-
3
-
-
0030212629
-
The job shop scheduling problem: Conventional and new solution techniques
-
EJORDT 0377-2217 10.1016/0377-2217(95)00362-2
-
Blazewicz, J., Domschke, W., and, Pesch, E. (1996). " The job shop scheduling problem: Conventional and new solution techniques." Eur. J. Oper. Res., 93 (1), 1-33. EJORDT 0377-2217 10.1016/0377-2217(95)00362-2
-
(1996)
Eur. J. Oper. Res.
, vol.93
, Issue.1
, pp. 1-33
-
-
Blazewicz, J.1
Domschke, W.2
Pesch, E.3
-
4
-
-
84855462080
-
Understanding flow and microvariability in construction: Theory and practice
-
C. Pasquire and P. Tzortzopoulous, eds. Michigan State Univ. East Lansing, MI.
-
Brodetskaia, I., and, Sacks, R. (2007). " Understanding flow and microvariability in construction: Theory and practice." Proc., 15th Annual Conf. of the Int. Group for Lean Construction, C. Pasquire and P. Tzortzopoulous., eds., Michigan State Univ., East Lansing, MI, 488-497.
-
(2007)
Proc., 15th Annual Conf. of the Int. Group for Lean Construction
, pp. 488-497
-
-
Brodetskaia, I.1
Sacks, R.2
-
5
-
-
84855431214
-
A workflow model for finishing works in building construction
-
0144-6193 10.1080/01446193.2011.647829
-
Brodetskaia, I., Sacks, R., and, Shapira, A. (2011). " A workflow model for finishing works in building construction." Constr. Manage. Econ., 29 (12), 1209-1227. 0144-6193 10.1080/01446193.2011.647829
-
(2011)
Constr. Manage. Econ.
, vol.29
, Issue.12
, pp. 1209-1227
-
-
Brodetskaia, I.1
Sacks, R.2
Shapira, A.3
-
6
-
-
0035707078
-
-
Proc. Winter Simulation Conf. 2001, IEEE, New York.
-
Duwayri, Z., Mollaghasemi, M., and, Nazzal, D. (2001). " Scheduling setup changes at bottleneck facilities in semiconductor manufacturing." Proc., Winter Simulation Conf., 2001, IEEE, New York, 1208-1214.
-
(2001)
Scheduling Setup Changes at Bottleneck Facilities in Semiconductor Manufacturing
, pp. 1208-1214
-
-
Duwayri, Z.1
Mollaghasemi, M.2
Nazzal, D.3
-
8
-
-
0003926816
-
-
North River Press, Great Barrington, MA.
-
Goldratt, E. M. (1997). Critical chain, North River Press, Great Barrington, MA.
-
(1997)
Critical Chain
-
-
Goldratt, E.M.1
-
9
-
-
31644451948
-
Job shop scheduling techniques in semiconductor manufacturing
-
IJATEA 0268-3768 10.1007/s00170-004-2296-z
-
Gupta, A. K., and, Sivakumar, A. I. (2006). " Job shop scheduling techniques in semiconductor manufacturing." Int. J. Adv. Manuf. Technol., 27 (11-12), 1163-1169. IJATEA 0268-3768 10.1007/s00170-004-2296-z
-
(2006)
Int. J. Adv. Manuf. Technol.
, vol.27
, Issue.1112
, pp. 1163-1169
-
-
Gupta, A.K.1
Sivakumar, A.I.2
-
10
-
-
0003656231
-
-
Technical. Rep. No. 72, Center for Integrated Facility Eng. Dept. of Civil Eng. Stanford Univ. Stanford, CA.
-
Koskela, L. (1992). " Application of the new production philosophy to construction." Technical. Rep. No. 72, Center for Integrated Facility Eng., Dept. of Civil Eng., Stanford Univ., Stanford, CA.
-
(1992)
Application of the New Production Philosophy to Construction
-
-
Koskela, L.1
-
12
-
-
0032677122
-
General purpose systems for effective construction simulation
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:4(265)
-
Martinez, J. C., and, Ioannou, P. G. (1999). " General purpose systems for effective construction simulation." J. Constr. Eng. Manage., 125 (4), 265-276. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:4(265)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.4
, pp. 265-276
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
14
-
-
85055795333
-
-
CRC Press, Boca Raton, FL.
-
O'Brien, W., Formoso, C., London, K., and, Vrijhoef, R. (2008). Construction supply chain management handbook, CRC Press, Boca Raton, FL.
-
(2008)
Construction Supply Chain Management Handbook
-
-
O'Brien, W.1
Formoso, C.2
London, K.3
Vrijhoef, R.4
-
15
-
-
84877744964
-
-
[Computer software]. ProModel Corp. Allentown, PA.
-
ProModel V6.1.4 [Computer software]. ProModel Corp., Allentown, PA.
-
ProModel V6.1.4
-
-
-
16
-
-
0036140878
-
The evidence of complex variability in construction labour productivity
-
0144-6193 10.1080/01446190110098961
-
Radosavljevic, M., and, Horner, R. M. W. (2002). " The evidence of complex variability in construction labour productivity." Constr. Manage. Econ., 20 (1), 3-12. 0144-6193 10.1080/01446190110098961
-
(2002)
Constr. Manage. Econ.
, vol.20
, Issue.1
, pp. 3-12
-
-
Radosavljevic, M.1
Horner, R.M.W.2
-
17
-
-
34247224920
-
LEAPCON: Simulation of lean construction of high-rise apartment buildings
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:7(529)
-
Sacks, R., Esquenazi, A., and, Goldin, M. (2007). " LEAPCON: Simulation of lean construction of high-rise apartment buildings." J. Constr. Eng. Manage., 133 (7), 529-539. JCEMD4 0733-9364 10.1061/(ASCE)0733- 9364(2007)133:7(529)
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, Issue.7
, pp. 529-539
-
-
Sacks, R.1
Esquenazi, A.2
Goldin, M.3
-
18
-
-
34247279276
-
Lean Management Model for Construction of High-Rise Apartment Buildings
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:5(374)
-
Sacks, R., and, Goldin, M. (2007). " Lean Management Model for Construction of High-Rise Apartment Buildings." J. Constr. Eng. Manage., 133 (5), 374-384. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:5(374)
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, Issue.5
, pp. 374-384
-
-
Sacks, R.1
Goldin, M.2
-
19
-
-
77955687856
-
Principles for building information modeling based lean production management systems for construction
-
AUCOES 0926-5805 10.1016/j.autcon.2010.02.010
-
Sacks, R., Radosavljevic, M., and, Barak, R. (2010). " Principles for building information modeling based lean production management systems for construction." Autom. Constr., 19 (5), 641-655. AUCOES 0926-5805 10.1016/j.autcon.2010.02.010
-
(2010)
Autom. Constr.
, vol.19
, Issue.5
, pp. 641-655
-
-
Sacks, R.1
Radosavljevic, M.2
Barak, R.3
-
20
-
-
13944264322
-
Reducing variability to improve performance as a lean construction principle
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2002)128:2(144)
-
Thomas, H. R., Horman, M. J., de Souza, U. E. L., and, Zavrski, I. (2002). " Reducing variability to improve performance as a lean construction principle." J. Constr. Eng. Manage., 128 (2), 144-154. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2002)128:2(144)
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.2
, pp. 144-154
-
-
Thomas, H.R.1
Horman, M.J.2
De Souza, U.E.L.3
Zavrski, I.4
-
21
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:5(304)
-
Tommelein, I. D., Riley, D. R., and, Howell, G. A. (1999). " Parade game: Impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125 (5), 304-310. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999) 125:5(304)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
|