메뉴 건너뛰기




Volumn 32, Issue 5, 2014, Pages 815-826

Effects of project governance structures on the management of risks in major infrastructure projects: A comparative analysis

Author keywords

Comparative case study; Infrastructure construction projects; Project governance; Risk management

Indexed keywords

RAILROAD TRANSPORTATION; RISK ASSESSMENT; RISK MANAGEMENT; TOLL HIGHWAYS;

EID: 84899897328     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2013.10.001     Document Type: Article
Times cited : (113)

References (70)
  • 2
    • 80054785870 scopus 로고    scopus 로고
    • The importance of project governance framework in project procurement planning
    • 12th East Asia-Pacific Conference on Structural Engineering and Construction, EASEC12; Hong Kong; Hong Kong; 26 January 2011 through 28 January 2011; Code 86909
    • Aliza A.H., Stephen K., Bambang T. The importance of project governance framework in project procurement planning. Procedia Engineering 2011, 14:1929-1937.
    • (2011) Procedia Engineering , vol.14 , pp. 1929-1937
    • Aliza, A.H.1    Stephen, K.2    Bambang, T.3
  • 3
    • 44649083833 scopus 로고    scopus 로고
    • Relational quality and inter-personal trust in strategic alliances
    • Arino A., Torre J.D.L., Ring P.S. Relational quality and inter-personal trust in strategic alliances. Eur. Manag. Rev. 2005, 2(1):15-27.
    • (2005) Eur. Manag. Rev. , vol.2 , Issue.1 , pp. 15-27
    • Arino, A.1    Torre, J.D.L.2    Ring, P.S.3
  • 4
    • 46049090004 scopus 로고    scopus 로고
    • Editorial: stakeholder management in construction
    • Atkin B., Skimore M. Editorial: stakeholder management in construction. Constr. Manag. Econ. 2008, 26(6):549-552.
    • (2008) Constr. Manag. Econ. , vol.26 , Issue.6 , pp. 549-552
    • Atkin, B.1    Skimore, M.2
  • 5
    • 0035313973 scopus 로고    scopus 로고
    • The risk ranking of projects: a methodology
    • Baccarini D., Archer R. The risk ranking of projects: a methodology. Int. J. Proj. Manag. 2001, 19(3):139-145.
    • (2001) Int. J. Proj. Manag. , vol.19 , Issue.3 , pp. 139-145
    • Baccarini, D.1    Archer, R.2
  • 7
    • 70349320486 scopus 로고    scopus 로고
    • Project management in the Chinese construction industry: six-case study
    • Cheng P., Qiang M., Wang J.N. Project management in the Chinese construction industry: six-case study. J. Constr. Eng. Manag. 2009, 135(10):1016-1026.
    • (2009) J. Constr. Eng. Manag. , vol.135 , Issue.10 , pp. 1016-1026
    • Cheng, P.1    Qiang, M.2    Wang, J.N.3
  • 8
    • 64049087064 scopus 로고    scopus 로고
    • Project management approaches for dynamic environments
    • Collyer S., Warren C.M.J. Project management approaches for dynamic environments. Int. J. Proj. Manag. 2009, 27(4):355-364.
    • (2009) Int. J. Proj. Manag. , vol.27 , Issue.4 , pp. 355-364
    • Collyer, S.1    Warren, C.M.J.2
  • 9
    • 84899953942 scopus 로고    scopus 로고
    • Constructing Excellence, Construction Clients' Group, Wellington
    • Constructing Excellence Pathfinder Project 2009, Construction Clients' Group, Wellington, (www.constructing.co.nz).
    • (2009) Pathfinder Project
  • 10
    • 60449114774 scopus 로고    scopus 로고
    • Alliance governance: balancing control and trust in dealing with risk
    • de Man A.-P., Roijakkers N. Alliance governance: balancing control and trust in dealing with risk. Long Range Plan. 2009, 42(1):75-95.
    • (2009) Long Range Plan. , vol.42 , Issue.1 , pp. 75-95
    • De Man, A.-P.1    Roijakkers, N.2
  • 11
    • 13944259748 scopus 로고    scopus 로고
    • Integrated methodology for project risk management
    • Del Cano A., De la Cruz M. Integrated methodology for project risk management. J. Constr. Eng. Manag. 2002, 128(6):473-485.
    • (2002) J. Constr. Eng. Manag. , vol.128 , Issue.6 , pp. 473-485
    • Del Cano, A.1    De la Cruz, M.2
  • 14
    • 77449135720 scopus 로고    scopus 로고
    • Relational partnerships: the importance of communication, trust and confidence and joint risk management in achieving project success
    • Doloi H. Relational partnerships: the importance of communication, trust and confidence and joint risk management in achieving project success. Constr. Manag. Econ. 2009, 27(11):1099-1109.
    • (2009) Constr. Manag. Econ. , vol.27 , Issue.11 , pp. 1099-1109
    • Doloi, H.1
  • 15
    • 85015455728 scopus 로고
    • Building theories from case study research
    • Eisenhart K.M. Building theories from case study research. Acad. Manag. Rev. 1989, 14(4):532-550.
    • (1989) Acad. Manag. Rev. , vol.14 , Issue.4 , pp. 532-550
    • Eisenhart, K.M.1
  • 16
    • 0019113281 scopus 로고
    • The active community: towards a political-territorial framework for rural development in Asia
    • Friedmann J. The active community: towards a political-territorial framework for rural development in Asia. Reg. Dev. Dialogue 1980, 1(2):39-101.
    • (1980) Reg. Dev. Dialogue , vol.1 , Issue.2 , pp. 39-101
    • Friedmann, J.1
  • 19
    • 84878575659 scopus 로고    scopus 로고
    • VP-based safety management in large-scale construction projects: a conceptual framework
    • Guo H.L., Li H., Li V. VP-based safety management in large-scale construction projects: a conceptual framework. Automation in Construction 2013, 34:16-24.
    • (2013) Automation in Construction , vol.34 , pp. 16-24
    • Guo, H.L.1    Li, H.2    Li, V.3
  • 20
    • 27344460895 scopus 로고    scopus 로고
    • Innovation in construction: a sociology of technology approach
    • Harty C. Innovation in construction: a sociology of technology approach. Build. Res. Inf. 2005, 33(6):512-522.
    • (2005) Build. Res. Inf. , vol.33 , Issue.6 , pp. 512-522
    • Harty, C.1
  • 21
    • 57749094681 scopus 로고    scopus 로고
    • Implementing innovation in construction: contexts, relative boundedness and actor-network theory
    • Harty C. Implementing innovation in construction: contexts, relative boundedness and actor-network theory. Constr. Manag. Econ. 2008, 26(10):1029-1041.
    • (2008) Constr. Manag. Econ. , vol.26 , Issue.10 , pp. 1029-1041
    • Harty, C.1
  • 22
    • 33646812933 scopus 로고    scopus 로고
    • Developing effective alliance partnerships: lessons from a case study
    • Hipkin I., Naudé P. Developing effective alliance partnerships: lessons from a case study. Long Range Plan. 2006, 39(1):51-69.
    • (2006) Long Range Plan. , vol.39 , Issue.1 , pp. 51-69
    • Hipkin, I.1    Naudé, P.2
  • 23
    • 0033691188 scopus 로고    scopus 로고
    • Making governance mechanism effective in a coordinated industry: the case of construction in the United Kingdom
    • Howes R. Making governance mechanism effective in a coordinated industry: the case of construction in the United Kingdom. Int. J. Technol. Manag. 2000, 20(1):194-213.
    • (2000) Int. J. Technol. Manag. , vol.20 , Issue.1 , pp. 194-213
    • Howes, R.1
  • 24
    • 77958522158 scopus 로고    scopus 로고
    • ISO, International Organization for Standardization (ISO), Geneva, Switzerland
    • ISO ISO 31000, Risk Management: Principles and Guidelines 2009, International Organization for Standardization (ISO), Geneva, Switzerland.
    • (2009) ISO 31000, Risk Management: Principles and Guidelines
  • 25
    • 84860115999 scopus 로고    scopus 로고
    • Improving project predictability with the application of critical project governance structures
    • 55th Annual Meeting of the Association for the Advancement of Cost Engineering, AACE 2011; Anaheim, CA; United States; 19 June 2011 through 22 June 2011; Code 89393
    • Kean J.R. Improving project predictability with the application of critical project governance structures. AACE International Transactions 2011, 2:1023-1035.
    • (2011) AACE International Transactions , vol.2 , pp. 1023-1035
    • Kean, J.R.1
  • 26
    • 34250471014 scopus 로고
    • Prospects for communication policy
    • Krieger S. Prospects for communication policy. Policy Sci. 1971, 2(3):305-319.
    • (1971) Policy Sci. , vol.2 , Issue.3 , pp. 305-319
    • Krieger, S.1
  • 28
    • 84857023802 scopus 로고    scopus 로고
    • Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery
    • Lahdenperä P. Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Constr. Manag. Econ. 2012, 30(1):57-79.
    • (2012) Constr. Manag. Econ. , vol.30 , Issue.1 , pp. 57-79
    • Lahdenperä, P.1
  • 29
    • 78751513125 scopus 로고    scopus 로고
    • Risk/reward compensation models in alliances for the delivery of civil engineering infrastructure projects
    • Love P.E.D., Davis P.R., Chevis R., Edwards D.J. Risk/reward compensation models in alliances for the delivery of civil engineering infrastructure projects. J. Constr. Eng. Manag. 2011, 137(2):127-136.
    • (2011) J. Constr. Eng. Manag. , vol.137 , Issue.2 , pp. 127-136
    • Love, P.E.D.1    Davis, P.R.2    Chevis, R.3    Edwards, D.J.4
  • 30
    • 84861907784 scopus 로고    scopus 로고
    • Effectiveness of the legal framework for natural areas protection relative to French road projects
    • Mallard F., François D. Effectiveness of the legal framework for natural areas protection relative to French road projects. Land Use Policy 2013, 30(1):582-591.
    • (2013) Land Use Policy , vol.30 , Issue.1 , pp. 582-591
    • Mallard, F.1    François, D.2
  • 31
    • 0142060915 scopus 로고    scopus 로고
    • Partnering and alliancing on road projects in Australia and internationally
    • Manley K. Partnering and alliancing on road projects in Australia and internationally. Road Transp. Res. 2002, 11(2):46-60.
    • (2002) Road Transp. Res. , vol.11 , Issue.2 , pp. 46-60
    • Manley, K.1
  • 32
    • 84865515045 scopus 로고    scopus 로고
    • Road project opportunity costs subject to a regional constraint on greenhouse gas emissions
    • Martin J.C., Point P. Road project opportunity costs subject to a regional constraint on greenhouse gas emissions. J. Environ. Manag. 2012, 115(December):292-303.
    • (2012) J. Environ. Manag. , vol.115 , Issue.DECEMBER , pp. 292-303
    • Martin, J.C.1    Point, P.2
  • 33
    • 84655167893 scopus 로고    scopus 로고
    • The effect of relationship management on project performance in construction
    • Meng X. The effect of relationship management on project performance in construction. Int. J. Proj. Manag. 2012, 30(2):188-198.
    • (2012) Int. J. Proj. Manag. , vol.30 , Issue.2 , pp. 188-198
    • Meng, X.1
  • 34
    • 77954347821 scopus 로고    scopus 로고
    • Gower Publishing Limited, Surrey
    • Müller R. Project Governance 2009, Gower Publishing Limited, Surrey.
    • (2009) Project Governance
    • Müller, R.1
  • 35
    • 84855677114 scopus 로고    scopus 로고
    • A methodology for evaluating construction innovation constraints through project stakeholder competencies and FMEA
    • Murphy M., Heaney G., Perera S. A methodology for evaluating construction innovation constraints through project stakeholder competencies and FMEA. Constr. Innov. 2011, 11(4):416-440.
    • (2011) Constr. Innov. , vol.11 , Issue.4 , pp. 416-440
    • Murphy, M.1    Heaney, G.2    Perera, S.3
  • 36
    • 34248449583 scopus 로고
    • Governance dilemmas in an age of ambiguous authority
    • Nachmias D., Greer A.L. Governance dilemmas in an age of ambiguous authority. Policy Sci. 1982, 14(2):105-116.
    • (1982) Policy Sci. , vol.14 , Issue.2 , pp. 105-116
    • Nachmias, D.1    Greer, A.L.2
  • 37
    • 84899915707 scopus 로고    scopus 로고
    • Auckland, New Zealand Transport Agency (NZTA), New Zealand Transport Agency
    • New Zealand Transport Agency SH1 Northern Gateway Toll Road (NGTR) 2009, Auckland, New Zealand Transport Agency (NZTA).
    • (2009) SH1 Northern Gateway Toll Road (NGTR)
  • 39
    • 18144403769 scopus 로고    scopus 로고
    • Evaluation of stakeholder influence in the implementation of construction projects
    • Olander S., Landin A. Evaluation of stakeholder influence in the implementation of construction projects. Int. J. Proj. Manag. 2005, 23(4):321-328.
    • (2005) Int. J. Proj. Manag. , vol.23 , Issue.4 , pp. 321-328
    • Olander, S.1    Landin, A.2
  • 40
    • 84874297835 scopus 로고    scopus 로고
    • The effects of cooperative procurement procedures on joint risk management in Swedish construction projects
    • Osipova E., Eriksson P.E. The effects of cooperative procurement procedures on joint risk management in Swedish construction projects. Int. J. Proj. Organ. Manag. 2011, 3(3/4):209-226.
    • (2011) Int. J. Proj. Organ. Manag. , vol.3 , Issue.3-4 , pp. 209-226
    • Osipova, E.1    Eriksson, P.E.2
  • 41
    • 84857939813 scopus 로고    scopus 로고
    • How procurement options influence risk management in construction projects
    • Osipova E., Eriksson P.E. How procurement options influence risk management in construction projects. Constr. Manag. Econ. 2011, 29(11):1149-1158.
    • (2011) Constr. Manag. Econ. , vol.29 , Issue.11 , pp. 1149-1158
    • Osipova, E.1    Eriksson, P.E.2
  • 42
    • 84874312798 scopus 로고    scopus 로고
    • Balancing control and flexibility in joint risk management: lessons learned from two construction projects
    • Osipova E., Eriksson P.E. Balancing control and flexibility in joint risk management: lessons learned from two construction projects. Int. J. Proj. Manag. 2013, 31(3):391-399.
    • (2013) Int. J. Proj. Manag. , vol.31 , Issue.3 , pp. 391-399
    • Osipova, E.1    Eriksson, P.E.2
  • 44
    • 77955065221 scopus 로고    scopus 로고
    • PMI, Project Management Institute (PMI), Newtown Square, Philadelphia, USA
    • PMI Practice Standard for Project Risk Management 2009, Project Management Institute (PMI), Newtown Square, Philadelphia, USA.
    • (2009) Practice Standard for Project Risk Management
  • 45
    • 84899944122 scopus 로고    scopus 로고
    • Primavera, Retrieved at, (on 9 September 2009)
    • Primavera Building a New Roadway for New Zealand Retrieved at, (on 9 September 2009). http://www.primavera.com.
    • Building a New Roadway for New Zealand
  • 46
    • 29244438162 scopus 로고    scopus 로고
    • Towards a social network theory of project governance
    • Pryke S.D. Towards a social network theory of project governance. Constr. Manag. Econ. 2005, 23(9):927-939.
    • (2005) Constr. Manag. Econ. , vol.23 , Issue.9 , pp. 927-939
    • Pryke, S.D.1
  • 47
    • 14744288182 scopus 로고    scopus 로고
    • Potential for implementing relational contracting and joint risk management
    • Rahman M., Kumaraswamy M. Potential for implementing relational contracting and joint risk management. J. Manag. Eng. 2004, 20(4):178-189.
    • (2004) J. Manag. Eng. , vol.20 , Issue.4 , pp. 178-189
    • Rahman, M.1    Kumaraswamy, M.2
  • 48
    • 0001951713 scopus 로고
    • Organization and governance in construction
    • Reve T., Levitt R.E. Organization and governance in construction. Int. J. Proj. Manag. 1984, 2(1):17-25.
    • (1984) Int. J. Proj. Manag. , vol.2 , Issue.1 , pp. 17-25
    • Reve, T.1    Levitt, R.E.2
  • 50
    • 84857943802 scopus 로고    scopus 로고
    • Vertical governance of construction projects: an information cost perspective
    • Sha K. Vertical governance of construction projects: an information cost perspective. Constr. Manag. Econ. 2011, 29(11):1137-1147.
    • (2011) Constr. Manag. Econ. , vol.29 , Issue.11 , pp. 1137-1147
    • Sha, K.1
  • 51
    • 84864475136 scopus 로고    scopus 로고
    • Governance of public investment projects in Ethiopia
    • Shiferaw A.T., Klakegg D.J., Haavaldsen T. Governance of public investment projects in Ethiopia. Proj. Manag. J. 2012, 43(4):52-69.
    • (2012) Proj. Manag. J. , vol.43 , Issue.4 , pp. 52-69
    • Shiferaw, A.T.1    Klakegg, D.J.2    Haavaldsen, T.3
  • 52
    • 1342309160 scopus 로고    scopus 로고
    • Building theories of project management: past research, questions for the future
    • Söderlund J. Building theories of project management: past research, questions for the future. Int. J. Proj. Manag. 2004, 22(3):183-191.
    • (2004) Int. J. Proj. Manag. , vol.22 , Issue.3 , pp. 183-191
    • Söderlund, J.1
  • 55
    • 32944458539 scopus 로고    scopus 로고
    • Partnering mechanism in construction: an empirical study on the Chinese construction industry
    • Tang W., Duffield C.F., Young D.M. Partnering mechanism in construction: an empirical study on the Chinese construction industry. J. Constr. Eng. Manag. 2006, 132(3):217-229.
    • (2006) J. Constr. Eng. Manag. , vol.132 , Issue.3 , pp. 217-229
    • Tang, W.1    Duffield, C.F.2    Young, D.M.3
  • 56
    • 33646371957 scopus 로고    scopus 로고
    • Good thinking and poor value: on the socialization of knowledge in construction
    • Tombesi P. Good thinking and poor value: on the socialization of knowledge in construction. Build. Res. Inf. 2006, 34(3):272-286.
    • (2006) Build. Res. Inf. , vol.34 , Issue.3 , pp. 272-286
    • Tombesi, P.1
  • 57
    • 76749158500 scopus 로고    scopus 로고
    • Beyond the 'iron triangle': stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects
    • Toor S.-u.-R., Ogunlana S.O. Beyond the 'iron triangle': stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. Int. J. Proj. Manag. 2010, 28(3):228-236.
    • (2010) Int. J. Proj. Manag. , vol.28 , Issue.3 , pp. 228-236
    • Toor, S.-U.-R.1    Ogunlana, S.O.2
  • 58
    • 84868552726 scopus 로고    scopus 로고
    • Transport infrastructure provision and operations: why should governments choose private-public partnership?
    • Tsamboulas D., Verma A., Moraiti P. Transport infrastructure provision and operations: why should governments choose private-public partnership?. Res. Transp. Econ. 2013, 38(1):122-127.
    • (2013) Res. Transp. Econ. , vol.38 , Issue.1 , pp. 122-127
    • Tsamboulas, D.1    Verma, A.2    Moraiti, P.3
  • 60
    • 2642544705 scopus 로고    scopus 로고
    • Communication and cooperation on projects between the project owner as principal and the project manager as agent
    • Turner J.R., Müller R. Communication and cooperation on projects between the project owner as principal and the project manager as agent. Eur. Manag. J. 2004, 22(3):327-336.
    • (2004) Eur. Manag. J. , vol.22 , Issue.3 , pp. 327-336
    • Turner, J.R.1    Müller, R.2
  • 61
    • 84873885786 scopus 로고    scopus 로고
    • Sustainability in civil construction: application of an environmental certification process (leed) during the construction phase of a hospital enterprise-Rio de Janeiro/Brazil
    • Vazquez E., Rola S., Martins D., Alves L., Freitas M., Rosa L.P. Sustainability in civil construction: application of an environmental certification process (leed) during the construction phase of a hospital enterprise-Rio de Janeiro/Brazil. Int. J. Sustain. Dev. Plan. 2013, 8(1):1-19.
    • (2013) Int. J. Sustain. Dev. Plan. , vol.8 , Issue.1 , pp. 1-19
    • Vazquez, E.1    Rola, S.2    Martins, D.3    Alves, L.4    Freitas, M.5    Rosa, L.P.6
  • 62
    • 46049098782 scopus 로고    scopus 로고
    • Stakeholders and uncertainties management in projects
    • Ward S., Chapman C. Stakeholders and uncertainties management in projects. Constr. Manag. Econ. 2008, 26(6):563-577.
    • (2008) Constr. Manag. Econ. , vol.26 , Issue.6 , pp. 563-577
    • Ward, S.1    Chapman, C.2
  • 64
    • 84993083692 scopus 로고    scopus 로고
    • An analysis of the problems faced by project management companies managing construction projects
    • Wilkinson S. An analysis of the problems faced by project management companies managing construction projects. Eng. Constr. Archit. Manag. 2001, 8(3):160-170.
    • (2001) Eng. Constr. Archit. Manag. , vol.8 , Issue.3 , pp. 160-170
    • Wilkinson, S.1
  • 65
    • 0001470630 scopus 로고
    • Transaction cost economics: the governance of contractual relations
    • Williamson O.E. Transaction cost economics: the governance of contractual relations. J. Law Econ. 1975, 22(October):233-261.
    • (1975) J. Law Econ. , vol.22 , Issue.OCTOBER , pp. 233-261
    • Williamson, O.E.1
  • 67
    • 0035576569 scopus 로고    scopus 로고
    • Governing the project process: a conceptual framework
    • Winch G.M. Governing the project process: a conceptual framework. Constr. Manag. Econ. 2001, 19(8):799-808.
    • (2001) Constr. Manag. Econ. , vol.19 , Issue.8 , pp. 799-808
    • Winch, G.M.1
  • 68
    • 16444375742 scopus 로고    scopus 로고
    • Main contractor experience of partnering relationships on UK construction projects
    • Wood G.D., Ellis R.C.T. Main contractor experience of partnering relationships on UK construction projects. Constr. Manag. Econ. 2005, 23(3):317-325.
    • (2005) Constr. Manag. Econ. , vol.23 , Issue.3 , pp. 317-325
    • Wood, G.D.1    Ellis, R.C.T.2
  • 69
    • 84869446581 scopus 로고    scopus 로고
    • Construction project risk management based on the view of asymmetric information
    • Xiang P., Zhou J., Zhou X., Ye K. Construction project risk management based on the view of asymmetric information. J. Constr. Eng. Manag. 2012, 138(11):1303-1311.
    • (2012) J. Constr. Eng. Manag. , vol.138 , Issue.11 , pp. 1303-1311
    • Xiang, P.1    Zhou, J.2    Zhou, X.3    Ye, K.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.