-
1
-
-
0014807274
-
A heuristic algorithm for the n job, m machine sequencing problem
-
Campbell, H. G., Dudek, R. A, and Smith, M. L., 1970, A heuristic algorithm for the n job, m machine sequencing problem. Management Science, 16, 630-637.
-
(1970)
Management Science
, vol.16
, pp. 630-637
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
4
-
-
0017516618
-
An evaluation of flow shop sequencing heuristics
-
Dannenbring, D. G., 1977, An evaluation of flow shop sequencing heuristics. Management Science, 23, 1174-1182.
-
(1977)
Management Science
, vol.23
, pp. 1174-1182
-
-
Dannenbring, D.G.1
-
5
-
-
0028769398
-
Cyclic scheduling to minimize inventory in a batch flow line
-
Dobson, G. and Yano, C. A., 1994, Cyclic scheduling to minimize inventory in a batch flow line. European Journal of Operational Research, 75, 441-461.
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 441-461
-
-
Dobson, G.1
Yano, C.A.2
-
6
-
-
0001740656
-
Common cycle lot-size scheduling for multi-product, multi-stage production
-
El-Najdawi, M. K. and Kleindorder, P. R., 1993, Common cycle lot-size scheduling for multi-product, multi-stage production. Management Science, 39, 872-885.
-
(1993)
Management Science
, vol.39
, pp. 872-885
-
-
El-Najdawi, M.K.1
Kleindorder, P.R.2
-
7
-
-
0028769450
-
A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processes
-
El-Najdawi, M. K., 1994, A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processes. European Journal of Operational Research, 75, 365-377.
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 365-377
-
-
El-Najdawi, M.K.1
-
8
-
-
0017961934
-
Four simple heuristics for scheduling a flowshop
-
Gelders, L. F. and Sambandam, N., 1978, Four simple heuristics for scheduling a flowshop. International Journal of Production Research, 16, 221-231.
-
(1978)
International Journal of Production Research
, vol.16
, pp. 221-231
-
-
Gelders, L.F.1
Sambandam, N.2
-
9
-
-
0025457830
-
Common cycle scheduling in a multistage production process
-
Hsu, J. I. S, and El-Najdawi, M., 1990, Common cycle scheduling in a multistage production process. Engineering Costs and Production Economics, 20, 73-80.
-
(1990)
Engineering Costs and Production Economics
, vol.20
, pp. 73-80
-
-
Hsu, J.1
El-Najdawi, M.2
-
10
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
Nawaz, M., Enscore, E. E. and Ham, I., 1983, A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega, 11, 91-95.
-
(1983)
Omega
, vol.11
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.E.2
Ham, I.3
-
12
-
-
38249025037
-
Simulated annealing for permutation flow shop scheduling
-
Osman, I. H, and Potts, C. N., 1989, Simulated annealing for permutation flow shop scheduling. Omega, 17, 551-557.
-
(1989)
Omega
, vol.17
, pp. 551-557
-
-
Osman, I.H.1
Potts, C.N.2
-
13
-
-
0001393583
-
Sequencing jobs through a multi-stage process in the minimum total time-a quick method of obtaining a near optimum
-
Palmer, D. S., 1965, Sequencing jobs through a multi-stage process in the minimum total time-a quick method of obtaining a near optimum. Operational Research Quarterly, 16, 101-107.
-
(1965)
Operational Research Quarterly
, vol.16
, pp. 101-107
-
-
Palmer, D.S.1
-
14
-
-
0026117836
-
Flowshop scheduling with setup, processing and removal times separated
-
Proust, C., Gupta, J. N. D. and Deschamps, V., 1991, Flowshop scheduling with setup, processing and removal times separated. International Journal of Production Research, 29, 479-483.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 479-483
-
-
Proust, C.1
Gupta, J.N.D.2
Deschamps, V.3
-
15
-
-
0025700701
-
Some efficient heuristic methods for the flow shop sequencing problem
-
Taillard, E., 1990, Some efficient heuristic methods for the flow shop sequencing problem. European Journal of Operational Research, 47, 65-74.
-
(1990)
European Journal of Operational Research
, vol.47
, pp. 65-74
-
-
Taillard, E.1
-
16
-
-
0024700013
-
A new heuristic method for the flow shop sequencing problem
-
Widmer, M. and Hertz, A., 1989, A new heuristic method for the flow shop sequencing problem. European Journal of Operational Research, 41, 186-193.
-
(1989)
European Journal of Operational Research
, vol.41
, pp. 186-193
-
-
Widmer, M.1
Hertz, A.2
|