-
1
-
-
34548460398
-
Single machine multi-product capacitated lot sizing with sequence-dependent setups
-
Almada-Lobo, B., D. Klabjan, M. A. Carravilla, and J. F. Oliveira. 2007. "Single Machine Multi-product Capacitated Lot Sizing with Sequence-dependent Setups." International Journal of Production Research 45 (20): 4873-4894.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.20
, pp. 4873-4894
-
-
Almada-Lobo, B.1
Klabjan, D.2
Carravilla, M.A.3
Oliveira, J.F.4
-
2
-
-
78650068281
-
Multiple machine continuous setup lotsizing with sequencedependent setups
-
Almada-Lobo, B., D. Klabjan, M. A. Carravilla, and J. F. Oliveira. 2010. "Multiple Machine Continuous Setup Lotsizing with Sequencedependent Setups." Computational Optimization and Applications 47 (3): 529-552.
-
(2010)
Computational Optimization and Applications
, vol.47
, Issue.3
, pp. 529-552
-
-
Almada-Lobo, B.1
Klabjan, D.2
Carravilla, M.A.3
Oliveira, J.F.4
-
3
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
Bitran, G. R., and H. H. Yanasse. 1982. "Computational Complexity of the Capacitated Lot Size Problem." Management Science 28 (10): 1174-1187.
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1174-1187
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
4
-
-
77349118693
-
Dynamic capacitated lot-sizing problems:aclassification and review of solution approaches
-
Buschkühl, L., S. Florian, H. Stefan, and H. Tempelmeier. 2010. "Dynamic Capacitated Lot-sizing Problems:AClassification and Review of Solution Approaches." OR Spectrum 32 (2): 231-261.
-
(2010)
OR Spectrum
, vol.32
, Issue.2
, pp. 231-261
-
-
Buschkühl, L.1
Florian, S.2
Stefan, H.3
Tempelmeier, H.4
-
8
-
-
58049202109
-
On the discrete lot-sizing and scheduling problem with sequence-dependent changeover times
-
Gicquel, C.,M.Minoux, andY. Dallery. 2009. "On the Discrete Lot-sizing and Scheduling Problem with Sequence-dependent Changeover Times." Operations Research Letters 37 (1): 32-36.
-
(2009)
Operations Research Letters
, vol.37
, Issue.1
, pp. 32-36
-
-
Gicquel, C.1
Minoux, M.2
Dallery, Y.3
-
10
-
-
0242718574
-
Discrete optimization methods and their role in the integration of planning and scheduling
-
Grossmann, I. E., S. A. Van den Heever, and I. Harjunkoski. 2002. "Discrete Optimization Methods and their Role in the Integration of Planning and Scheduling." AIChe Symposium Series 326: 150-168.
-
(2002)
AIChe Symposium Series
, vol.326
, pp. 150-168
-
-
Grossmann, I.E.1
Van Den Heever, S.A.2
Harjunkoski, I.3
-
11
-
-
0010775487
-
Capacitated lot-sizing with sequence dependent setup costs
-
Haase, K. 1996. "Capacitated Lot-sizing with Sequence Dependent Setup Costs." OR Spectrum 18 (1): 51-59.
-
(1996)
OR Spectrum
, vol.18
, Issue.1
, pp. 51-59
-
-
Haase, K.1
-
12
-
-
79955056703
-
Single and parallelmachine capacitated lotsizing and scheduling: New iterativemip-based neighborhood search heuristics
-
James, R. J.W., and B. Almada-Lobo. 2011. "Single and ParallelMachine Capacitated Lotsizing and Scheduling: New IterativeMIP-based Neighborhood Search Heuristics." Computers & Operations Research 38 (12): 1816-1825.
-
(2011)
Computers & Operations Research
, vol.38
, Issue.12
, pp. 1816-1825
-
-
James, R.J.W.1
Almada-Lobo, B.2
-
13
-
-
0041511823
-
The capacitated lot sizing problem:areview of models andalgorithms
-
Karimi, B., S. M. T. Fatemi Ghomi, and J. M.Wilson. 2003. "The Capacitated Lot Sizing Problem:AReview of Models andAlgorithms." Omega 31 (5): 365-378.
-
(2003)
Omega
, vol.31
, Issue.5
, pp. 365-378
-
-
Karimi, B.1
Fatemi Ghomi, S.M.T.2
Wilson, J.M.3
-
14
-
-
0000429764
-
An integrated model for job-shop planning and scheduling
-
Lasserre, J. B. 1992. "An Integrated Model for Job-shop Planning and Scheduling." Management Science 38 (8): 1201-1211.
-
(1992)
Management Science
, vol.38
, Issue.8
, pp. 1201-1211
-
-
Lasserre, J.B.1
-
15
-
-
67649756833
-
Integrated production planning and scheduling using a decomposition framework
-
Li, Z., and M. G. Ierapetritou. 2009. "Integrated Production Planning and Scheduling using a Decomposition Framework." Chemical Engineering Science 64 (16): 3585-3597.
-
(2009)
Chemical Engineering Science
, vol.64
, Issue.16
, pp. 3585-3597
-
-
Li, Z.1
Ierapetritou, M.G.2
-
16
-
-
77951098481
-
Production planning and scheduling integration through augmented lagrangian optimization
-
Li, Z., and M. G. Ierapetritou. 2010a. "Production Planning and Scheduling Integration Through Augmented Lagrangian Optimization." Computers & Chemical Engineering 34 (6): 996-1006.
-
(2010)
Computers & Chemical Engineering
, vol.34
, Issue.6
, pp. 996-1006
-
-
Li, Z.1
Ierapetritou, M.G.2
-
17
-
-
77957358328
-
Rolling horizon based planning and scheduling integration with production capacity consideration
-
Li, Z., and M. G. Ierapetritou. 2010b. "Rolling Horizon Based Planning and Scheduling Integration with Production Capacity Consideration." Chemical Engineering Science 65 (22): 5887-5900.
-
(2010)
Chemical Engineering Science
, vol.65
, Issue.22
, pp. 5887-5900
-
-
Li, Z.1
Ierapetritou, M.G.2
-
18
-
-
70249093672
-
Integration of production planning and scheduling: Overview, challenges and opportunities
-
Maravelias, C. T., and C. Sung. 2009. "Integration of Production Planning and Scheduling: Overview, Challenges and Opportunities." Computers & Chemical Engineering 33 (12): 1919-1930.
-
(2009)
Computers & Chemical Engineering
, vol.33
, Issue.12
, pp. 1919-1930
-
-
Maravelias, C.T.1
Sung, C.2
-
19
-
-
77955925568
-
Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration
-
Mateus, G. R., M. Gómez Ravetti, M. C. de Souza, and T. M. Valeriano. 2010. "Capacitated Lot Sizing and Sequence Dependent Setup Scheduling: An Iterative Approach for Integration." Journal of Scheduling 13 (3): 245-259.
-
(2010)
Journal of Scheduling
, vol.13
, Issue.3
, pp. 245-259
-
-
Mateus, G.R.1
Gómez Ravetti, M.2
De Souza, M.C.3
Valeriano, T.M.4
-
20
-
-
79958772189
-
Capacitated lot-sizing and scheduling with sequence-dependent, periodoverlapping and non-triangular setups
-
Menezes, A. A., A. R. Clark, and B. Almada-Lobo. 2010. "Capacitated Lot-sizing and Scheduling with Sequence-dependent, Periodoverlapping and Non-triangular Setups." Journal of Scheduling 14 (2): 209-219.
-
(2010)
Journal of Scheduling
, vol.14
, Issue.2
, pp. 209-219
-
-
Menezes, A.A.1
Clark, A.R.2
Almada-Lobo, B.3
-
21
-
-
0032651376
-
The impact of sequencing decisions on multi-item lot sizing and scheduling in flow shops
-
Ouenniche, J., F. F. Boctor, and A. Martel. 1999. "The Impact of Sequencing Decisions on Multi-item Lot Sizing and Scheduling in Flow Shops." International Journal of Production Research 37 (10): 2253-2270.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.10
, pp. 2253-2270
-
-
Ouenniche, J.1
Boctor, F.F.2
Martel, A.3
-
24
-
-
84871978684
-
Multi-stage simultaneous lot-sizing and scheduling for flow line production
-
Seeanner, F., and H. Meyr. 2013. "Multi-stage Simultaneous Lot-sizing and Scheduling for Flow Line Production." OR Spectrum 35 (1): 33-73.
-
(2013)
OR Spectrum
, vol.35
, Issue.1
, pp. 33-73
-
-
Seeanner, F.1
Meyr, H.2
-
25
-
-
84855939615
-
Integrated production planning and schedulingoptimization ofmultisite, multiproduct process industry
-
Shah,N.K., andM.G. Ierapetritou. 2012. "Integrated Production Planning and SchedulingOptimization ofMultisite, Multiproduct Process Industry." Computers & Chemical Engineering 37: 214-226.
-
(2012)
Computers & Chemical Engineering
, vol.37
, pp. 214-226
-
-
Shah, N.K.1
Ierapetritou, M.G.2
-
26
-
-
80054953355
-
Atwo-stage heuristic for singlemachine capacitated lot-sizing and scheduling with sequence-dependent setup costs
-
Shim, I. S., H.-C. Kim, H.-H. Doh, and D.-H. Lee. 2011. "ATwo-stage Heuristic for SingleMachine Capacitated Lot-sizing and Scheduling with Sequence-dependent Setup Costs." Computers & Industrial Engineering 61 (4): 920-929.
-
(2011)
Computers & Industrial Engineering
, vol.61
, Issue.4
, pp. 920-929
-
-
Shim, I.S.1
Kim, H.-C.2
Doh, H.-H.3
Lee, D.-H.4
-
27
-
-
0000495984
-
Economic lot sizing: An o(n log n) algorithm that runs in linear time in the wagner-whitin case
-
Wagelmans, A., S. Van Hoesel, and A. Kolen. 1992. "Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case." Operations Research 40 (1): S145-S156.
-
(1992)
Operations Research
, vol.40
, Issue.1
-
-
Wagelmans, A.1
Van Hoesel, S.2
Kolen, A.3
-
28
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner, H. M., and T. M. Whitin. 1958. "Dynamic Version of the Economic Lot Size Model." Management Science 5 (1): 89-96.
-
(1958)
Management Science
, vol.5
, Issue.1
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
-
30
-
-
79961180448
-
A new approach for solving integrated planning and scheduling problem
-
Saint Etienne, France
-
Wolosewicz, C., S. Dauzère-Pérès, and R. Aggoune. 2006. "A New Approach for Solving Integrated Planning and Scheduling Problem." In INCOM'06 (12th IFAC Symposium on Information Control Problems in Manufacturing), Vol. 3, 191-196, Saint Etienne, France.
-
(2006)
INCOM'06 (12th IFAC Symposium on Information Control Problems in Manufacturing)
, vol.3
, pp. 191-196
-
-
Wolosewicz, C.1
Dauzère-Pérès, S.2
Aggoune, R.3
-
32
-
-
26644469880
-
Integrated optimization of production planning and scheduling for a kind of job-shop
-
Zhang, X. D., and H. S.Yan. 2005. "Integrated Optimization of Production Planning and Scheduling for a Kind of Job-shop." International Journal of Advanced Manufacturing Technology 26 (7-8): 876-886.
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.26
, Issue.7-8
, pp. 876-886
-
-
Zhang, X.D.1
Yan, H.S.2
-
33
-
-
33748492325
-
Scheduling and lot sizing with sequence-dependent setup: A literature review
-
Zhu, X., and W. E. Wilhelm. 2006. "Scheduling and Lot Sizing with Sequence-dependent Setup: A Literature Review." IIE Transactions 38 (11): 987-1007.
-
(2006)
IIE Transactions
, vol.38
, Issue.11
, pp. 987-1007
-
-
Zhu, X.1
Wilhelm, W.E.2
|