-
1
-
-
34548843878
-
An integrated decision support tool for airlines schedule recovery during irregular operations
-
Abdelghany, K., Abdelghany, A., & Ekollu, G. (2008). An integrated decision support tool for airlines schedule recovery during irregular operations. European Journal of Operational Research, 185(2), 825–848.
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.2
, pp. 825-848
-
-
Abdelghany, K.1
Abdelghany, A.2
Ekollu, G.3
-
2
-
-
78650130562
-
A MILP-based local search method for the railway rescheduling problem
-
Acuna-Agost, R., Michelon, P., Feillet, D., & Gueye, S. (2011). A MILP-based local search method for the railway rescheduling problem. Networks, 57, 69–86.
-
(2011)
Networks
, vol.57
, pp. 69-86
-
-
Acuna-Agost, R.1
Michelon, P.2
Feillet, D.3
Gueye, S.4
-
3
-
-
0345886432
-
Approaches to incorporating robustness into airline scheduling
-
Massachusetts Institute of Technology, Cambridge:
-
Ageeva, Y. (2000). Approaches to incorporating robustness into airline scheduling. Master’s thesis. Massachusetts Institute of Technology, Cambridge.
-
(2000)
Master’s thesis
-
-
Ageeva, Y.1
-
4
-
-
80054826528
-
Operational problems recovery in airlines—a specialized methodologies approach
-
Aguiar, B., Torres, J., & Castro, A. J. M. (2011). Operational problems recovery in airlines—a specialized methodologies approach. Lecture Notes in Computer Science, 7026, 83–97.
-
(2011)
Lecture Notes in Computer Science
, vol.7026
, pp. 83-97
-
-
Aguiar, B.1
Torres, J.2
Castro, A.J.M.3
-
6
-
-
80052974273
-
Increasing delay-tolerance of vehicle and crew schedules in public transport by sequential, partial-integrated and integrated approaches
-
Amberg, B., Amberg, B., & Kliewer, N. (2012). Increasing delay-tolerance of vehicle and crew schedules in public transport by sequential, partial-integrated and integrated approaches. Procedia-Social and Behavioral Sciences, 20, 292–301.
-
(2012)
Procedia-Social and Behavioral Sciences
, vol.20
, pp. 292-301
-
-
Amberg, B.1
Amberg, B.2
Kliewer, N.3
-
7
-
-
32544453510
-
Solving the flight perturbation problem with meta heuristics
-
Andersson, T. (2006). Solving the flight perturbation problem with meta heuristics. Journal of Heuristics, 12, 37–53.
-
(2006)
Journal of Heuristics
, vol.12
, pp. 37-53
-
-
Andersson, T.1
-
9
-
-
84870238126
-
On-line reschedule optimization for passenger railways in case of emergencies
-
Almodóvar, M., & García-Ródenas, R. (2013). On-line reschedule optimization for passenger railways in case of emergencies. Computers & Operations Research, 40(3), 725–736.
-
(2013)
Computers & Operations Research
, vol.40
, Issue.3
, pp. 725-736
-
-
Almodóvar, M.1
García-Ródenas, R.2
-
10
-
-
24144491827
-
A GRASP for aircraft routing in response to groundings and delays
-
Argüello, M., Bard, J., & Yu, G. (1997). A GRASP for aircraft routing in response to groundings and delays. Journal of Combinatorial Optimization, 5, 211–228.
-
(1997)
Journal of Combinatorial Optimization
, vol.5
, pp. 211-228
-
-
Argüello, M.1
Bard, J.2
Yu, G.3
-
12
-
-
77951697290
-
Heuristic approach to the airline schedule disturbances problem
-
Babić, O., Kalić, M., Pavković, G., Dožić, S., & Čangalović, M. (2010). Heuristic approach to the airline schedule disturbances problem. Transportation Planning and Technology, 33(3), 257–280.
-
(2010)
Transportation Planning and Technology
, vol.33
, Issue.3
, pp. 257-280
-
-
Babić, O.1
Kalić, M.2
Pavković, G.3
Dožić, S.4
Čangalović, M.5
-
13
-
-
0035480369
-
Optimizing aircraft routings in response to groundings and delays
-
Bard, J., Yu, G., & Argüello, M. (2001). Optimizing aircraft routings in response to groundings and delays. IIE Transactions, 33, 931–947.
-
(2001)
IIE Transactions
, vol.33
, pp. 931-947
-
-
Bard, J.1
Yu, G.2
Argüello, M.3
-
14
-
-
77950497191
-
Air transportation: Irregular operations and control
-
Branhart C, Laporte G, (eds), 14, Elsevier, Amsterdam:
-
Ball, M., Barnhart, C., Nemhauser, G., & Odoni, A. (2007). Air transportation: Irregular operations and control. In C. Branhart & G. Laporte (Eds.), Handbook in OR & MS (Vol. 14, pp. 1–67). Amsterdam: Elsevier.
-
(2007)
Handbook in OR & MS
, pp. 1-67
-
-
Ball, M.1
Barnhart, C.2
Nemhauser, G.3
Odoni, A.4
-
16
-
-
80052791982
-
Passenger flow-oriented train disposition
-
Berger, A., Blaar, C., Gebhardt, A., Müller-Hannemann, M., & Schnee, M. (2011a). Passenger flow-oriented train disposition. Lecture Notes in Computer Science, 6942, 227–238.
-
(2011)
Lecture Notes in Computer Science
, vol.6942
, pp. 227-238
-
-
Berger, A.1
Blaar, C.2
Gebhardt, A.3
Müller-Hannemann, M.4
Schnee, M.5
-
17
-
-
79957668557
-
Online railway delay management: Hardness, simulation and computation
-
Berger, A., Hoffmann, R., Lorenz, U., & Stiller, S. (2011b). Online railway delay management: Hardness, simulation and computation. Simulation, 87(7), 616–629.
-
(2011)
Simulation
, vol.87
, Issue.7
, pp. 616-629
-
-
Berger, A.1
Hoffmann, R.2
Lorenz, U.3
Stiller, S.4
-
18
-
-
0034244734
-
The traffic flow management rerouting problem in air traffic control: A dynamic network flow approach
-
Bertsimas, D., & Patterson, S. S. (2000). The traffic flow management rerouting problem in air traffic control: A dynamic network flow approach. Transportation Science, 34(3), 239–255.
-
(2000)
Transportation Science
, vol.34
, Issue.3
, pp. 239-255
-
-
Bertsimas, D.1
Patterson, S.S.2
-
19
-
-
79956319977
-
A large neighborhood search heuristic for the aircraft and passenger recovery problem
-
Bisaillon, S., Cordeau, J.-F., Laporte, G., & Pasin, F. (2011). A large neighborhood search heuristic for the aircraft and passenger recovery problem. 4OR, A Quarterly Journal of Operations Research, 9(2), 139–157.
-
(2011)
4OR, A Quarterly Journal of Operations Research
, vol.9
, Issue.2
, pp. 139-157
-
-
Bisaillon, S.1
Cordeau, J.-F.2
Laporte, G.3
Pasin, F.4
-
20
-
-
33646693407
-
Flight operations recovery: New approaches considering passenger recovery
-
Bratu, S., & Barnhart, C. (2006). Flight operations recovery: New approaches considering passenger recovery. Journal of Scheduling, 9, 279–298.
-
(2006)
Journal of Scheduling
, vol.9
, pp. 279-298
-
-
Bratu, S.1
Barnhart, C.2
-
22
-
-
84910110908
-
Robust tail assignment. ZIB
-
10-08
-
Borndörfer, R., Dovica, I., Nowak, I., & Schickinger, T. (2009). Robust tail assignment. ZIB, Report 10–08.
-
(2009)
Report
-
-
Borndörfer, R.1
Dovica, I.2
Nowak, I.3
Schickinger, T.4
-
23
-
-
79953001737
-
An overview on vehicle scheduling models in public transport
-
Bunte, S., & Kliewer, N. (2009). An overview on vehicle scheduling models in public transport. Public Transport, 1(4), 299–317.
-
(2009)
Public Transport
, vol.1
, Issue.4
, pp. 299-317
-
-
Bunte, S.1
Kliewer, N.2
-
24
-
-
84882999619
-
Robust train routing and online re-scheduling. In T. Erlebach & M. Lübbecke (Eds.), 10th Workshop on algorithmic approaches for transportation modelling, optimization, and systems (ATMOS’10) (pp. 24–33)
-
Caprara, A., Galli, L., Kroon, L., Maróti, G., & Toth, P. (2010). Robust train routing and online re-scheduling. In T. Erlebach & M. Lübbecke (Eds.), 10th Workshop on algorithmic approaches for transportation modelling, optimization, and systems (ATMOS’10) (pp. 24–33). Dagstuhl.
-
(2010)
Dagstuhl
-
-
Caprara, A.1
Galli, L.2
Kroon, L.3
Maróti, G.4
Toth, P.5
-
25
-
-
0030814310
-
A real-time decision support for integration of airline flight cancellation and delays, part I: Mathematical formulation
-
Cao, J.-M., & Kanafani, A. (1997a). A real-time decision support for integration of airline flight cancellation and delays, part I: Mathematical formulation. Transportation Planning and Technology, 20, 183–199.
-
(1997)
Transportation Planning and Technology
, vol.20
, pp. 183-199
-
-
Cao, J.-M.1
Kanafani, A.2
-
26
-
-
0030807231
-
A real-time decision support for integration of airline flight cancellation and delays, part II: Algorithm and computation
-
Cao, J.-M., & Kanafani, A. (1997b). A real-time decision support for integration of airline flight cancellation and delays, part II: Algorithm and computation. Transportation Planning and Technology, 20, 201–217.
-
(1997)
Transportation Planning and Technology
, vol.20
, pp. 201-217
-
-
Cao, J.-M.1
Kanafani, A.2
-
27
-
-
1642304524
-
Ship routing and scheduling: Status and perspectives
-
Christiansen, M., Fagerholt, K., & Ronen, D. (2004). Ship routing and scheduling: Status and perspectives. Transportation Science, 38(1), 1–18.
-
(2004)
Transportation Science
, vol.38
, Issue.1
, pp. 1-18
-
-
Christiansen, M.1
Fagerholt, K.2
Ronen, D.3
-
28
-
-
0030215925
-
Maintenance and crew considerations in fleet assignment
-
Clarke, L. W., Hane, C. A., Johnson, E. L., & Nemhauser, G. L. (1996). Maintenance and crew considerations in fleet assignment. Transportation Science, 30(3), 249–260.
-
(1996)
Transportation Science
, vol.30
, Issue.3
, pp. 249-260
-
-
Clarke, L.W.1
Hane, C.A.2
Johnson, E.L.3
Nemhauser, G.L.4
-
29
-
-
70350622986
-
Disruption management in the airline industry: Concepts, models and methods
-
Clausen, J., Larsen, A., Larsen, J., & Rezanova, N. J. (2010). Disruption management in the airline industry: Concepts, models and methods. Computers & Operations Research, 37(5), 809–821.
-
(2010)
Computers & Operations Research
, vol.37
, Issue.5
, pp. 809-821
-
-
Clausen, J.1
Larsen, A.2
Larsen, J.3
Rezanova, N.J.4
-
30
-
-
0032203702
-
A survey of optimization models for train routing and scheduling
-
Cordeau, J.-F., Toth, P., & Vigo, D. (1998). A survey of optimization models for train routing and scheduling. Transportation Science, 32(4), 380–404.
-
(1998)
Transportation Science
, vol.32
, Issue.4
, pp. 380-404
-
-
Cordeau, J.-F.1
Toth, P.2
Vigo, D.3
-
31
-
-
71549158818
-
A tabu search algorithm for rerouting trains during rail operations
-
Corman, F., D’Ariano, A., Pacciarelli, D., & Pranzo, M. (2010). A tabu search algorithm for rerouting trains during rail operations. Transportation Research Part B: Methodological, 44(1), 175– 192.
-
(2010)
Transportation Research Part B: Methodological
, vol.44
, Issue.1
, pp. 175-192
-
-
Corman, F.1
D’Ariano, A.2
Pacciarelli, D.3
Pranzo, M.4
-
32
-
-
84910123415
-
Improving real-time train dispatching: Models, algorithms and applications. Ph.D thesis. Department of Transport & Planning
-
Delft University of Technology, The Netherlands:
-
D’Ariano, A. (2008). Improving real-time train dispatching: Models, algorithms and applications. Ph.D thesis. Department of Transport & Planning, Faculty of Civil Engineering and Geosciences, Delft University of Technology, The Netherlands.
-
(2008)
Faculty of Civil Engineering and Geosciences
-
-
D’Ariano, A.1
-
33
-
-
59749089450
-
An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances
-
D’Ariano, A. D., & Pranzo, M. (2009). An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances. Networks and Spatial Economics, 9(1), 63–84.
-
(2009)
Networks and Spatial Economics
, vol.9
, Issue.1
, pp. 63-84
-
-
D’Ariano, A.D.1
Pranzo, M.2
-
34
-
-
70449635732
-
Reordering and local rerouting strategies to manage train traffic in real-time
-
D’Ariano, A., Corman, F., Pacciarelli, D., & Pranzo, M. (2008). Reordering and local rerouting strategies to manage train traffic in real-time. Transportation Science, 42(4), 405–419.
-
(2008)
Transportation Science
, vol.42
, Issue.4
, pp. 405-419
-
-
D’Ariano, A.1
Corman, F.2
Pacciarelli, D.3
Pranzo, M.4
-
35
-
-
34249982545
-
A branch and bound algorithm for scheduling trains in a railway network
-
D’Ariano, A., Pacciarelli, D., & Pranzo, M. (2007a). A branch and bound algorithm for scheduling trains in a railway network. European Journal of Operational Research, 183(2), 643–657.
-
(2007)
European Journal of Operational Research
, vol.183
, Issue.2
, pp. 643-657
-
-
D’Ariano, A.1
Pacciarelli, D.2
Pranzo, M.3
-
36
-
-
34249889301
-
Conflict resolution and train speed coordination for solving real-time timetable perturbations
-
D’Ariano, A., Pranzo, M., & Hansen, I. A. (2007b). Conflict resolution and train speed coordination for solving real-time timetable perturbations. IEEE Transactions on Intelligent Transportation Systems, 8(2), 208–222.
-
(2007)
IEEE Transactions on Intelligent Transportation Systems
, vol.8
, Issue.2
, pp. 208-222
-
-
D’Ariano, A.1
Pranzo, M.2
Hansen, I.A.3
-
38
-
-
84867330624
-
Disruption management in liner shipping. Master’s dissertation
-
Dirksen, B. J. (2011). Disruption management in liner shipping. Master’s dissertation. Technical University of Denmark.
-
(2011)
Technical University of Denmark
-
-
Dirksen, B.J.1
-
39
-
-
84910151494
-
Heuristic approach to the airline schedule disturbances problem: Multi-fleet case
-
Dublin, Ireland
-
Dožić, S., Kalić, M., Babić, O., & Čangalović, M. (2009). Heuristic approach to the airline schedule disturbances problem: Multi-fleet case. In Multidisciplinary international conference on scheduling: Theory and applications (MISTA 2009). Dublin, Ireland.
-
(2012)
In Multidisciplinary international conference on scheduling: Theory and applications (MISTA 2009)
, vol.20
, pp. 47-61
-
-
Dožić, S.1
Kalić, M.2
Babić, O.3
Čangalović, C.4
-
40
-
-
80054789931
-
Increasing stability of crew and aircraft schedules
-
Dück, V., Ionescu, L., Kliewer, N., & Suhl, L. (2012). Increasing stability of crew and aircraft schedules. Transportation Research Part C: Emerging Technologies, 20, 47–61.
-
(2012)
Transportation Research Part C: Emerging Technologies
, vol.20
, pp. 47-61
-
-
Dück, V.1
Ionescu, L.2
Kliewer, N.3
Suhl, L.4
-
41
-
-
38849168262
-
Static and dynamic order scheduling for recreational rental vehicles at tourism holdings limited
-
Ernst, A. T., Horn, M., Krishnamoorthy, M., Kilby, P., Degenhardt, P., & Moran, M. (2007). Static and dynamic order scheduling for recreational rental vehicles at tourism holdings limited. Interfaces, 37(4), 334–341.
-
(2007)
Interfaces
, vol.37
, Issue.4
, pp. 334-341
-
-
Ernst, A.T.1
Horn, M.2
Krishnamoorthy, M.3
Kilby, P.4
Degenhardt, P.5
Moran, M.6
-
42
-
-
71749121665
-
Constraint-specific recovery network for solving airline recovery problems
-
Eggenberg, N., Salani, M., & Bierlaire, M. (2010). Constraint-specific recovery network for solving airline recovery problems. Computers & Operations Research, 37(6), 1014–1026.
-
(2010)
Computers & Operations Research
, vol.37
, Issue.6
, pp. 1014-1026
-
-
Eggenberg, N.1
Salani, M.2
Bierlaire, M.3
-
43
-
-
56649090083
-
A model for adaptive rescheduling of flights in emergencies (MARFE)
-
Fekete, S. P., Kroeller, A., Lorek, M. & Pfetsch, M. E. (2011). Disruption management with rescheduling of trips and vehicle circulations. In Proceedings of the 5th ASME/ASCE/IEEE Joint Rail Conference. Pueblo, Colorado, USA.
-
(2007)
Journal of Industrial and Management Optimization
, vol.3
, Issue.2
, pp. 335-356
-
-
Fekete, S.P.1
Kroeller, A.2
Lorek, M.3
Pfetsch, M.E.4
-
44
-
-
56649090083
-
A model for adaptive rescheduling of flights in emergencies (MARFE)
-
Filar, J. A., Manyem, P., Panton, D. M., & White, K. (2007). A model for adaptive rescheduling of flights in emergencies (MARFE). Journal of Industrial and Management Optimization, 3(2), 335–356.
-
(2007)
Journal of Industrial and Management Optimization
, vol.3
, Issue.2
, pp. 335-356
-
-
Filar, J.A.1
Manyem, P.2
Panton, D.M.3
White, K.4
-
45
-
-
70449640336
-
Fast approaches to improve the robustness of a railway timetable
-
Fischetti, M., Salvagnin, D., & Zanette, A. (2009). Fast approaches to improve the robustness of a railway timetable. Transportation Science, 43(3), 321–335.
-
(2009)
Transportation Science
, vol.43
, Issue.3
, pp. 321-335
-
-
Fischetti, M.1
Salvagnin, D.2
Zanette, A.3
-
46
-
-
0035326637
-
Models and algorithms for single-depot vehicle scheduling
-
Freling, R., Wagelmans, A. P. M., & Paixão, J. M. P. (2001). Models and algorithms for single-depot vehicle scheduling. Transportation Science, 35(2), 165–180.
-
(2001)
Transportation Science
, vol.35
, Issue.2
, pp. 165-180
-
-
Freling, R.1
Wagelmans, A.P.M.2
Paixão, J.M.P.3
-
47
-
-
67650652224
-
Heuristic algorithm for coordination in public transport under disruptions
-
García-Ródenas, R., Almodóvar, M., & Parreño, F. (2009). Heuristic algorithm for coordination in public transport under disruptions. Lecture Notes in Computer Science, 5484, 808–817.
-
(2009)
Lecture Notes in Computer Science
, vol.5484
, pp. 808-817
-
-
García-Ródenas, R.1
Almodóvar, M.2
Parreño, F.3
-
48
-
-
84910118945
-
Effects of the February 2010 snowstorms on airline performance
-
Rita Bureau of Transportation Statistics: US Department of Transportation
-
Guarino, J., & Firestine, T. (2010). Effects of the February 2010 snowstorms on airline performance. Special Report-021, Rita Bureau of Transportation Statistics, US Department of Transportation.
-
(2010)
Special Report-021
-
-
Guarino, J.1
Firestine, T.2
-
49
-
-
0029196321
-
The fleet assignment problem: Solving a large-scale integer program
-
Hane, C. A., Barnhart, C., Johnson, E. L., Marsten, R. E., Nemhauser, G. L., & Sigismondi, G. (1995). The fleet assignment problem: Solving a large-scale integer program. Mathematical Programming, 70, 211–232.
-
(1995)
Mathematical Programming
, vol.70
, pp. 211-232
-
-
Hane, C.A.1
Barnhart, C.2
Johnson, E.L.3
Marsten, R.E.4
Nemhauser, G.L.5
Sigismondi, G.6
-
51
-
-
33644681577
-
A solution approach for dynamic vehicle and crew scheduling
-
Huisman, D., & Wagelmans, A. (2006). A solution approach for dynamic vehicle and crew scheduling. European Journal of Operational Research, 172(2), 453–471.
-
(2006)
European Journal of Operational Research
, vol.172
, Issue.2
, pp. 453-471
-
-
Huisman, D.1
Wagelmans, A.2
-
52
-
-
10644286621
-
A robust solution approach to the dynamic vehicle scheduling problem
-
Huisman, D., Freling, R., & Wagelmans, A. P. M. (2004). A robust solution approach to the dynamic vehicle scheduling problem. Transportation Science, 38(4), 447–458.
-
(2004)
Transportation Science
, vol.38
, Issue.4
, pp. 447-458
-
-
Huisman, D.1
Freling, R.2
Wagelmans, A.P.M.3
-
53
-
-
84910125047
-
A comparison of recovery strategies for crew and aircraft schedules
-
Hu B, Morasch K, Pickl S, Siegle M, (eds), Springer, Berlin:
-
Ionescu, L., Kliewer, N., & Schramme, T. (2010). A comparison of recovery strategies for crew and aircraft schedules. In B. Hu, K. Morasch, S. Pickl, & M. Siegle (Eds.), Operations research proceedings 2010 (pp. 269–274). Berlin: Springer.
-
(2010)
Operations research proceedings 2010
, pp. 269-274
-
-
Ionescu, L.1
Kliewer, N.2
Schramme, T.3
-
54
-
-
79961021134
-
Simultaneous recovery model for aircraft and passengers
-
Jafari, N., & Zegordi, S. H. (2011). Simultaneous recovery model for aircraft and passengers. Journal of the Franklin Institute, 348, 1638–1655.
-
(2011)
Journal of the Franklin Institute
, vol.348
, pp. 1638-1655
-
-
Jafari, N.1
Zegordi, S.H.2
-
55
-
-
0027646865
-
A decision support framework for airline flight cancellation and delays
-
Jarrah, A., Yu, G., Krishnamurthy, N., & Rakshit, A. (1993). A decision support framework for airline flight cancellation and delays. Transportation Science, 27, 266–280.
-
(1993)
Transportation Science
, vol.27
, pp. 266-280
-
-
Jarrah, A.1
Yu, G.2
Krishnamurthy, N.3
Rakshit, A.4
-
56
-
-
77956302319
-
Disruption management in passenger railway transportation
-
Ahuja RK, (ed), Springer-Verlag, Berlin:
-
Jespersen-Groth, J., Potthoff, D., Clausen, J., Huisman, D., Kroon, L., Gábor, M., et al. (2009). Disruption management in passenger railway transportation. In R. K. Ahuja (Ed.), Robust and online large-scale optimization (pp. 399–421). Berlin: Springer-Verlag.
-
(2009)
Robust and online large-scale optimization
, pp. 399-421
-
-
Jespersen-Groth, J.1
Potthoff, D.2
Clausen, J.3
Huisman, D.4
Kroon, L.5
Gábor, M.6
Nielsen, M.N.7
-
57
-
-
33748925200
-
A time-space network based exact optimization model for multi-depot bus scheduling
-
Kliewer, N., Mellouli, T., & Suhl, L. (2006). A time-space network based exact optimization model for multi-depot bus scheduling. European Journal of Operational Research, 175(3), 1616– 1627.
-
(2006)
European Journal of Operational Research
, vol.175
, Issue.3
, pp. 1616-1627
-
-
Kliewer, N.1
Mellouli, T.2
Suhl, L.3
-
58
-
-
34147205873
-
Airline disruption management—perspectives, experiences and outlook
-
Kohl, N., Larsen, A., Larsen, J., Ross, A., & Tiourine, S. (2007). Airline disruption management—perspectives, experiences and outlook. Journal of Air Transport Management, 13(3), 149–162.
-
(2007)
Journal of Air Transport Management
, vol.13
, Issue.3
, pp. 149-162
-
-
Kohl, N.1
Larsen, A.2
Larsen, J.3
Ross, A.4
Tiourine, S.5
-
59
-
-
34147205873
-
Airline disruption management—perspectives, experiences and outlook
-
Kramkowski, S., Kliewer, N., & Meier, C. (2009). Heuristic methods for increasing delay-tolerance of vehicle schedules in public bus transport. In Proceedings of the metaheuristic international conference VIII. Hamburg, Germany.
-
(2007)
Journal of Air Transport Management
, vol.13
, Issue.3
, pp. 149-162
-
-
Kramkowski, S.1
Kliewer, N.2
Larsen, J.3
Ross, A.4
Tiourine, S.5
-
60
-
-
84910119955
-
Algorithmic support for disruption management at Netherlands Railways. Econometric Institute Report. EI 2011–06
-
Erasmus University, Rotterdam:
-
Kroon, L. G. & Huisman, D. (2011). Algorithmic support for disruption management at Netherlands Railways. Econometric Institute Report. EI 2011–06. Econometric Institute, Erasmus University, Rotterdam.
-
(2011)
Econometric Institute
-
-
Kroon, L.G.1
Huisman, D.2
-
61
-
-
33644596070
-
Planning for robust airline operations: Optimizing aircraft routings and flight departure times to minimize passenger disruptions
-
Lan, S., Clarke, J.-P., & Barnhart, C. (2006). Planning for robust airline operations: Optimizing aircraft routings and flight departure times to minimize passenger disruptions. Transportation Science, 40(1), 15–28.
-
(2006)
Transportation Science
, vol.40
, Issue.1
, pp. 15-28
-
-
Lan, S.1
Clarke, J.-P.2
Barnhart, C.3
-
62
-
-
33750734287
-
A multi-objective genetic algorithm for robust flight scheduling using simulation
-
Lee, L. H., Lee, U. C., & Tan, Y. P. (2007). A multi-objective genetic algorithm for robust flight scheduling using simulation. European Journal of Operational Research, 177, 1948–1968.
-
(2007)
European Journal of Operational Research
, vol.177
, pp. 1948-1968
-
-
Lee, L.H.1
Lee, U.C.2
Tan, Y.P.3
-
63
-
-
9644275655
-
The complexity of machine scheduling for stability with a single disrupted job
-
Leus, R., & Herroelen, W. (2005). The complexity of machine scheduling for stability with a single disrupted job. Operations Research Letters, 33(2), 151–156.
-
(2005)
Operations Research Letters
, vol.33
, Issue.2
, pp. 151-156
-
-
Leus, R.1
Herroelen, W.2
-
64
-
-
78649446511
-
Truck schedule recovery for solid waste collection in Porto Alegre
-
Li, J. Q., Borenstein, D., & Mirchandani, P. B. (2008). Truck schedule recovery for solid waste collection in Porto Alegre. International Transactions in Operational Research, 15, 565–582.
-
(2008)
International Transactions in Operational Research
, vol.15
, pp. 565-582
-
-
Li, J.Q.1
Borenstein, D.2
Mirchandani, P.B.3
-
65
-
-
84910136839
-
Parallel auction algorithm for bus rescheduling
-
San Diego, CA
-
Li, J. Q., Mirchandani, P. B., & Borenstein, D. (2004). Parallel auction algorithm for bus rescheduling. In Proceedings of ninth international conference on computer-aided scheduling of public transport. San Diego, CA.
-
(2007)
In Proceedings of ninth international conference on computer-aided scheduling of public transport
-
-
Li, J.Q.1
Mirchandani, P.B.2
Borenstein, D.3
-
66
-
-
34748884947
-
The vehicle rescheduling problem: Model and algorithms
-
Li, J. Q., Mirchandani, P. B., & Borenstein, D. (2007a). The vehicle rescheduling problem: Model and algorithms. Networks, 50(3), 211–229.
-
(2007)
Networks
, vol.50
, Issue.3
, pp. 211-229
-
-
Li, J.Q.1
Mirchandani, P.B.2
Borenstein, D.3
-
67
-
-
33748754194
-
A decision support system for the single-depot vehicle rescheduling problem
-
Li, J., Borenstein, D., & Mirchandani, P. B. (2007b). A decision support system for the single-depot vehicle rescheduling problem. Computers & Operations Research, 34(4), 1008–1032.
-
(2007)
Computers & Operations Research
, vol.34
, Issue.4
, pp. 1008-1032
-
-
Li, J.1
Borenstein, D.2
Mirchandani, P.B.3
-
68
-
-
64149106197
-
A Lagrangian heuristic for the real-time vehicle rescheduling problem
-
Li, J. Q., Mirchandani, P. B., & Borenstein, D. (2009). A Lagrangian heuristic for the real-time vehicle rescheduling problem. Transportation Research Part E: Logistics and Transportation Review, 45(3), 419–433.
-
(2009)
Transportation Research Part E: Logistics and Transportation Review
, vol.45
, Issue.3
, pp. 419-433
-
-
Li, J.Q.1
Mirchandani, P.B.2
Borenstein, D.3
-
69
-
-
70449528497
-
Optimization of short-haul aircraft schedule recovery problems using a hybrid multiobjective genetic algorithm
-
Liu, T. K., Chen, C. H., & Chou, J. H. (2010). Optimization of short-haul aircraft schedule recovery problems using a hybrid multiobjective genetic algorithm. Expert Systems with Applications, 37(3), 2307–2315.
-
(2010)
Expert Systems with Applications
, vol.37
, Issue.3
, pp. 2307-2315
-
-
Liu, T.K.1
Chen, C.H.2
Chou, J.H.3
-
70
-
-
56049112579
-
Disruption management of an inequality-based multi-fleet airline schedule by a multi-objective genetic algorithm
-
Liu, T. K., Jeng, C. R., & Chang, Y. H. (2008). Disruption management of an inequality-based multi-fleet airline schedule by a multi-objective genetic algorithm. Transportation Planning and Technology, 31(6), 613–639.
-
(2008)
Transportation Planning and Technology
, vol.31
, Issue.6
, pp. 613-639
-
-
Liu, T.K.1
Jeng, C.R.2
Chang, Y.H.3
-
71
-
-
84856591091
-
Optimal methods for resource allocation and scheduling: A cross disciplinary survey
-
Lombardi, M., & Milano, M. (2012). Optimal methods for resource allocation and scheduling: A cross disciplinary survey. Constraints, 17(1), 51–85.
-
(2012)
Constraints
, vol.17
, Issue.1
, pp. 51-85
-
-
Lombardi, M.1
Milano, M.2
-
72
-
-
84878632655
-
Disruption management for an airline—rescheduling of aircraft
-
LNCS 2279
-
Løve, M., Sørensen, K. R., Larsen, J., & Clausen, J. (2002). Disruption management for an airline—rescheduling of aircraft. In EvoWorkshops 2002, LNCS 2279 (pp. 315–324). Berlin, Heidelberg: Springer-Verlag.
-
(2012)
In EvoWorkshops 2002
, pp. 315-324
-
-
Lombardi, M.1
Milano, M.2
-
73
-
-
59749105988
-
Structure and simulation evaluation of an integrated real-time rescheduling system for railway networks
-
Luethi, M., Medeossi, G., & Nash, A. (2009). Structure and simulation evaluation of an integrated real-time rescheduling system for railway networks. Networks and Spatial Economics, 9(1), 103–121.
-
(2009)
Networks and Spatial Economics
, vol.9
, Issue.1
, pp. 103-121
-
-
Luethi, M.1
Medeossi, G.2
Nash, A.3
-
74
-
-
0030291547
-
Decision support for airline system operations control and irregular operations
-
Mathaisel, D. (1996). Decision support for airline system operations control and irregular operations. Computers and Operations Research, 23, 1083–1098.
-
(1996)
Computers and Operations Research
, vol.23
, pp. 1083-1098
-
-
Mathaisel, D.1
-
75
-
-
0003531165
-
Machine scheduling via alternative graphs. Working paper
-
Università degli Studi Roma, Tré, Italy:
-
Mascis, A., & Pacciarelli, D. (2000). Machine scheduling via alternative graphs. Working paper, Dipartamento di Informatica e Automazione, Università degli Studi Roma, Tré, Italy.
-
(2000)
Dipartamento di Informatica e Automazione
-
-
Mascis, A.1
Pacciarelli, D.2
-
76
-
-
0037121475
-
Job shop scheduling with blocking and no-wait constraints
-
Mascis, A., & Pacciarelli, D. (2002). Job shop scheduling with blocking and no-wait constraints. European Journal of Operational Research, 143(3), 498–517.
-
(2002)
European Journal of Operational Research
, vol.143
, Issue.3
, pp. 498-517
-
-
Mascis, A.1
Pacciarelli, D.2
-
77
-
-
79551584093
-
Train timetable optimizing and rescheduling based on improved particle swarm algorithm
-
Meng, X., Jia, L., & Qin, Y. (2010). Train timetable optimizing and rescheduling based on improved particle swarm algorithm. Transportation Research Record: Journal of the Transportation Research Board, 2197(1), 71–79.
-
(2010)
Transportation Research Record: Journal of the Transportation Research Board
, vol.2197
, Issue.1
, pp. 71-79
-
-
Meng, X.1
Jia, L.2
Qin, Y.3
-
78
-
-
55049083376
-
A dynamic rerouting model for air traffic flow management
-
Mukherjee, A., & Hansen, M. (2009). A dynamic rerouting model for air traffic flow management. Transportation Research Part B: Methodological, 43(1), 159–171.
-
(2009)
Transportation Research Part B: Methodological
, vol.43
, Issue.1
, pp. 159-171
-
-
Mukherjee, A.1
Hansen, M.2
-
79
-
-
77956334402
-
A decision support framework for rolling stock rescheduling
-
Nielsen, L. K. (2008). A decision support framework for rolling stock rescheduling. Technical report ARRIVAL-TR-0158.
-
(2008)
Technical report ARRIVAL-TR-0158
-
-
Nielsen, L.K.1
-
80
-
-
84859796265
-
Rolling stock rescheduling in passenger railways—applications in short-term planning and in disruption management. PhD thesis
-
Rotterdam, The Netherlands:
-
Nielsen, L. K. (2011). Rolling stock rescheduling in passenger railways—applications in short-term planning and in disruption management. PhD thesis. Erasmus University, Rotterdam, The Netherlands.
-
(2011)
Erasmus University
-
-
Nielsen, L.K.1
-
81
-
-
26944478149
-
Train rescheduling algorithm which minimizes passengers’ dissatisfaction
-
Norio, T., Yoshiaki, T., Noriyuki, T., Chikara, H., & Kunimitsu, M. (2005). Train rescheduling algorithm which minimizes passengers’ dissatisfaction. Lecture Notes in Computer Science, 3533, 829–838.
-
(2005)
Lecture Notes in Computer Science
, vol.3533
, pp. 829-838
-
-
Norio, T.1
Yoshiaki, T.2
Noriyuki, T.3
Chikara, H.4
Kunimitsu, M.5
-
82
-
-
84871404173
-
An optimization approach to airline integrated recovery system
-
Petersen, J. D., Gustaf, S., Johnson, E. L., Clarke, J. P., & Shebalov, S. (2012). An optimization approach to airline integrated recovery system. Transportation Science, 46(4), 482–500.
-
(2012)
Transportation Science
, vol.46
, Issue.4
, pp. 482-500
-
-
Petersen, J.D.1
Gustaf, S.2
Johnson, E.L.3
Clarke, J.P.4
Shebalov, S.5
-
83
-
-
78649761026
-
Column generation with dynamic duty selection for railway crew rescheduling
-
Potthoff, D., Huisman, D., & Desaulniers, G. (2010). Column generation with dynamic duty selection for railway crew rescheduling. Transportation Science, 44(4), 493–505.
-
(2010)
Transportation Science
, vol.44
, Issue.4
, pp. 493-505
-
-
Potthoff, D.1
Huisman, D.2
Desaulniers, G.3
-
85
-
-
1442285828
-
Dynamic scheduling that simultaneously considers efficiency and stability
-
Rangsaritratsamee, R., Ferrel, W. G., & Kurtz, M. B. (2004). Dynamic scheduling that simultaneously considers efficiency and stability. Computers & Industrial Engineering, 46, 1–15.
-
(2004)
Computers & Industrial Engineering
, vol.46
, pp. 1-15
-
-
Rangsaritratsamee, R.1
Ferrel, W.G.2
Kurtz, M.B.3
-
86
-
-
0348041851
-
Rerouting aircraft for airline recovery
-
Rosenberger, J. M., Johnson, E. L., & Nemhauser, G. L. (2003). Rerouting aircraft for airline recovery. Transportation Science, 37(4), 408–421.
-
(2003)
Transportation Science
, vol.37
, Issue.4
, pp. 408-421
-
-
Rosenberger, J.M.1
Johnson, E.L.2
Nemhauser, G.L.3
-
87
-
-
0032884348
-
Railway traffic control and train scheduling based on inter-train conflict management
-
Sahin, I. (1999). Railway traffic control and train scheduling based on inter-train conflict management. Transportation Reseacrh: Part B, 33, 511–534.
-
(1999)
Transportation Reseacrh: Part B
, vol.33
, pp. 511-534
-
-
Sahin, I.1
-
88
-
-
84861636902
-
Real-time freight locomotive rescheduling and uncovered train detection during disruption
-
Sato, K., & Fukumura, N. (2012). Real-time freight locomotive rescheduling and uncovered train detection during disruption. European Journal of Operational Research, 221, 636–648.
-
(2012)
European Journal of Operational Research
, vol.221
, pp. 636-648
-
-
Sato, K.1
Fukumura, N.2
-
89
-
-
77949508569
-
Crew and vehicle rescheduling based on a network flow model and its application to a railway train operation. IAENG International Journal of Applied Mathematics, 39(3)
-
Sato, T., Shuichiro, S., Morita, T., Ueki, N. & Murata, T. (2009). Crew and vehicle rescheduling based on a network flow model and its application to a railway train operation. IAENG International Journal of Applied Mathematics, 39(3), IJAM$$\_39\_2$$_39_2.
-
(2009)
IAENG International Journal of Applied Mathematics
-
-
Sato, T.1
Shuichiro, S.2
Morita, T.3
Ueki, N.4
Murata, T.5
-
90
-
-
77957949829
-
Lagrangian relaxation method for network flow modeled crew and vehicle rescheduling
-
Sato, T., Tomiyama, T., Morita, T. & Murata, T. (2010). Lagrangian relaxation method for network flow modeled crew and vehicle rescheduling. In Proceedings of the 2nd international conference on advanced computer control (ICACC) (pp. 403–408).
-
(2010)
In Proceedings of the 2nd international conference on advanced computer control (ICACC)
, pp. 403-408
-
-
Sato, T.1
Tomiyama, T.2
Morita, T.3
Murata, T.4
-
91
-
-
0008917539
-
A mathematical model for periodic scheduling problems
-
Serafini, P., & Ukovich, W. (1989). A mathematical model for periodic scheduling problems. SIAM Journal on Discrete Mathematics, 2(4), 550–581.
-
(1989)
SIAM Journal on Discrete Mathematics
, vol.2
, Issue.4
, pp. 550-581
-
-
Serafini, P.1
Ukovich, W.2
-
92
-
-
77349086512
-
Topics in integrated vehicle and crew scheduling in public transit
-
University of Paderborn, Germany:
-
Steinzen, I. (2007). Topics in integrated vehicle and crew scheduling in public transit. PhD thesis. University of Paderborn, Germany.
-
(2007)
PhD thesis
-
-
Steinzen, I.1
-
93
-
-
77955598671
-
A time-space network approach for the integrated vehicle-and crew-scheduling problem with multiple depots
-
Steinzen, I., Gintner, V., Suhl, L., & Kliewer, N. (2010). A time-space network approach for the integrated vehicle-and crew-scheduling problem with multiple depots. Transportation Science, 44(3), 367–382.
-
(2010)
Transportation Science
, vol.44
, Issue.3
, pp. 367-382
-
-
Steinzen, I.1
Gintner, V.2
Suhl, L.3
Kliewer, N.4
-
94
-
-
71549159240
-
Railway scheduling problems and their decomposition. Ph.D
-
Universität Osnabrück, Germany:
-
Strotmann, C. (2007). Railway scheduling problems and their decomposition. Ph.D. thesis. Universität Osnabrück, Germany.
-
(2007)
thesis
-
-
Strotmann, C.1
-
96
-
-
84910125041
-
Swedish Transport Administration
-
Swedish Transport Administration. (2011). Annual Report 2011. http://publikationswebbutik.vv.se/upload/6814/2012_083_swedish_transport_administration_annual_report_2011.pdf. Accessed 10 Apr 2010.
-
(2011)
Annual Report 2011
-
-
SunTran1
-
97
-
-
0021375239
-
Optimal dispatching strategy on an airline network after a schedule perturbation
-
Teodorovic, D., & Guberinic, S. (1984). Optimal dispatching strategy on an airline network after a schedule perturbation. European Journal of the Operational Research, 15, 178–182.
-
(1984)
European Journal of the Operational Research
, vol.15
, pp. 178-182
-
-
Teodorovic, D.1
Guberinic, S.2
-
98
-
-
0034149008
-
Balancing user preferences for aircraft schedule recovery during irregular operations
-
Thengvall, B., Bard, J. F., & Yu, G. (2000). Balancing user preferences for aircraft schedule recovery during irregular operations. IIE Transactions, 32, 181–193.
-
(2000)
IIE Transactions
, vol.32
, pp. 181-193
-
-
Thengvall, B.1
Bard, J.F.2
Yu, G.3
-
99
-
-
0346780433
-
A bundle algorithm approach for the aircraft schedule recovery problem
-
Thengvall, B., Bard, J. F., & Yu, G. (2003). A bundle algorithm approach for the aircraft schedule recovery problem. Transportation Science, 37, 392–407.
-
(2003)
Transportation Science
, vol.37
, pp. 392-407
-
-
Thengvall, B.1
Bard, J.F.2
Yu, G.3
-
100
-
-
0035324674
-
Multiple fleet aircraft schedule recovery following hub closures
-
Thengvall, B., Yu, G., & Bard, J. F. (2001). Multiple fleet aircraft schedule recovery following hub closures. Transportation Research Part A, 35, 289–308.
-
(2001)
Transportation Research Part A
, vol.35
, pp. 289-308
-
-
Thengvall, B.1
Yu, G.2
Bard, J.F.3
-
102
-
-
33845266135
-
N-tracked railway traffic re-scheduling during disturbances
-
Tornquist, J., & Persson, J. (2007). N-tracked railway traffic re-scheduling during disturbances. Transportation Research Part B: Methodological, 41(3), 342–362.
-
(2007)
Transportation Research Part B: Methodological
, vol.41
, Issue.3
, pp. 342-362
-
-
Tornquist, J.1
Persson, J.2
-
103
-
-
80054791141
-
Railway crew rescheduling with retiming
-
Veelenturf, L. P., Potthoff, D., Huisman, D., & Kroon, L. G. (2012). Railway crew rescheduling with retiming. Transportation Research Part C: Emerging Technologies, 20(1), 95–110.
-
(2012)
Transportation Research Part C: Emerging Technologies
, vol.20
, Issue.1
, pp. 95-110
-
-
Veelenturf, L.P.1
Potthoff, D.2
Huisman, D.3
Kroon, L.G.4
-
104
-
-
0001737878
-
Practical applications of constraint programming
-
Wallace, M. (1996). Practical applications of constraint programming. Constraints: An International Journal, 1, 139–168.
-
(1996)
Constraints: An International Journal
, vol.1
, pp. 139-168
-
-
Wallace, M.1
-
105
-
-
70350619746
-
An iterative approach to robust and integrated aircraft routing and crew scheduling
-
Weide, O., Ryan, D., & Ehrgott, M. (2009). An iterative approach to robust and integrated aircraft routing and crew scheduling. Computers & Operations Research, 37, 833–844.
-
(2009)
Computers & Operations Research
, vol.37
, pp. 833-844
-
-
Weide, O.1
Ryan, D.2
Ehrgott, M.3
-
106
-
-
0030409893
-
A decision support framework for handling schedule perturbations
-
Yan, S., & Yang, D.-H. (1996). A decision support framework for handling schedule perturbations. Transportation Research Part B: Methodological, 30, 405–419.
-
(1996)
Transportation Research Part B: Methodological
, vol.30
, pp. 405-419
-
-
Yan, S.1
Yang, D.-H.2
-
107
-
-
0031275839
-
On the airline schedule perturbation problem caused by the ground delay program
-
Luo, S., & Yu, G. (1997). On the airline schedule perturbation problem caused by the ground delay program. Transportation Science, 31(4), 298–311.
-
(1997)
Transportation Science
, vol.31
, Issue.4
, pp. 298-311
-
-
Luo, S.1
Yu, G.2
-
108
-
-
80054805384
-
Solving the airline recovery problem by using ant colony optimization
-
Zegordi, S. H., & Jafari, N. (2010). Solving the airline recovery problem by using ant colony optimization. International Journal of Industrial Engineering & Production Research, 21(3), 121–128.
-
(2010)
International Journal of Industrial Engineering & Production Research
, vol.21
, Issue.3
, pp. 121-128
-
-
Zegordi, S.H.1
Jafari, N.2
-
109
-
-
0030212718
-
Routing trains through railway stations: Model formulation and algorithm
-
Zwaneveld, P. J., Kroon, L. G., Romejinn, H. E., Salomon, M., Dauzere-Peres, S., van Hoesel, C. P. M., et al. (1996). Routing trains through railway stations: Model formulation and algorithm. Transportation Science, 30, 181–194.
-
(1996)
Transportation Science
, vol.30
, pp. 181-194
-
-
Zwaneveld, P.J.1
Kroon, L.G.2
Romejinn, H.E.3
Salomon, M.4
Dauzere-Peres, S.5
van Hoesel, C.P.M.6
Ambergen, H.W.7
-
110
-
-
0035204411
-
Routing trains through a railway station based on a node packing model
-
Zwaneveld, P. J., Kroon, L. G., & van Hoesel, C. P. M. (2001). Routing trains through a railway station based on a node packing model. European Journal of Operations Research, 128, 14–33.
-
(2001)
European Journal of Operations Research
, vol.128
, pp. 14-33
-
-
Zwaneveld, P.J.1
Kroon, L.G.2
van Hoesel, C.P.M.3
|