, Shi-chang Du and Bo Ju, "Reliability modeling and analysis of serial-parallel hybrid multi-operational manufacturing system considering dimensional quality, tool degradation and system configuration," Int. J. Production Economics, vol. 114, pp. 149-164, 2008.
    • (2008) Int. J. Production Economics , vol.114 , pp. 149-164
    • Sun, J.-W.1    Xi, L.-F.2    Du, S.-C.3    Ju, B.4
  • 15
    • 0002217386 scopus 로고
    • Quicksort
    • C.A.R. Hoare, "Quicksort," Comput. J. vol. 5, no. 1, pp. 10-15, 1962.
    • (1962) Comput. J , vol.5 , Issue.1 , pp. 10-15
    • Hoare, C.A.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.