메뉴 건너뛰기




Volumn 3, Issue 3-4, 2011, Pages 209-226

The effects of cooperative procurement procedures on joint risk management in Swedish construction projects

Author keywords

case study; collaboration; construction industry; joint risk management; JRM; procurement; questionnaire survey; Sweden

Indexed keywords


EID: 84874297835     PISSN: 17402891     EISSN: 17402905     Source Type: Journal    
DOI: 10.1504/IJPOM.2011.042029     Document Type: Article
Times cited : (10)

References (41)
  • 1
    • 36248953306 scopus 로고    scopus 로고
    • Collaborative relationships in construction: the UK contractors’ perception
    • Akintoye, A. and Main, J. (2007) ‘Collaborative relationships in construction: the UK contractors’ perception’, Engineering, Construction and Architectural Management, Vol. 14, No. 6, pp.597-617.
    • (2007) Engineering, Construction and Architectural Management , vol.14 , Issue.6 , pp. 597-617
    • Akintoye, A.1    Main, J.2
  • 3
    • 34047107694 scopus 로고    scopus 로고
    • Partnering in major contracts: paradox and metaphor
    • Alderman, N, and Ivory, C. (2007) Partnering in major contracts: paradox and metaphor’, International Journal of Project Management, Vol. 25, No. 4, pp.386-393.
    • (2007) International Journal of Project Management , vol.25 , Issue.4 , pp. 386-393
    • Alderman, N.1    Ivory, C.2
  • 4
    • 32844459217 scopus 로고    scopus 로고
    • The importance and allocation of risks in Indonesian construction projects
    • Andi (2006) ‘The importance and allocation of risks in Indonesian construction projects’, Construction Management and Economics, Vol. 24, No. 1, pp.69-80.
    • (2006) Construction Management and Economics , vol.24 , Issue.1 , pp. 69-80
    • Andi1
  • 5
    • 0000357545 scopus 로고
    • Establishing nonresponse bias in mail surveys
    • Armstrong, J.S. and Overton, T.S. (1977) ‘Establishing nonresponse bias in mail surveys’, Journal of Marketing, Vol. 14, No. 3, pp.396-402.
    • (1977) Journal of Marketing , vol.14 , Issue.3 , pp. 396-402
    • Armstrong, J.S.1    Overton, T.S.2
  • 6
    • 1342287952 scopus 로고    scopus 로고
    • Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong
    • Bayliss, R., Cheung, S-O., Suen, H.C.H. and Wong, S-P. (2004) ‘Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong’, International Journal of Project Management, Vol. 22, No. 3, pp.253-263.
    • (2004) International Journal of Project Management , vol.22 , Issue.3 , pp. 253-263
    • Bayliss, R.1    Cheung, S.-O.2    Suen, H.C.H.3    Wong, S.-P.4
  • 7
    • 0033714293 scopus 로고    scopus 로고
    • An analysis of success factors and benefits of partnering in construction
    • Black, C., Akintoye, A. and Fitzgerald, E. (2000) ‘An analysis of success factors and benefits of partnering in construction’, International Journal of Project Management, Vol. 18, No. 6, pp.423-434.
    • (2000) International Journal of Project Management , vol.18 , Issue.6 , pp. 423-434
    • Black, C.1    Akintoye, A.2    Fitzgerald, E.3
  • 8
    • 0347516588 scopus 로고    scopus 로고
    • Contracting for major projects: eight business levers for top management
    • Branconi, C. and Loch, C.H. (2004) ‘Contracting for major projects: eight business levers for top management’, International Journal of Project Management, Vol. 22, No. 2, pp.119-130.
    • (2004) International Journal of Project Management , vol.22 , Issue.2 , pp. 119-130
    • Branconi, C.1    Loch, C.H.2
  • 9
    • 68349154628 scopus 로고    scopus 로고
    • Procuring complex performance in construction: London Heathrow Terminal 5 and a private finance initiative hospital
    • Caldwell, N., Roehrich, J. and Davies, A. (2009) ‘Procuring complex performance in construction: London Heathrow Terminal 5 and a private finance initiative hospital’, Journal of Purchasing & Supply Management, in press.
    • (2009) Journal of Purchasing & Supply Management
    • Caldwell, N.1    Roehrich, J.2    Davies, A.3
  • 10
    • 0031232360 scopus 로고    scopus 로고
    • Fit for purpose’ contractual relations: determining a theoretical framework for construction projects
    • Cox, A. and Thompson, I. (1997) ‘Fit for purpose’ contractual relations: determining a theoretical framework for construction projects’, European Journal of Purchasing & Supply Management, Vol. 3, No. 3, pp.127-135.
    • (1997) European Journal of Purchasing & Supply Management , vol.3 , Issue.3 , pp. 127-135
    • Cox, A.1    Thompson, I.2
  • 11
    • 33746210224 scopus 로고    scopus 로고
    • Downside risks in construction projects developed by the civil service: the case of Spain
    • De la Cruz, M., Del Cano, A. and De la Cruz, E. (2006) ‘Downside risks in construction projects developed by the civil service: the case of Spain’, Journal of Construction Engineering and Management, Vol. 132, No. 8, pp.844-852.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.8 , pp. 844-852
    • De la Cruz, M.1    Del Cano, A.2    De la Cruz, E.3
  • 12
    • 0034225748 scopus 로고    scopus 로고
    • Partnering: why project owner - contractor relationships change
    • Drexler, J. and Larson, E. (2000) ‘Partnering: why project owner - contractor relationships change’, Journal of Construction Engineering and Management, Vol. 126, No. 4, pp.293-297.
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.4 , pp. 293-297
    • Drexler, J.1    Larson, E.2
  • 13
    • 38149086112 scopus 로고    scopus 로고
    • Procurement effects on coopetition in client-contractor relationships
    • Eriksson, P.E. (2008) ‘Procurement effects on coopetition in client-contractor relationships’, Journal of Construction Engineering and Management, Vol. 134, No. 2, pp.103-111.
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.2 , pp. 103-111
    • Eriksson, P.E.1
  • 14
    • 34547344418 scopus 로고    scopus 로고
    • Procurement effects on trust and control in client-contractor relationships
    • Eriksson, P.E. and Laan, A. (2007) ‘Procurement effects on trust and control in client-contractor relationships’, Engineering, Construction and Architectural Management, Vol. 14, No. 4, pp.387-399.
    • (2007) Engineering, Construction and Architectural Management , vol.14 , Issue.4 , pp. 387-399
    • Eriksson, P.E.1    Laan, A.2
  • 16
    • 0035501140 scopus 로고    scopus 로고
    • Strategizing for anticipated risks and turbulence in large-scale engineering projects
    • Floricel, S. and Miller, R. (2001) ‘Strategizing for anticipated risks and turbulence in large-scale engineering projects’, International Journal of Project Management, Vol. 19, No. 8, pp.445-455.
    • (2001) International Journal of Project Management , vol.19 , Issue.8 , pp. 445-455
    • Floricel, S.1    Miller, R.2
  • 19
    • 77956458030 scopus 로고    scopus 로고
    • The roles and risks of incentives in construction projects
    • Kadefors, A. and Badenfelt, U. (2009) ‘The roles and risks of incentives in construction projects’, Int. J. Project Organisation and Management, Vol. 1, No. 3, pp.268-284.
    • (2009) Int. J. Project Organisation and Management , vol.1 , Issue.3 , pp. 268-284
    • Kadefors, A.1    Badenfelt, U.2
  • 21
    • 0035633724 scopus 로고    scopus 로고
    • The relationship of team goals, incentives, and efficacy to strategic risk, tactical implementation, and performance
    • Knight, D., Durham, C.C. and Locke, E.A. (2001) ‘The relationship of team goals, incentives, and efficacy to strategic risk, tactical implementation, and performance’, Academy of Management Journal, Vol. 44, No. 2, pp.326-338.
    • (2001) Academy of Management Journal , vol.44 , Issue.2 , pp. 326-338
    • Knight, D.1    Durham, C.C.2    Locke, E.A.3
  • 24
    • 0345098580 scopus 로고    scopus 로고
    • Project risk management in the Queensland engineering construction industry: a survey
    • Lyons, T. and Skitmore, M. (2004) ‘Project risk management in the Queensland engineering construction industry: a survey’, International Journal of Project Management, Vol. 22, No. 1, pp.51-61.
    • (2004) International Journal of Project Management , vol.22 , Issue.1 , pp. 51-61
    • Lyons, T.1    Skitmore, M.2
  • 25
    • 21444459526 scopus 로고    scopus 로고
    • The impact of principal-agent relationship and contract type on communication between project owner and manager
    • Müller, R. and Turner, J.R. (2005) ‘The impact of principal-agent relationship and contract type on communication between project owner and manager’, International Journal of Project Management, Vol. 23, No. 5, pp.398-403.
    • (2005) International Journal of Project Management , vol.23 , Issue.5 , pp. 398-403
    • Müller, R.1    Turner, J.R.2
  • 28
    • 84993077991 scopus 로고    scopus 로고
    • Risk management trends in the construction industry: moving towards joint risk management
    • Rahman, M. and Kumaraswamy, M. (2002) ‘Risk management trends in the construction industry: moving towards joint risk management’, Engineering, Construction and Architectural Management, Vol. 9, No. 2, pp.131-151.
    • (2002) Engineering, Construction and Architectural Management , vol.9 , Issue.2 , pp. 131-151
    • Rahman, M.1    Kumaraswamy, M.2
  • 29
    • 14744288182 scopus 로고    scopus 로고
    • Potential for implementing relational contracting and joint risk management
    • Rahman, M. and Kumaraswamy, M. (2004) ’Potential for implementing relational contracting and joint risk management’, Journal of Management in Engineering, Vol. 20, No. 4, pp.178-189.
    • (2004) Journal of Management in Engineering , vol.20 , Issue.4 , pp. 178-189
    • Rahman, M.1    Kumaraswamy, M.2
  • 30
    • 84971439478 scopus 로고    scopus 로고
    • Assembling integrated project teams for joint risk management
    • Rahman, M. and Kumaraswamy, M. (2005) ‘Assembling integrated project teams for joint risk management’, Construction Management & Economics, Vol. 23, pp.365-375.
    • (2005) Construction Management & Economics , vol.23 , pp. 365-375
    • Rahman, M.1    Kumaraswamy, M.2
  • 31
    • 37249091613 scopus 로고    scopus 로고
    • Relational contracting and teambuilding: assessing potential contractual and noncontractual incentives
    • Rahman, M. and Kumaraswamy, M. (2008) ‘Relational contracting and teambuilding: assessing potential contractual and noncontractual incentives’, Journal of Management in Engineering, Vol. 24, No. 1, pp.48-63.
    • (2008) Journal of Management in Engineering , vol.24 , Issue.1 , pp. 48-63
    • Rahman, M.1    Kumaraswamy, M.2
  • 32
    • 34047201155 scopus 로고    scopus 로고
    • Persuasion with case studies
    • Siggelkow, N. (2007) ‘Persuasion with case studies’, Academy of Management Journal, Vol. 50, No. 1, pp.20-24.
    • (2007) Academy of Management Journal , vol.50 , Issue.1 , pp. 20-24
    • Siggelkow, N.1
  • 33
    • 84861091965 scopus 로고    scopus 로고
    • Unpublished licentiate thesis, Department of Civil, Mining and Environmental Engineering, Luleá University of Technology
    • Simu, K. (2006) ‘Risk management in small construction projects’, Unpublished licentiate thesis, Department of Civil, Mining and Environmental Engineering, Luleá University of Technology.
    • (2006) Risk management in small construction projects
    • Simu, K.1
  • 36
    • 0035500575 scopus 로고    scopus 로고
    • Project contract management and a theory of organization
    • Turner, J.R. and Simister, S.J. (2001) ‘Project contract management and a theory of organization’, International Journal of Project Management, Vol. 19, No. 8, pp.457-464.
    • (2001) International Journal of Project Management , vol.19 , Issue.8 , pp. 457-464
    • Turner, J.R.1    Simister, S.J.2
  • 37
    • 0033150106 scopus 로고    scopus 로고
    • Risk management in the conceptual phase of a project
    • Uher, T.E. and Toakley, A.R. (1999) ‘Risk management in the conceptual phase of a project’, International Journal of Project Management, Vol. 17, No. 3, pp.161-169.
    • (1999) International Journal of Project Management , vol.17 , Issue.3 , pp. 161-169
    • Uher, T.E.1    Toakley, A.R.2
  • 38
    • 14744304262 scopus 로고    scopus 로고
    • Risk allocation and risk handling of highway projects in Taiwan
    • Wang, M-T. and Chou, H-Y. (2003) ‘Risk allocation and risk handling of highway projects in Taiwan’, Journal of Management in Engineering, Vol. 19, No. 2, pp.60-68.
    • (2003) Journal of Management in Engineering , vol.19 , Issue.2 , pp. 60-68
    • Wang, M.-T.1    Chou, H.-Y.2
  • 41
    • 0030196945 scopus 로고    scopus 로고
    • Risk-sharing - good concept, bad name
    • Zack, J.G., Jr. (1996) ‘Risk-sharing - good concept, bad name’, Cost Engineering, Vol. 38, No. 7, pp.26-31.
    • (1996) Cost Engineering , vol.38 , Issue.7 , pp. 26-31
    • Zack, J.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.