메뉴 건너뛰기




Volumn 8580 LNCS, Issue PART 2, 2014, Pages 47-59

On modelling approaches for planning and scheduling in food processing industry

Author keywords

Capacitated lot sizing and scheduling; food processing industry; non triangular setups; perishability; product decay; sequence dependent setups

Indexed keywords

PRODUCTION CONTROL; SCHEDULING;

EID: 84904917731     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/978-3-319-09129-7_4     Document Type: Conference Paper
Times cited : (4)

References (46)
  • 2
    • 35248840078 scopus 로고    scopus 로고
    • A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    • Almada-Lobo, B., Oliveira, J.F., Carravilla, M.A.: A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers & Operations Research 35(4), 1374-1376 (2008)
    • (2008) Computers & Operations Research , vol.35 , Issue.4 , pp. 1374-1376
    • Almada-Lobo, B.1    Oliveira, J.F.2    Carravilla, M.A.3
  • 4
    • 84871258510 scopus 로고    scopus 로고
    • A continuous-time milp model for short-term scheduling of make-and-pack production processes
    • Baumann, P., Trautmann, N.: A continuous-time milp model for short-term scheduling of make-and-pack production processes. International Journal of Production Research 51(6), 1707-1727 (2012)
    • (2012) International Journal of Production Research , vol.51 , Issue.6 , pp. 1707-1727
    • Baumann, P.1    Trautmann, N.2
  • 5
    • 77955714368 scopus 로고    scopus 로고
    • Integrated production and distribution planning in the fast moving consumer goods industry: A block planning application
    • Bilgen, B., Günther, H.O.: Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application. OR Spectrum 32(4), 927-955 (2010)
    • (2010) OR Spectrum , vol.32 , Issue.4 , pp. 927-955
    • Bilgen, B.1    Günther, H.O.2
  • 6
    • 57649159122 scopus 로고    scopus 로고
    • Production scheduling and vehicle routing with time windows for perishable food products
    • Chen, H.-K., Hsueh, C.-F., Chang, M.-S.: Production scheduling and vehicle routing with time windows for perishable food products. Computers & Operations Research 36(7), 2311-2319 (2009)
    • (2009) Computers & Operations Research , vol.36 , Issue.7 , pp. 2311-2319
    • Chen, H.-K.1    Hsueh, C.-F.2    Chang, M.-S.3
  • 8
    • 79951846026 scopus 로고    scopus 로고
    • Lot sizing and scheduling: Industrial extensions and research opportunities
    • Clark, A., Almada-Lobo, B., Almeder, C.: Lot sizing and scheduling: industrial extensions and research opportunities. International Journal of Production Research 49(9), 2457-2461 (2011)
    • (2011) International Journal of Production Research , vol.49 , Issue.9 , pp. 2457-2461
    • Clark, A.1    Almada-Lobo, B.2    Almeder, C.3
  • 9
    • 0001586288 scopus 로고    scopus 로고
    • A cutting plane approach to capacitated lot-sizing with start-up costs
    • Constantino, M.: A cutting plane approach to capacitated lot-sizing with start-up costs. Mathematical Programming 75(3), 353-376 (1996)
    • (1996) Mathematical Programming , vol.75 , Issue.3 , pp. 353-376
    • Constantino, M.1
  • 11
    • 0031170482 scopus 로고    scopus 로고
    • Lot sizing and scheduling - Survey and extensions
    • Drexl, A., Kimms, A.: Lot sizing and scheduling - survey and extensions. European Journal of Operational Research 99(2), 221-235 (1997)
    • (1997) European Journal of Operational Research , vol.99 , Issue.2 , pp. 221-235
    • Drexl, A.1    Kimms, A.2
  • 12
    • 0023456043 scopus 로고
    • Solving multi-item capacitated lot-sizing problems using variable redefinition
    • Eppen, G.D., Martin, R.K.: Solving multi-item capacitated lot-sizing problems using variable redefinition. Operations Research 35(6), 832-848 (1987)
    • (1987) Operations Research , vol.35 , Issue.6 , pp. 832-848
    • Eppen, G.D.1    Martin, R.K.2
  • 13
    • 58149250389 scopus 로고    scopus 로고
    • Solution approaches for the soft drink integrated production lot sizing and scheduling problem
    • Ferreira, D., Morabito, R., Rangel, S.: Solution approaches for the soft drink integrated production lot sizing and scheduling problem. European Journal of Operational Research 196(2), 697-706 (2009)
    • (2009) European Journal of Operational Research , vol.196 , Issue.2 , pp. 697-706
    • Ferreira, D.1    Morabito, R.2    Rangel, S.3
  • 14
    • 0025384312 scopus 로고
    • The discrete lot-sizing and scheduling problem
    • Fleischmann, B.: The discrete lot-sizing and scheduling problem. European Journal of Operational Research 44(3), 337-348 (1990)
    • (1990) European Journal of Operational Research , vol.44 , Issue.3 , pp. 337-348
    • Fleischmann, B.1
  • 15
    • 0028769382 scopus 로고
    • The discrete lot-sizing and scheduling problem with sequence-dependent setup costs
    • Fleischmann, B.: The discrete lot-sizing and scheduling problem with sequence-dependent setup costs. European Journal of Operational Research 75(2), 395-404 (1994)
    • (1994) European Journal of Operational Research , vol.75 , Issue.2 , pp. 395-404
    • Fleischmann, B.1
  • 16
    • 0008655177 scopus 로고    scopus 로고
    • The general lotsizing and scheduling problem
    • Fleischmann, B., Meyr, H.: The general lotsizing and scheduling problem. Or Spektrum 19(1), 11-21 (1997)
    • (1997) Or Spektrum , vol.19 , Issue.1 , pp. 11-21
    • Fleischmann, B.1    Meyr, H.2
  • 17
    • 0034692671 scopus 로고    scopus 로고
    • A modified framework for modelling set-up carryover in the capacitated lotsizing problem
    • Gopalakrishnan, M.: A modified framework for modelling set-up carryover in the capacitated lotsizing problem. International Journal of Production Research 38(14), 3421-3424 (2000)
    • (2000) International Journal of Production Research , vol.38 , Issue.14 , pp. 3421-3424
    • Gopalakrishnan, M.1
  • 19
    • 33746821809 scopus 로고    scopus 로고
    • Realizing block planning concepts in make-and-pack production using milp modelling and sap apo
    • Günther, H.O., Grunow, M., Neuhaus, U.: Realizing block planning concepts in make-and-pack production using milp modelling and sap apo. International Journal of Production Research 44(18-19), 3711-3726 (2006)
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3711-3726
    • Günther, H.O.1    Grunow, M.2    Neuhaus, U.3
  • 20
    • 5644274147 scopus 로고    scopus 로고
    • The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
    • Gupta, D., Magnusson, T.: The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers & Operations Research 32(4), 727-747 (2005)
    • (2005) Computers & Operations Research , vol.32 , Issue.4 , pp. 727-747
    • Gupta, D.1    Magnusson, T.2
  • 21
    • 0010775487 scopus 로고    scopus 로고
    • Capacitated lot-sizing with sequence dependent setup costs
    • Haase, K.: Capacitated lot-sizing with sequence dependent setup costs. Or Spektrum 18(1), 51-59 (1996)
    • (1996) Or Spektrum , vol.18 , Issue.1 , pp. 51-59
    • Haase, K.1
  • 22
    • 0033690423 scopus 로고    scopus 로고
    • Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
    • Haase, K., Kimms, A.: Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. International Journal of Production Economics 66(2), 159-169 (2000)
    • (2000) International Journal of Production Economics , vol.66 , Issue.2 , pp. 159-169
    • Haase, K.1    Kimms, A.2
  • 24
    • 0032069649 scopus 로고    scopus 로고
    • Discrete lotsizing and scheduling by batch sequencing
    • Jordan, C., Drexl, A.: Discrete lotsizing and scheduling by batch sequencing. Management Science 44(5), 698-713 (1998)
    • (1998) Management Science , vol.44 , Issue.5 , pp. 698-713
    • Jordan, C.1    Drexl, A.2
  • 26
    • 0022022738 scopus 로고
    • The deterministic dynamic product cycling problem
    • Karmarkar, U.S., Schrage, L.: The deterministic dynamic product cycling problem. Operations Research 33(2), 326-345 (1985)
    • (1985) Operations Research , vol.33 , Issue.2 , pp. 326-345
    • Karmarkar, U.S.1    Schrage, L.2
  • 27
    • 84855447544 scopus 로고    scopus 로고
    • Simultaneous production and logistics operations planning in semicontinuous food industries
    • Kopanos, G.M., Puigjaner, L., Georgiadis, M.C.: Simultaneous production and logistics operations planning in semicontinuous food industries. Omega 40(5), 634-650 (2012)
    • (2012) Omega , vol.40 , Issue.5 , pp. 634-650
    • Kopanos, G.M.1    Puigjaner, L.2    Georgiadis, M.C.3
  • 28
    • 5644303213 scopus 로고    scopus 로고
    • Planning and scheduling in supply chains: An overview of issues in practice
    • Kreipl, S., Pinedo, M.: Planning and scheduling in supply chains: an overview of issues in practice. Production and Operations Management 13(1), 77-92 (2004)
    • (2004) Production and Operations Management , vol.13 , Issue.1 , pp. 77-92
    • Kreipl, S.1    Pinedo, M.2
  • 30
    • 77952549238 scopus 로고    scopus 로고
    • Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs
    • Lee, I.S., Yoon, S.H.: Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs. Omega-International Journal of Management Science 38(6), 509-521 (2010)
    • (2010) Omega-International Journal of Management Science , vol.38 , Issue.6 , pp. 509-521
    • Lee, I.S.1    Yoon, S.H.2
  • 31
    • 30844436140 scopus 로고    scopus 로고
    • Mixed-integer linear programming approaches to shelf-life-integrated planning and scheduling in yoghurt production
    • Lütke Entrup, M., Günther, H.O., Van Beek, P., Grunow, M., Seiler, T.: Mixed-integer linear programming approaches to shelf-life-integrated planning and scheduling in yoghurt production. International Journal of Production Research 43(23), 5071-5100 (2005)
    • (2005) International Journal of Production Research , vol.43 , Issue.23 , pp. 5071-5100
    • Lütke Entrup, M.1    Günther, H.O.2    Van Beek, P.3    Grunow, M.4    Seiler, T.5
  • 32
    • 79958772189 scopus 로고    scopus 로고
    • Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
    • Menezes, A.A., Clark, A., Almada-Lobo, B.: Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups. Journal of Scheduling 14(2), 209-219 (2011)
    • (2011) Journal of Scheduling , vol.14 , Issue.2 , pp. 209-219
    • Menezes, A.A.1    Clark, A.2    Almada-Lobo, B.3
  • 33
    • 0033903519 scopus 로고    scopus 로고
    • Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
    • Meyr, H.: Simultaneous lotsizing and scheduling by combining local search with dual reoptimization. European Journal of Operational Research 120(2), 311-326 (2000)
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 311-326
    • Meyr, H.1
  • 37
    • 0000967878 scopus 로고
    • Some extensions of the discrete lotsizing and scheduling problem
    • Salomon, M., Kroon, L.G., Kuik, R., Vanwassenhove, L.N.: Some extensions of the discrete lotsizing and scheduling problem. Management Science 37(7), 801-812 (1991)
    • (1991) Management Science , vol.37 , Issue.7 , pp. 801-812
    • Salomon, M.1    Kroon, L.G.2    Kuik, R.3    Vanwassenhove, L.N.4
  • 38
    • 0001532011 scopus 로고    scopus 로고
    • Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows
    • Salomon, M., Solomon, M.M., VanWassenhove, L.N., Dumas, Y., DauzerePeres, S.: Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows. European Journal of Operational Research 100(3), 494-513 (1997)
    • (1997) European Journal of Operational Research , vol.100 , Issue.3 , pp. 494-513
    • Salomon, M.1    Solomon, M.M.2    VanWassenhove, L.N.3    Dumas, Y.4    DauzerePeres, S.5
  • 40
    • 1542475830 scopus 로고    scopus 로고
    • A basic period approach to the economic lot scheduling problem with shelf life considerations
    • Soman, C.A., van Donk, D.P., Gaalman, G.J.C.: A basic period approach to the economic lot scheduling problem with shelf life considerations. International Journal of Production Research 42(8), 1677-1689 (2004b)
    • (2004) International Journal of Production Research , vol.42 , Issue.8 , pp. 1677-1689
    • Soman, C.A.1    Van Donk, D.P.2    Gaalman, G.J.C.3
  • 41
    • 34249948810 scopus 로고    scopus 로고
    • Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study
    • Soman, C.A., van Donk, D.P., Gaalman, G.J.C.: Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study. International Journal of Production Economics 108(1-2), 191-199 (2007)
    • (2007) International Journal of Production Economics , vol.108 , Issue.1-2 , pp. 191-199
    • Soman, C.A.1    Van Donk, D.P.2    Gaalman, G.J.C.3
  • 42
    • 0032627684 scopus 로고    scopus 로고
    • The capacitated lot sizing problem with setup carry-over
    • Sox, C.R., Gao, Y.B.: The capacitated lot sizing problem with setup carry-over. Iie Transactions 31(2), 173-181 (1999)
    • (1999) Iie Transactions , vol.31 , Issue.2 , pp. 173-181
    • Sox, C.R.1    Gao, Y.B.2
  • 43
    • 33746333266 scopus 로고    scopus 로고
    • Modeling of period overlapping setup times
    • Suerie, C.: Modeling of period overlapping setup times. European Journal of Operational Research 174(2), 874-886 (2006)
    • (2006) European Journal of Operational Research , vol.174 , Issue.2 , pp. 874-886
    • Suerie, C.1
  • 44
    • 0141675994 scopus 로고    scopus 로고
    • The capacitated lot-sizing problem with linked lot sizes
    • Suerie, C., Stadtler, H.: The capacitated lot-sizing problem with linked lot sizes. Management Science 49(8), 1039-1054 (2003)
    • (2003) Management Science , vol.49 , Issue.8 , pp. 1039-1054
    • Suerie, C.1    Stadtler, H.2
  • 45
    • 79951815554 scopus 로고    scopus 로고
    • A hybrid general lot-sizing and scheduling formulation for a production process with a two-stage product structure
    • Transchel, S., Minner, S., Kallrath, J., Loehndorf, N., Eberhard, U.: A hybrid general lot-sizing and scheduling formulation for a production process with a two-stage product structure. International Journal of Production Research 49(9), 2463-2480 (2011)
    • (2011) International Journal of Production Research , vol.49 , Issue.9 , pp. 2463-2480
    • Transchel, S.1    Minner, S.2    Kallrath, J.3    Loehndorf, N.4    Eberhard, U.5
  • 46
    • 0031139978 scopus 로고    scopus 로고
    • MIP modelling of changeovers in production planning and scheduling problems
    • Wolsey, L.A.: MIP modelling of changeovers in production planning and scheduling problems. European Journal of Operational Research 99(1), 154-165 (1997)
    • (1997) European Journal of Operational Research , vol.99 , Issue.1 , pp. 154-165
    • Wolsey, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.