-
1
-
-
0033894477
-
Robust scheduling of a two-machine flow shop with uncertain processing times
-
Panos Kouvelis, Richard L. Daniels and George Vairaktarakis, "Robust scheduling of a two-machine flow shop with uncertain processing times," IIE Transactions, vol. 32, no. 5, pp. 421-432, 2000.
-
(2000)
IIE Transactions
, vol.32
, Issue.5
, pp. 421-432
-
-
Kouvelis, P.1
Daniels, R.L.2
Vairaktarakis, G.3
-
2
-
-
0038479948
-
Generating robust and flexible job shop schedules using genetic algorithms
-
Mikkel T. Jensen, "Generating robust and flexible job shop schedules using genetic algorithms," IEEE transactions on evolutionary computation, vol. 7, no. 3, pp. 275-288, 2003.
-
(2003)
IEEE transactions on evolutionary computation
, vol.7
, Issue.3
, pp. 275-288
-
-
Jensen, M.T.1
-
3
-
-
0029254356
-
Robust scheduling to hedge against processing time uncertainty in single-stage production
-
Richard L. Daniels and Panagiotis Kouvelis, "Robust scheduling to hedge against processing time uncertainty in single-stage production," Management Science, vol. 41, no. 2, pp. 363-376, 1995.
-
(1995)
Management Science
, vol.41
, Issue.2
, pp. 363-376
-
-
Daniels, R.L.1
Kouvelis, P.2
-
4
-
-
36148970840
-
-
Goren, Selcuk Sabuncuoglu and Ihsan, Robustness and stability measures for scheduling: single-machine environment, IIE Transactions, 2008.
-
Goren, Selcuk Sabuncuoglu and Ihsan, "Robustness and stability measures for scheduling: single-machine environment," IIE Transactions, 2008.
-
-
-
-
5
-
-
34249904369
-
A robust approach for the single machine scheduling problem
-
Cyril Briand, H. Trung La and Jacques Erschler, "A robust approach for the single machine scheduling problem," Journal of Scheduling, vol. 10, no. 3, pp. 209-22, 2007.
-
(2007)
Journal of Scheduling
, vol.10
, Issue.3
, pp. 209-222
-
-
Cyril Briand, H.1
Trung, L.2
Erschler, J.3
-
6
-
-
0031268742
-
β-Robust scheduling for single-machine systems with uncertain processing times
-
Richard l. Daniels and Janice E. Carrill, "β-Robust scheduling for single-machine systems with uncertain processing times," IIE Transactions, vol. 29, pp. 977-985, 1997.
-
(1997)
IIE Transactions
, vol.29
, pp. 977-985
-
-
Daniels, R.L.1
Carrill, J.E.2
-
7
-
-
58549094698
-
Scheduling with uncertain durations: Modeling β-robust scheduling with constraints
-
Christine Wei Wu, Kenneth N. Brown, and J. Christopher Beck, "Scheduling with uncertain durations: modeling β-robust scheduling with constraints," Computers & Operations Research, vol. 36, no. 8, pp. 2348-2356, 2009.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.8
, pp. 2348-2356
-
-
Wei Wu, C.1
Kenneth, N.2
Brown3
Christopher Beck, J.4
-
8
-
-
0003075019
-
Optimal two- and three-stage production schedules with setup times included
-
S.M. Johnson, "Optimal two- and three-stage production schedules with setup times included," Naval Res. Logist, vol. 1, no. 1, pp. 61-68, 1954.
-
(1954)
Naval Res. Logist
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
9
-
-
0024112269
-
A recent survey of production scheduling
-
F.A.Rodammer and K. Preston White, "A recent survey of production scheduling," IEEE Transaction on Systems, Man and Cybernetics, vol. 18, pp. 841-851, 1988.
-
(1988)
IEEE Transaction on Systems, Man and Cybernetics
, vol.18
, pp. 841-851
-
-
Rodammer, F.A.1
Preston White, K.2
-
10
-
-
0022569338
-
On Johnson's two-machine flowshop with random processing times
-
Peng Sheng Ku and Shun Chen Nu, "On Johnson's two-machine flowshop with random processing times," operations research, vol. 34, pp. 130-136, 1986.
-
(1986)
operations research
, vol.34
, pp. 130-136
-
-
Peng, S.1
Chen Nu, S.2
-
11
-
-
0037081993
-
A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
-
J. Balasubramanian and I.E. Grossmann, "A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times," Computers and Chemical Engineering, vol. 26, no. 1, pp. 41-57, 2002.
-
(2002)
Computers and Chemical Engineering
, vol.26
, Issue.1
, pp. 41-57
-
-
Balasubramanian, J.1
Grossmann, I.E.2
-
12
-
-
45049088287
-
Reliability modeling and analysis of serial-parallel hybrid multi-operational manufacturing system considering dimensional quality, tool degradation and system configuration
-
Ji-wen Sun, Li-feng Xi, Shi-chang Du and Bo Ju, "Reliability modeling and analysis of serial-parallel hybrid multi-operational manufacturing system considering dimensional quality, tool degradation and system configuration," Int. J. Production Economics, vol. 114, pp. 149-164, 2008.
-
(2008)
Int. J. Production Economics
, vol.114
, pp. 149-164
-
-
Sun, J.-W.1
Xi, L.-F.2
Du, S.-C.3
Ju, B.4
-
15
-
-
0002217386
-
Quicksort
-
C.A.R. Hoare, "Quicksort," Comput. J. vol. 5, no. 1, pp. 10-15, 1962.
-
(1962)
Comput. J
, vol.5
, Issue.1
, pp. 10-15
-
-
Hoare, C.A.R.1
|