-
1
-
-
0023977010
-
The Shifting Bottleneck Procedure for Job Shop ScheduHng
-
Adams, J., Balas, E., and Zawack, D. "The Shifting Bottleneck Procedure for Job Shop ScheduHng." Management Science, 34, 391-401, 1988.
-
(1988)
Management Science
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
0004118346
-
-
Kluwer Academic Publishers, Boston, Dordrecht, London
-
Atherton, L.F., and Atherton, R. W. Wafer Fabrication: Factory Performance and Analysis (Kluwer Academic Publishers, Boston, Dordrecht, London, 1995).
-
(1995)
Wafer Fabrication: Factory Performance and Analysis
-
-
Atherton, L.F.1
Atherton, R.W.2
-
3
-
-
0003990308
-
-
Fourth Edition. Prentice Hall, Upper saddle River
-
Banks, J., Carson, J. S., Nelson, B. L., and Nicol, D. Discrete-Event System Simulation, (Fourth Edition. Prentice Hall, Upper saddle River, (2005).
-
(2005)
Discrete-Event System Simulation
-
-
Banks, J.1
Carson, J.S.2
Nelson, B.L.3
Nicol, D.4
-
4
-
-
0035400523
-
Benchmarks for Scheduling on a Single Machine Against Restrictive and Unrestrictive Common Due Dates.
-
Biskup, D., and Feldmann, M. "Benchmarks for Scheduling on a Single Machine Against Restrictive and Unrestrictive Common Due Dates." Computers & Operations Research, 28,781-801,(2001).
-
(2001)
Computers & Operations Research
, vol.28
, pp. 781-801
-
-
Biskup, D.1
Feldmann, M.2
-
6
-
-
0031542280
-
A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems.
-
Demirkol, E., Mehta, S., and Uzsoy, R. "A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems." Journal of Heuristics, 3(2), 111-137, (1997).
-
(1997)
Journal of Heuristics
, vol.3
, Issue.2
, pp. 111-137
-
-
Demirkol, E.1
Mehta, S.2
Uzsoy, R.3
-
7
-
-
0033333313
-
Using Simulation and Genetic Algorithms to Improve Cluster Tool Performance.
-
P. A. Farrington, H. B. Nemhard, D. T. Sturrock, G. W. Evans (Eds.)
-
Dtimmler, M.A., "Using Simulation and Genetic Algorithms to Improve Cluster Tool Performance." In: Proceedings of the 1999 Winter Simulation Conference, P. A. Farrington, H. B. Nemhard, D. T. Sturrock, G. W. Evans (Eds.), 875-879, (2001).
-
(2001)
Proceedings of the 1999 Winter Simulation Conference
, pp. 875-879
-
-
Dtimmler, M.A.1
-
9
-
-
0003446035
-
-
Technical Report 9506286lA-TR, SEMATECH, Austin, TX
-
Fowler, J.W., and Robinson, J. "Measurement and improvement of manufacturing capacities (MIMAC): Final report." Technical Report 9506286lA-TR, SEMATECH, Austin, TX, (1995).
-
(1995)
"Measurement and Improvement of Manufacturing Capacities (MIMAC): Final Report."
-
-
Fowler, J.W.1
Robinson, J.2
-
10
-
-
11844277628
-
Grand Challenges in Modeling and Simulation of Complex Manufacturing Systems.
-
Fowler, J.W., and Rose, O. "Grand Challenges in Modeling and Simulation of Complex Manufacturing Systems." Simulation-Transactions of the Society for Modeling and Simulation International, 80, 469-476, (2004).
-
(2004)
Simulation-Transactions of the Society for Modeling and Simulation International
, vol.80
, pp. 469-476
-
-
Fowler, J.W.1
Rose, O.2
-
11
-
-
0012260296
-
Optimization for Simulation: Theory vs. Practice.
-
Fu, M.C., "Optimization for Simulation: Theory vs. Practice." INFORMS Journal on Computing, 14, 192-215, (2002).
-
(2002)
INFORMS Journal on Computing
, vol.14
, pp. 192-215
-
-
Fu, M.C.1
-
12
-
-
0034428948
-
Integrating Optimization and Simulation: Research and Practice.
-
J. A. Joines, R. R. Barton, K. Kang, P. A. Fishwick (Eds.)
-
Fu, M.C., Antradottir, S., Carson, J. S., Glover, F., Harrell, C. R., Ho, Y.-C, Kelly, J. P., and Robinson, S. M. "Integrating Optimization and Simulation: Research and Practice." In: Proceedings of the 2000 Winter Simulation Conference, J. A. Joines, R. R. Barton, K. Kang, P. A. Fishwick (Eds.), 610-616, (2001).
-
(2001)
Proceedings of the 2000 Winter Simulation Conference
, pp. 610-616
-
-
Fu, M.C.1
Antradottir, S.2
Carson, J.S.3
Glover, F.4
Harrell, C.R.5
Ho, Y.-C.6
Kelly, J.P.7
Robinson, S.M.8
-
13
-
-
74849101820
-
Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey.
-
Graham, R.L., Lawler, E. L., Lenstra, J. K., and Rinnooy Kann, A. H. G. "Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey." Annals of Discrete Mathematics, 5, 287-326, (1979).
-
(1979)
Annals of Discrete Mathematics
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kann, A.H.G.4
-
14
-
-
0035521426
-
Generating experimental data for computational testing with machine scheduling applications.
-
Hall, N.G., and Posner, M.E., "Generating experimental data for computational testing with machine scheduling applications." Operations Research, 49, 854-865, (2001).
-
(2001)
Operations Research
, vol.49
, pp. 854-865
-
-
Hall, N.G.1
Posner, M.E.2
-
15
-
-
0035917226
-
Finite Capacity Production Planning Algorithms for a Semiconductor Wafer Fabrication Facility.
-
Horiguchi, K., Raghavani, N., Uzsoy, R., and Venkateswaran, V. "Finite Capacity Production Planning Algorithms for a Semiconductor Wafer Fabrication Facility." International Journal of Production Research, 39(5), 825-842, (2001).
-
(2001)
International Journal of Production Research
, vol.39
, Issue.5
, pp. 825-842
-
-
Horiguchi, K.1
Raghavani, N.2
Uzsoy, R.3
Venkateswaran, V.4
-
16
-
-
0029376258
-
A Hybrid Approach to Sequencing Jobs Using Heuristic Rules and Neural Networks.
-
Kim, S.Y., Lee, Y. H., and Agnihotri, D. "A Hybrid Approach to Sequencing Jobs Using Heuristic Rules and Neural Networks." Production Planning and Control, 6(5), 445-454, (1995).
-
(1995)
Production Planning and Control
, vol.6
, Issue.5
, pp. 445-454
-
-
Kim, S.Y.1
Lee, Y.H.2
Agnihotri, D.3
-
18
-
-
0000482108
-
Scheduling jobs on parallel machines with sequence-dependent setup times.
-
Lee, Y.-H., and Pinedo, M. "Scheduling jobs on parallel machines with sequence-dependent setup times." European Journal of Operational Research, 100, 446-474, (1997).
-
(1997)
European Journal of Operational Research
, vol.100
, pp. 446-474
-
-
Lee, Y.-H.1
Pinedo, M.2
-
19
-
-
77951139709
-
Complexity of Machine Scheduling Problems.
-
Lenstra, J.K., Rinnooy K. A. H. G., and Brucker, P. "Complexity of Machine Scheduling Problems." In: Annals of Discrete Mathematics 1, 343-362, (1977).
-
(1977)
Annals of Discrete Mathematics
, vol.1
, pp. 343-362
-
-
Lenstra, J.K.1
Rinnooy, K.A.H.G.2
Brucker, P.3
-
20
-
-
0042622980
-
A Modified Shifting Bottleneck Heuristic for Minimizing the Total Weighted Tardiness in Complex Job Shops.
-
Mason, S., Fowler, J. W., and Carlyle, M. W. "A Modified Shifting Bottleneck Heuristic for Minimizing the Total Weighted Tardiness in Complex Job Shops." Journal of Scheduling, 5, 247-262, (2002).
-
(2002)
Journal of Scheduling
, vol.5
, pp. 247-262
-
-
Mason, S.1
Fowler, J.W.2
Carlyle, M.W.3
-
22
-
-
13844256873
-
Scheduling Heuristics for Jobs with Unequal Ready Times and Incompatible Families on Parallel Batch Processing Machines.
-
Monch, L., Balasubramanian, H., Fowler, J. W., and Pftind, M. "Scheduling Heuristics for Jobs with Unequal Ready Times and Incompatible Families on Parallel Batch Processing Machines." Computers & Operations Research, 32(11), 2731-2750, (2005).
-
(2005)
Computers & Operations Research
, vol.32
, Issue.11
, pp. 2731-2750
-
-
Monch, L.1
Balasubramanian, H.2
Fowler, J.W.3
Pftind, M.4
-
23
-
-
18544406120
-
Simulation Framework for Performance Assessment of Shop-Floor Control Systems.
-
Monch, L., Rose, O., and Sturm, R. "Simulation Framework for Performance Assessment of Shop-Floor Control Systems." Simulation-Transactions of the Society for Modeling and Simulation International, 79(3), 60-67, (2003).
-
(2003)
Simulation-Transactions of the Society for Modeling and Simulation International
, vol.79
, Issue.3
, pp. 60-67
-
-
Monch, L.1
Rose, O.2
Sturm, R.3
-
25
-
-
0003718995
-
-
Kluwer Academic Publishers, Dordrecht, MA
-
Ovacik, I.M., and Uzsoy, R. Decomposition Methods for Complex Factory Scheduling Problems (Kluwer Academic Publishers, Dordrecht, MA, 1997).
-
(1997)
Decomposition Methods for Complex Factory Scheduling Problems
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
27
-
-
0033717569
-
Scheduling jobs on parallel machines applying neural Network and heuristic Rules.
-
Park, Y., Kim, S., and Lee, Y.-H. "Scheduling jobs on parallel machines applying neural Network and heuristic Rules." Computers & Industrial Engineering, 38, 189-202, (2000).
-
(2000)
Computers & Industrial Engineering
, vol.38
, pp. 189-202
-
-
Park, Y.1
Kim, S.2
Lee, Y.-H.3
-
28
-
-
0003438602
-
-
Second Edition. Prentice-Hall, Englewood Cliffs, NJ
-
Pinedo, M.L., Scheduling: Theory, Algorithms, and Systems. (Second Edition. Prentice-Hall, Englewood Cliffs, NJ, 2002).
-
(2002)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.L.1
-
29
-
-
0033079535
-
A Shifting Bottleneck Heuristic for Minimizing the Total Weighted Tardiness in a Job Shop.
-
Pinedo, M.L., and Singer, M. "A Shifting Bottleneck Heuristic for Minimizing the Total Weighted Tardiness in a Job Shop." Naval Research Logistics, 46, 94-109, (1999).
-
(1999)
Naval Research Logistics
, vol.46
, pp. 94-109
-
-
Pinedo, M.L.1
Singer, M.2
-
30
-
-
0036923814
-
-
In: Proceedings of the 2002 Winter Simulation Conference, E. Yucesan, C.-H. Chen, J. L. Snowdon, J. M. Chames (eds.)
-
Potoradi, J., Boon, O. S., Mason, S. J., Fowler, J. W., and Pftind, M. E. "Using Simulation-Based Scheduling to Maximize Demand Fulfillment in a Semiconductor Assembly Facility." In: Proceedings of the 2002 Winter Simulation Conference, E. Yucesan, C.-H. Chen, J. L. Snowdon, J. M. Chames (eds.), 1857-1861, (2002).
-
(2002)
Using Simulation-Based Scheduling to Maximize Demand Fulfillment in a Semiconductor Assembly Facility
, pp. 1857-1861
-
-
Potoradi, J.1
Boon, O.S.2
Mason, S.J.3
Fowler, J.W.4
Pftind, M.E.5
-
32
-
-
0034246784
-
Segment-Based Approach for Real-Time Reactive Rescheduling for Automatic Manufacturing Control.
-
Toba, H., "Segment-Based Approach for Real-Time Reactive Rescheduling for Automatic Manufacturing Control." IEEE Transactions on Semiconductor Manufacturing, 13(3), 264-272, (2000).
-
(2000)
IEEE Transactions on Semiconductor Manufacturing
, vol.13
, Issue.3
, pp. 264-272
-
-
Toba, H.1
|