메뉴 건너뛰기




Volumn , Issue , 2011, Pages 3533-3544

Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity

Author keywords

[No Author keywords available]

Indexed keywords

3D MODELS; BASIC CONCEPTS; CONSTRUCTION ACTIVITIES; CONSTRUCTION SIMULATION; REAL TIME SIMULATIONS; SIMULATION MODEL; SPATIAL MODELING; SPATIO-TEMPORAL; SPATIO-TEMPORAL RESOLUTION; STATISTICAL DATAS; TASK EXECUTIONS;

EID: 84863295559     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2011.6148048     Document Type: Conference Paper
Times cited : (30)

References (33)
  • 1
    • 0033351012 scopus 로고    scopus 로고
    • Special Purpose Simulation Template for Utility Tunnel Construction
    • edited by P.A. Farrington, H.B. Nembhard, D.T. Sturrock, and G.W. Evans, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc
    • AbouRizk, S. M., J. Y. Ruwanpura, K. C. Er, and S. Fernando. 1999. "Special Purpose Simulation Template for Utility Tunnel Construction." In Proceedings of the 1999 Winter Simulation Conference, edited by P.A. Farrington, H.B. Nembhard, D.T. Sturrock, and G.W. Evans, 948-955. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (1999) Proceedings of the 1999 Winter Simulation Conference , pp. 948-955
    • AbouRizk, S.M.1    Ruwanpura, J.Y.2    Er, K.C.3    Fernando, S.4
  • 4
    • 84862789125 scopus 로고    scopus 로고
    • Accessed April 7, 2011
    • Autodesk. 2010. "Autodesk Softimage." Accessed April 7, 2011. http://usa.autodesk.com/adsk/servlet/pc/index?id=13571168&siteID=123112.
    • (2010) Autodesk Softimage
  • 5
    • 70350178839 scopus 로고    scopus 로고
    • A Study of Safety Management using Working Area Information on Construction Site
    • Vilnius, Lithuania: Vilnius Gediminas Technical University Publishing House
    • Chae, S., and T. Yoshida. 2008. "A Study of Safety Management using Working Area Information on Construction Site." In Proceedings of the 25th International Symposium on Automation and Robotics in Construction, 292-299. Vilnius, Lithuania: Vilnius Gediminas Technical University Publishing House.
    • (2008) Proceedings of the 25th International Symposium on Automation and Robotics in Construction , pp. 292-299
    • Chae, S.1    Yoshida, T.2
  • 6
    • 13944281386 scopus 로고    scopus 로고
    • Dynamic layout of construction temporary facilities considering safety
    • DOI 10.1061/(ASCE)0733-9364(2004)130:4(534)
    • Elbeltagi, E., T., Hegazy, and A. Eldosouky. 2004. "Dynamic Layout of Construction Temporary Facilities Considering Safety." Journal of Construction Engineering and Management- ASCE 130(4):534-541. (Pubitemid 40265350)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.4 , pp. 534-541
    • Elbeltagi, E.1    Hegazy, T.2    Eldosouky, A.3
  • 7
    • 2342430993 scopus 로고    scopus 로고
    • Identification and resolution of work space conflicts in building construction
    • DOI 10.1061/(ASCE)0733-9364(2002)128:4(287)
    • Guo, S. 2002. "Identification and Resolution of Workspace Conflicts in Building Construction." Journal of Construction Engineering and Management- ASCE 128(4):287-295. (Pubitemid 40265533)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 287-295
    • Guo, S.-J.1
  • 8
    • 0041304359 scopus 로고    scopus 로고
    • Unified modeling methodology for construction simulation
    • DOI 10.1061/(ASCE)0733-9364(2002)128:2(1)
    • Hajjar, D., and S.M. AbouRizk. 2002. "Unified Modeling Methodology for Construction Simulation."Journal of Construction Engineering and Management- ASCE 128(2):174-185. (Pubitemid 40265565)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.2 , pp. 174-185
    • Hajjar, D.1    AbouRizk, S.M.2
  • 9
    • 0017539255 scopus 로고
    • CYCLONE: Method for Modeling of Job Site Processes
    • Halpin, D.W. 1977. "CYCLONE: Method for Modeling of Job Site Processes." Journal of the Construction Division- ASCE 103(3):489-499.
    • (1977) Journal of the Construction Division- ASCE , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 11
    • 84863263208 scopus 로고    scopus 로고
    • Accessed April 7, 2011
    • Hobby Engine. 2010. Accessed April 7, 2011. http://www.hobbyengine.com. hk/catalog/index.php.
    • (2010)
  • 13
    • 37249065646 scopus 로고    scopus 로고
    • Ubiquitous agent-based communication in construction
    • DOI 10.1061/(ASCE)0887-3801(2008)22:1(31)
    • Lee, J., and L.E. Bernold. 2008. "Ubiquitous Agent-based Communication in Construction." Journal of Computing in Civil Engineering- ASCE 22(1):31-39. (Pubitemid 350265400)
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.1 , pp. 31-39
    • Lee, J.1    Bernold, L.E.2
  • 14
    • 36348997718 scopus 로고    scopus 로고
    • Real-time Decision Support for Planning Concrete Plant Operations Enabled by Integrating Vehicle Tracking Technology, Simulation, and Optimization Algorithms
    • Lu, M., F. Dai, and W. Chen. 2007. "Real-time Decision Support for Planning Concrete Plant Operations Enabled by Integrating Vehicle Tracking Technology, Simulation, and Optimization Algorithms."Canadian Journal of Civil Engineering 34:912-922.
    • (2007) Canadian Journal of Civil Engineering , vol.34 , pp. 912-922
    • Lu, M.1    Dai, F.2    Chen, W.3
  • 15
    • 0032272973 scopus 로고    scopus 로고
    • EZStrobe - General-Purpose Simulation System Based on Activity Cycle Diagrams
    • edited by D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc
    • Martinez, J. C. 1998. "EZStrobe - General-Purpose Simulation System Based on Activity Cycle Diagrams."In Proceedings of the 1998 Winter Simulation Conference, edited by D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, 341-348. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (1998) Proceedings of the 1998 Winter Simulation Conference , pp. 341-348
    • Martinez, J.C.1
  • 16
    • 0035197703 scopus 로고    scopus 로고
    • Modeling airside airport operations using general-purpose, activity-based, discrete-event simulation tools
    • 01-3476
    • Martinez, J. C., A. Trani, and P. Ioannou. 2001. "Modeling Air-Side Airport Operations Using General- Purpose Activity-Based Discrete-Event Simulation." Transportation Research Record: Journal of the Transportation Research Board, 1744, 65-71. (Pubitemid 33099073)
    • (2001) Transportation Research Record , Issue.1744 , pp. 65-71
    • Martinez, J.C.1    Trani, A.A.2    Ioannou, P.G.3
  • 18
    • 68249084603 scopus 로고    scopus 로고
    • Position Estimation from UWB Pseudorange and Angle-ofarrival: A Comparison of Non-linear Regression and Kalman Filtering
    • edited by T. Choudhury, A. Quigley, T. Strang, and K. Suginuma, Berlin, Heidelberg: Springer-Verlag
    • Muthukrishnan, K., and M. Hazas. 2009. "Position Estimation from UWB Pseudorange and Angle-ofarrival: a Comparison of Non-linear Regression and Kalman Filtering." In Proceedings of the 4th International Symposium on Location and Context Awareness, edited by T. Choudhury, A. Quigley, T. Strang, and K. Suginuma, 222-239. Berlin, Heidelberg: Springer-Verlag.
    • (2009) Proceedings of the 4th International Symposium on Location and Context Awareness , pp. 222-239
    • Muthukrishnan, K.1    Hazas, M.2
  • 19
    • 14544298805 scopus 로고    scopus 로고
    • Automated project performance control of construction projects
    • DOI 10.1016/j.autcon.2004.09.006, PII S0926580504001232, 20th International Symposium on Automation and Robotics in Construction: The Future Site
    • Navon, R. 2005. "Automated Project Performance Control of Construction Projects." Automation in Construction 14 (4):467-476. (Pubitemid 40305009)
    • (2005) Automation in Construction , vol.14 , Issue.4 , pp. 467-476
    • Navon, R.1
  • 21
    • 84863263213 scopus 로고    scopus 로고
    • Accessed April 7, 2011
    • Phidgets. 2010. Accessed April 7, 2011. http://www.phidgets.com/.
    • (2010)
  • 22
    • 33748342338 scopus 로고    scopus 로고
    • SightSafety: A hybrid information and communication technology system for reducing vehicle/pedestrian collisions
    • DOI 10.1016/j.autcon.2005.09.004, PII S0926580505001299, Knowledge Enabled Information System Applications in Construction
    • Riaz, Z., D.J. Edwards, and A. Thorpe. 2006. "SightSafety: A Hybrid Information and Communication Technology System for Reducing Vehicle/Pedestrian Collisions." Automation in Construction 15:719-728. (Pubitemid 44335851)
    • (2006) Automation in Construction , vol.15 , Issue.6 , pp. 719-728
    • Riaz, Z.1    Edwards, D.J.2    Thorpe, A.3
  • 23
    • 70350183589 scopus 로고    scopus 로고
    • Crane Simulators as Training Tools
    • March-April 2005: Accessed April 7, 2011
    • Ritchie, D. 2005. "Crane Simulators as Training Tools." CraneWorks March-April 2005:16. Simlog. 2010. Accessed April 7, 2011. http://www.simlog.ca.
    • (2005) CraneWorks , pp. 16
    • Ritchie, D.1
  • 24
    • 60749134419 scopus 로고    scopus 로고
    • A Framework for Real-time Simulation of Heavy Construction Operations
    • edited by S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc
    • Song, L., F. Ramos, and K. Arnold. 2008. "A Framework for Real-time Simulation of Heavy Construction Operations." In Proceedings of the 2008 Winter Simulation Conference, edited by S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler, 2387-2395. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2008) Proceedings of the 2008 Winter Simulation Conference , pp. 2387-2395
    • Song, L.1    Ramos, F.2    Arnold, K.3
  • 25
    • 84891322445 scopus 로고    scopus 로고
    • Combined Ultra-wideband Positioning and Range Imaging Sensing for Productivity and Safety Monitoring in Building Construction
    • edited by L. Soibelman, and B. Akinci, Pittsburgh, Pennsylvania: American Society of Civil Engineers Press
    • Teizer, J., and D. Castro-Lacouture. 2007. "Combined Ultra-wideband Positioning and Range Imaging Sensing for Productivity and Safety Monitoring in Building Construction." In Proceedings of the 2007 ASCE International Workshop on Computing in Civil Engineering- ASCE, edited by L. Soibelman, and B. Akinci, 681-688. Pittsburgh, Pennsylvania: American Society of Civil Engineers Press.
    • (2007) Proceedings of the 2007 ASCE International Workshop on Computing in Civil Engineering- ASCE , pp. 681-688
    • Teizer, J.1    Castro-Lacouture, D.2
  • 26
    • 84863263211 scopus 로고    scopus 로고
    • Accessed April 7, 2011
    • Trimble. 2010. "Trimble GCS900 Grade Control System." Accessed April 7, 2011. http://www.trimble.com/GCS900.shtml.
    • (2010) Trimble GCS900 Grade Control System
  • 27
    • 84863235252 scopus 로고    scopus 로고
    • Accessed April 7, 2011
    • Ubisense. 2010. Accessed April 7, 2011. http://www.ubisense.net/en.
    • (2010)
  • 28
    • 0035278717 scopus 로고    scopus 로고
    • Simulation of concrete batch plant production
    • DOI 10.1061/(ASCE)0733-9364(2001)127:2(132)
    • Zayed, T. M., and D. Halpin. 2001. "Simulation of Concrete Batch Plant Production." Journal of Construction Engineering and Management - ASCE 127(2):132-141. (Pubitemid 32297261)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.2 , pp. 132-141
    • Zayed, T.M.1    Halpin, D.2
  • 31
  • 32
    • 33847335678 scopus 로고    scopus 로고
    • Cell-based Representation and Analysis of Spatial Resources in Construction Simulation
    • Zhang, C., A. Hammad, T.M. Zayed, G. Wainer, and H. Pang. 2007. "Cell-based Representation and Analysis of Spatial Resources in Construction Simulation." Journal of Automation in Construction 16(4):436-448.
    • (2007) Journal of Automation in Construction , vol.16 , Issue.4 , pp. 436-448
    • Zhang, C.1    Hammad, A.2    Zayed, T.M.3    Wainer, G.4    Pang, H.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.