메뉴 건너뛰기




Volumn 139, Issue 6, 2013, Pages 665-674

Stabilizing production flow of interior and finishing works with reentrant flow in building construction

Author keywords

Computer aided simulation; Construction management; Contractors; Flow control; Lean construction; Production management; Subcontractors

Indexed keywords

COMPUTER AIDED SIMULATIONS; CONSTRUCTION MANAGEMENT; LEAN CONSTRUCTION; PRODUCTION MANAGEMENT; SUBCONTRACTORS;

EID: 84877728352     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000595     Document Type: Article
Times cited : (45)

References (21)
  • 3
    • 0030212629 scopus 로고    scopus 로고
    • The job shop scheduling problem: Conventional and new solution techniques
    • EJORDT 0377-2217 10.1016/0377-2217(95)00362-2
    • Blazewicz, J., Domschke, W., and, Pesch, E. (1996). " The job shop scheduling problem: Conventional and new solution techniques." Eur. J. Oper. Res., 93 (1), 1-33. EJORDT 0377-2217 10.1016/0377-2217(95)00362-2
    • (1996) Eur. J. Oper. Res. , vol.93 , Issue.1 , pp. 1-33
    • Blazewicz, J.1    Domschke, W.2    Pesch, E.3
  • 4
    • 84855462080 scopus 로고    scopus 로고
    • Understanding flow and microvariability in construction: Theory and practice
    • C. Pasquire and P. Tzortzopoulous, eds. Michigan State Univ. East Lansing, MI.
    • Brodetskaia, I., and, Sacks, R. (2007). " Understanding flow and microvariability in construction: Theory and practice." Proc., 15th Annual Conf. of the Int. Group for Lean Construction, C. Pasquire and P. Tzortzopoulous., eds., Michigan State Univ., East Lansing, MI, 488-497.
    • (2007) Proc., 15th Annual Conf. of the Int. Group for Lean Construction , pp. 488-497
    • Brodetskaia, I.1    Sacks, R.2
  • 5
    • 84855431214 scopus 로고    scopus 로고
    • A workflow model for finishing works in building construction
    • 0144-6193 10.1080/01446193.2011.647829
    • Brodetskaia, I., Sacks, R., and, Shapira, A. (2011). " A workflow model for finishing works in building construction." Constr. Manage. Econ., 29 (12), 1209-1227. 0144-6193 10.1080/01446193.2011.647829
    • (2011) Constr. Manage. Econ. , vol.29 , Issue.12 , pp. 1209-1227
    • Brodetskaia, I.1    Sacks, R.2    Shapira, A.3
  • 8
    • 0003926816 scopus 로고    scopus 로고
    • North River Press, Great Barrington, MA.
    • Goldratt, E. M. (1997). Critical chain, North River Press, Great Barrington, MA.
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 9
    • 31644451948 scopus 로고    scopus 로고
    • Job shop scheduling techniques in semiconductor manufacturing
    • IJATEA 0268-3768 10.1007/s00170-004-2296-z
    • Gupta, A. K., and, Sivakumar, A. I. (2006). " Job shop scheduling techniques in semiconductor manufacturing." Int. J. Adv. Manuf. Technol., 27 (11-12), 1163-1169. IJATEA 0268-3768 10.1007/s00170-004-2296-z
    • (2006) Int. J. Adv. Manuf. Technol. , vol.27 , Issue.1112 , pp. 1163-1169
    • Gupta, A.K.1    Sivakumar, A.I.2
  • 10
    • 0003656231 scopus 로고
    • Technical. Rep. No. 72, Center for Integrated Facility Eng. Dept. of Civil Eng. Stanford Univ. Stanford, CA.
    • Koskela, L. (1992). " Application of the new production philosophy to construction." Technical. Rep. No. 72, Center for Integrated Facility Eng., Dept. of Civil Eng., Stanford Univ., Stanford, CA.
    • (1992) Application of the New Production Philosophy to Construction
    • Koskela, L.1
  • 12
    • 0032677122 scopus 로고    scopus 로고
    • General purpose systems for effective construction simulation
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:4(265)
    • Martinez, J. C., and, Ioannou, P. G. (1999). " General purpose systems for effective construction simulation." J. Constr. Eng. Manage., 125 (4), 265-276. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:4(265)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.4 , pp. 265-276
    • Martinez, J.C.1    Ioannou, P.G.2
  • 15
    • 84877744964 scopus 로고    scopus 로고
    • [Computer software]. ProModel Corp. Allentown, PA.
    • ProModel V6.1.4 [Computer software]. ProModel Corp., Allentown, PA.
    • ProModel V6.1.4
  • 16
    • 0036140878 scopus 로고    scopus 로고
    • The evidence of complex variability in construction labour productivity
    • 0144-6193 10.1080/01446190110098961
    • Radosavljevic, M., and, Horner, R. M. W. (2002). " The evidence of complex variability in construction labour productivity." Constr. Manage. Econ., 20 (1), 3-12. 0144-6193 10.1080/01446190110098961
    • (2002) Constr. Manage. Econ. , vol.20 , Issue.1 , pp. 3-12
    • Radosavljevic, M.1    Horner, R.M.W.2
  • 17
    • 34247224920 scopus 로고    scopus 로고
    • LEAPCON: Simulation of lean construction of high-rise apartment buildings
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:7(529)
    • Sacks, R., Esquenazi, A., and, Goldin, M. (2007). " LEAPCON: Simulation of lean construction of high-rise apartment buildings." J. Constr. Eng. Manage., 133 (7), 529-539. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2007)133:7(529)
    • (2007) J. Constr. Eng. Manage. , vol.133 , Issue.7 , pp. 529-539
    • Sacks, R.1    Esquenazi, A.2    Goldin, M.3
  • 18
    • 34247279276 scopus 로고    scopus 로고
    • Lean Management Model for Construction of High-Rise Apartment Buildings
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:5(374)
    • Sacks, R., and, Goldin, M. (2007). " Lean Management Model for Construction of High-Rise Apartment Buildings." J. Constr. Eng. Manage., 133 (5), 374-384. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:5(374)
    • (2007) J. Constr. Eng. Manage. , vol.133 , Issue.5 , pp. 374-384
    • Sacks, R.1    Goldin, M.2
  • 19
    • 77955687856 scopus 로고    scopus 로고
    • Principles for building information modeling based lean production management systems for construction
    • AUCOES 0926-5805 10.1016/j.autcon.2010.02.010
    • Sacks, R., Radosavljevic, M., and, Barak, R. (2010). " Principles for building information modeling based lean production management systems for construction." Autom. Constr., 19 (5), 641-655. AUCOES 0926-5805 10.1016/j.autcon.2010.02.010
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 641-655
    • Sacks, R.1    Radosavljevic, M.2    Barak, R.3
  • 20
    • 13944264322 scopus 로고    scopus 로고
    • Reducing variability to improve performance as a lean construction principle
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2002)128:2(144)
    • Thomas, H. R., Horman, M. J., de Souza, U. E. L., and, Zavrski, I. (2002). " Reducing variability to improve performance as a lean construction principle." J. Constr. Eng. Manage., 128 (2), 144-154. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2002)128:2(144)
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 144-154
    • Thomas, H.R.1    Horman, M.J.2    De Souza, U.E.L.3    Zavrski, I.4
  • 21
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:5(304)
    • Tommelein, I. D., Riley, D. R., and, Howell, G. A. (1999). " Parade game: Impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125 (5), 304-310. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999) 125:5(304)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.R.2    Howell, G.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.