Volumn 156, Issue 3, 2004, Pages 550-565

The construction of stable project baseline schedules

Author keywords

Project management and scheduling; Stability; Uncertainty modelling

Indexed keywords

COMPUTATIONAL METHODS; CONTRACTS; MATHEMATICAL MODELS; PERT; PROBLEM SOLVING; PROJECT MANAGEMENT; RESOURCE ALLOCATION; SCHEDULING; STABILITY; STRATEGIC PLANNING;

EID: 1642587688     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(03)00130-9     Document Type: Article
Times cited : (128)

References (30)
  • 1
    • 0024715589 scopus 로고
    • A classified bibliography of research on stochastic PERT networks: 1966-1987
    • Adlakha V.G., Kulkarni V.G. A classified bibliography of research on stochastic PERT networks: 1966-1987. INFOR. 27(3):1989;272-296.
    • (1989) INFOR , vol.27 , Issue.3 , pp. 272-296
    • Adlakha, V.G.1    Kulkarni, V.G.2
  • 2
    • 0032097042 scopus 로고    scopus 로고
    • The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure
    • Ahn T., Erenguc S.S. The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure. European Journal of Operational Research. 107:1998;250-259.
    • (1998) European Journal of Operational Research , vol.107 , pp. 250-259
    • Ahn, T.1    Erenguc, S.S.2
  • 6
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates and disruptions
    • Bean J.C., Birge J.R., Mittenthal J., Noon C.E. Matchup scheduling with multiple resources, release dates and disruptions. Operations Research. 39(3):1991;470-483.
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 7
    • 0002969484 scopus 로고    scopus 로고
    • Procedures for providing robust gate assignments for arriving aircrafts
    • Bolat A. Procedures for providing robust gate assignments for arriving aircrafts. European Journal of Operational Research. 120:2000;63-80.
    • (2000) European Journal of Operational Research , vol.120 , pp. 63-80
    • Bolat, A.1
  • 11
    • 0035281212 scopus 로고    scopus 로고
    • The resource constrained project scheduling problem with multiple crashable modes: An exact solution method
    • Erenguc S.S., Ahn T., Conway D.G. The resource constrained project scheduling problem with multiple crashable modes: An exact solution method. Naval Research Logistics. 48:2001;107-127.
    • (2001) Naval Research Logistics , vol.48 , pp. 107-127
    • Erenguc, S.S.1    Ahn, T.2    Conway, D.G.3
  • 12
    • 0000181338 scopus 로고
    • A network flow computation for project cost curves
    • Fulkerson D.R. A network flow computation for project cost curves. Management Science. 7:1961;167-178.
    • (1961) Management Science , vol.7 , pp. 167-178
    • Fulkerson, D.R.1
  • 13
    • 0001852170 scopus 로고    scopus 로고
    • An efficient implementation of a scaling minimum-cost flow algorithm
    • Goldberg A.V. An efficient implementation of a scaling minimum-cost flow algorithm. Journal of Algorithms. 22:1997;1-29.
    • (1997) Journal of Algorithms , vol.22 , pp. 1-29
    • Goldberg, A.V.1
  • 14
    • 0003926816 scopus 로고    scopus 로고
    • Great Barrington, MA: The North River Press
    • Goldratt E.M. Critical Chain. 1997;The North River Press, Great Barrington, MA.
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 15
    • 0001620447 scopus 로고
    • Critical-path planning and scheduling: Mathematical basis
    • Kelley J.E. Jr. Critical-path planning and scheduling: Mathematical basis. Operations. 9:1961;296-320.
    • (1961) Operations , vol.9 , pp. 296-320
    • Kelley Jr., J.E.1
  • 18
    • 0035637004 scopus 로고    scopus 로고
    • Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases
    • Lee C.Y., Lei L. Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases. Annals of Operations Research. 102:2001;287-307.
    • (2001) Annals of Operations Research , vol.102 , pp. 287-307
    • Lee, C.Y.1    Lei, L.2
  • 19
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon V.J., Wu S.D., Storer R.H. Robustness measures and robust scheduling for job shops. IIE Transactions. 26(5):1994;32-43.
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 21
    • 0001501655 scopus 로고
    • Applications of a technique for research and development program evaluation
    • Malcolm D.G., Roseboom J.H., Clark C.E., Fazar W. Applications of a technique for research and development program evaluation. Operations Research. 7(5):1959;646-669.
    • (1959) Operations Research , vol.7 , Issue.5 , pp. 646-669
    • Malcolm, D.G.1    Roseboom, J.H.2    Clark, C.E.3    Fazar, W.4
  • 25
    • 0000595031 scopus 로고
    • Robustness and optimality as criteria for strategic decisions
    • Rosenhead J., Elton M., Gupta S.K. Robustness and optimality as criteria for strategic decisions. Operations Research Quarterly. 23(4):1972;413-431.
    • (1972) Operations Research Quarterly , vol.23 , Issue.4 , pp. 413-431
    • Rosenhead, J.1    Elton, M.2    Gupta, S.K.3
  • 30
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu S.D., Storer H.S., Chang P.-C. One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research. 20(1):1993;1-14.
    • (1993) Computers and Operations Research , vol.20 , Issue.1 , pp. 1-14
    • Wu, S.D.1    Storer, H.S.2    Chang, P.-C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.