메뉴 건너뛰기




Volumn 52, Issue 17, 2014, Pages 5236-5254

Solving the integrated lot-sizing and job-shop scheduling problem

Author keywords

integrated approach; job shop scheduling; lagrangian heuristic; lot sizing; production planning; tabu Search

Indexed keywords

HEURISTIC METHODS; ITERATIVE METHODS; MANUFACTURE; PLANNING; PRODUCTION CONTROL; SCHEDULING; TABU SEARCH;

EID: 84905826290     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2014.902156     Document Type: Article
Times cited : (22)

References (33)
  • 3
    • 0020194024 scopus 로고
    • Computational complexity of the capacitated lot size problem
    • Bitran, G. R., and H. H. Yanasse. 1982. "Computational Complexity of the Capacitated Lot Size Problem." Management Science 28 (10): 1174-1187.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1174-1187
    • Bitran, G.R.1    Yanasse, H.H.2
  • 4
    • 77349118693 scopus 로고    scopus 로고
    • Dynamic capacitated lot-sizing problems:aclassification and review of solution approaches
    • Buschkühl, L., S. Florian, H. Stefan, and H. Tempelmeier. 2010. "Dynamic Capacitated Lot-sizing Problems:AClassification and Review of Solution Approaches." OR Spectrum 32 (2): 231-261.
    • (2010) OR Spectrum , vol.32 , Issue.2 , pp. 231-261
    • Buschkühl, L.1    Florian, S.2    Stefan, H.3    Tempelmeier, H.4
  • 8
    • 58049202109 scopus 로고    scopus 로고
    • On the discrete lot-sizing and scheduling problem with sequence-dependent changeover times
    • Gicquel, C.,M.Minoux, andY. Dallery. 2009. "On the Discrete Lot-sizing and Scheduling Problem with Sequence-dependent Changeover Times." Operations Research Letters 37 (1): 32-36.
    • (2009) Operations Research Letters , vol.37 , Issue.1 , pp. 32-36
    • Gicquel, C.1    Minoux, M.2    Dallery, Y.3
  • 10
    • 0242718574 scopus 로고    scopus 로고
    • Discrete optimization methods and their role in the integration of planning and scheduling
    • Grossmann, I. E., S. A. Van den Heever, and I. Harjunkoski. 2002. "Discrete Optimization Methods and their Role in the Integration of Planning and Scheduling." AIChe Symposium Series 326: 150-168.
    • (2002) AIChe Symposium Series , vol.326 , pp. 150-168
    • Grossmann, I.E.1    Van Den Heever, S.A.2    Harjunkoski, I.3
  • 11
    • 0010775487 scopus 로고    scopus 로고
    • Capacitated lot-sizing with sequence dependent setup costs
    • Haase, K. 1996. "Capacitated Lot-sizing with Sequence Dependent Setup Costs." OR Spectrum 18 (1): 51-59.
    • (1996) OR Spectrum , vol.18 , Issue.1 , pp. 51-59
    • Haase, K.1
  • 12
    • 79955056703 scopus 로고    scopus 로고
    • Single and parallelmachine capacitated lotsizing and scheduling: New iterativemip-based neighborhood search heuristics
    • James, R. J.W., and B. Almada-Lobo. 2011. "Single and ParallelMachine Capacitated Lotsizing and Scheduling: New IterativeMIP-based Neighborhood Search Heuristics." Computers & Operations Research 38 (12): 1816-1825.
    • (2011) Computers & Operations Research , vol.38 , Issue.12 , pp. 1816-1825
    • James, R.J.W.1    Almada-Lobo, B.2
  • 13
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem:areview of models andalgorithms
    • Karimi, B., S. M. T. Fatemi Ghomi, and J. M.Wilson. 2003. "The Capacitated Lot Sizing Problem:AReview of Models andAlgorithms." Omega 31 (5): 365-378.
    • (2003) Omega , vol.31 , Issue.5 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.M.T.2    Wilson, J.M.3
  • 14
    • 0000429764 scopus 로고
    • An integrated model for job-shop planning and scheduling
    • Lasserre, J. B. 1992. "An Integrated Model for Job-shop Planning and Scheduling." Management Science 38 (8): 1201-1211.
    • (1992) Management Science , vol.38 , Issue.8 , pp. 1201-1211
    • Lasserre, J.B.1
  • 15
    • 67649756833 scopus 로고    scopus 로고
    • Integrated production planning and scheduling using a decomposition framework
    • Li, Z., and M. G. Ierapetritou. 2009. "Integrated Production Planning and Scheduling using a Decomposition Framework." Chemical Engineering Science 64 (16): 3585-3597.
    • (2009) Chemical Engineering Science , vol.64 , Issue.16 , pp. 3585-3597
    • Li, Z.1    Ierapetritou, M.G.2
  • 16
    • 77951098481 scopus 로고    scopus 로고
    • Production planning and scheduling integration through augmented lagrangian optimization
    • Li, Z., and M. G. Ierapetritou. 2010a. "Production Planning and Scheduling Integration Through Augmented Lagrangian Optimization." Computers & Chemical Engineering 34 (6): 996-1006.
    • (2010) Computers & Chemical Engineering , vol.34 , Issue.6 , pp. 996-1006
    • Li, Z.1    Ierapetritou, M.G.2
  • 17
    • 77957358328 scopus 로고    scopus 로고
    • Rolling horizon based planning and scheduling integration with production capacity consideration
    • Li, Z., and M. G. Ierapetritou. 2010b. "Rolling Horizon Based Planning and Scheduling Integration with Production Capacity Consideration." Chemical Engineering Science 65 (22): 5887-5900.
    • (2010) Chemical Engineering Science , vol.65 , Issue.22 , pp. 5887-5900
    • Li, Z.1    Ierapetritou, M.G.2
  • 18
    • 70249093672 scopus 로고    scopus 로고
    • Integration of production planning and scheduling: Overview, challenges and opportunities
    • Maravelias, C. T., and C. Sung. 2009. "Integration of Production Planning and Scheduling: Overview, Challenges and Opportunities." Computers & Chemical Engineering 33 (12): 1919-1930.
    • (2009) Computers & Chemical Engineering , vol.33 , Issue.12 , pp. 1919-1930
    • Maravelias, C.T.1    Sung, C.2
  • 19
    • 77955925568 scopus 로고    scopus 로고
    • Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration
    • Mateus, G. R., M. Gómez Ravetti, M. C. de Souza, and T. M. Valeriano. 2010. "Capacitated Lot Sizing and Sequence Dependent Setup Scheduling: An Iterative Approach for Integration." Journal of Scheduling 13 (3): 245-259.
    • (2010) Journal of Scheduling , vol.13 , Issue.3 , pp. 245-259
    • Mateus, G.R.1    Gómez Ravetti, M.2    De Souza, M.C.3    Valeriano, T.M.4
  • 20
    • 79958772189 scopus 로고    scopus 로고
    • Capacitated lot-sizing and scheduling with sequence-dependent, periodoverlapping and non-triangular setups
    • Menezes, A. A., A. R. Clark, and B. Almada-Lobo. 2010. "Capacitated Lot-sizing and Scheduling with Sequence-dependent, Periodoverlapping and Non-triangular Setups." Journal of Scheduling 14 (2): 209-219.
    • (2010) Journal of Scheduling , vol.14 , Issue.2 , pp. 209-219
    • Menezes, A.A.1    Clark, A.R.2    Almada-Lobo, B.3
  • 21
    • 0032651376 scopus 로고    scopus 로고
    • The impact of sequencing decisions on multi-item lot sizing and scheduling in flow shops
    • Ouenniche, J., F. F. Boctor, and A. Martel. 1999. "The Impact of Sequencing Decisions on Multi-item Lot Sizing and Scheduling in Flow Shops." International Journal of Production Research 37 (10): 2253-2270.
    • (1999) International Journal of Production Research , vol.37 , Issue.10 , pp. 2253-2270
    • Ouenniche, J.1    Boctor, F.F.2    Martel, A.3
  • 24
    • 84871978684 scopus 로고    scopus 로고
    • Multi-stage simultaneous lot-sizing and scheduling for flow line production
    • Seeanner, F., and H. Meyr. 2013. "Multi-stage Simultaneous Lot-sizing and Scheduling for Flow Line Production." OR Spectrum 35 (1): 33-73.
    • (2013) OR Spectrum , vol.35 , Issue.1 , pp. 33-73
    • Seeanner, F.1    Meyr, H.2
  • 25
    • 84855939615 scopus 로고    scopus 로고
    • Integrated production planning and schedulingoptimization ofmultisite, multiproduct process industry
    • Shah,N.K., andM.G. Ierapetritou. 2012. "Integrated Production Planning and SchedulingOptimization ofMultisite, Multiproduct Process Industry." Computers & Chemical Engineering 37: 214-226.
    • (2012) Computers & Chemical Engineering , vol.37 , pp. 214-226
    • Shah, N.K.1    Ierapetritou, M.G.2
  • 26
    • 80054953355 scopus 로고    scopus 로고
    • Atwo-stage heuristic for singlemachine capacitated lot-sizing and scheduling with sequence-dependent setup costs
    • Shim, I. S., H.-C. Kim, H.-H. Doh, and D.-H. Lee. 2011. "ATwo-stage Heuristic for SingleMachine Capacitated Lot-sizing and Scheduling with Sequence-dependent Setup Costs." Computers & Industrial Engineering 61 (4): 920-929.
    • (2011) Computers & Industrial Engineering , vol.61 , Issue.4 , pp. 920-929
    • Shim, I.S.1    Kim, H.-C.2    Doh, H.-H.3    Lee, D.-H.4
  • 27
    • 0000495984 scopus 로고
    • Economic lot sizing: An o(n log n) algorithm that runs in linear time in the wagner-whitin case
    • Wagelmans, A., S. Van Hoesel, and A. Kolen. 1992. "Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case." Operations Research 40 (1): S145-S156.
    • (1992) Operations Research , vol.40 , Issue.1
    • Wagelmans, A.1    Van Hoesel, S.2    Kolen, A.3
  • 28
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H. M., and T. M. Whitin. 1958. "Dynamic Version of the Economic Lot Size Model." Management Science 5 (1): 89-96.
    • (1958) Management Science , vol.5 , Issue.1 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 32
    • 26644469880 scopus 로고    scopus 로고
    • Integrated optimization of production planning and scheduling for a kind of job-shop
    • Zhang, X. D., and H. S.Yan. 2005. "Integrated Optimization of Production Planning and Scheduling for a Kind of Job-shop." International Journal of Advanced Manufacturing Technology 26 (7-8): 876-886.
    • (2005) International Journal of Advanced Manufacturing Technology , vol.26 , Issue.7-8 , pp. 876-886
    • Zhang, X.D.1    Yan, H.S.2
  • 33
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup: A literature review
    • Zhu, X., and W. E. Wilhelm. 2006. "Scheduling and Lot Sizing with Sequence-dependent Setup: A Literature Review." IIE Transactions 38 (11): 987-1007.
    • (2006) IIE Transactions , vol.38 , Issue.11 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.