-
3
-
-
84857042461
-
Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules
-
Aye L., Ngo T., Crawford R., Gammampila R., Mendis P. Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules. Energy and Buildings 2012, 47:159-168.
-
(2012)
Energy and Buildings
, vol.47
, pp. 159-168
-
-
Aye, L.1
Ngo, T.2
Crawford, R.3
Gammampila, R.4
Mendis, P.5
-
4
-
-
67349276669
-
Designing out waste in high-rise residential buildings: analysis of precasting methods and traditional construction
-
Baldwin A., Poon C.-S., Shen L.-Y., Austin S., Wong I. Designing out waste in high-rise residential buildings: analysis of precasting methods and traditional construction. Renewable Energy 2009, 34:2067-2073.
-
(2009)
Renewable Energy
, vol.34
, pp. 2067-2073
-
-
Baldwin, A.1
Poon, C.-S.2
Shen, L.-Y.3
Austin, S.4
Wong, I.5
-
5
-
-
3242706628
-
Learning to see work flow: an application of lean concepts to precast concrete fabrication
-
Ballard G., Harper N., Zabelle T. Learning to see work flow: an application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management 2003, 10:6-14.
-
(2003)
Engineering, Construction and Architectural Management
, vol.10
, pp. 6-14
-
-
Ballard, G.1
Harper, N.2
Zabelle, T.3
-
7
-
-
77954945233
-
Concrete prefabricated housing via advances in systems technologies: development of a technology roadmap
-
Blismas N., Wakefield R., Hauser B. Concrete prefabricated housing via advances in systems technologies: development of a technology roadmap. Engineering, Construction and Architectural Management 2010, 17:99-110.
-
(2010)
Engineering, Construction and Architectural Management
, vol.17
, pp. 99-110
-
-
Blismas, N.1
Wakefield, R.2
Hauser, B.3
-
9
-
-
33644756473
-
Numerical and experimental analyses of PCM containing sandwich panels for prefabricated walls
-
Carbonari A., De Grassi M., Di Perna C., Principi P. Numerical and experimental analyses of PCM containing sandwich panels for prefabricated walls. Energy and Buildings 2006, 38:472-483.
-
(2006)
Energy and Buildings
, vol.38
, pp. 472-483
-
-
Carbonari, A.1
De Grassi, M.2
Di Perna, C.3
Principi, P.4
-
11
-
-
40849102844
-
Materials handling system simulation in precast viaduct construction: modeling, analysis, and implementation
-
Chan W.-H., Lu M. Materials handling system simulation in precast viaduct construction: modeling, analysis, and implementation. Journal of Construction Engineering and Management 2008, 134:300-310.
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, pp. 300-310
-
-
Chan, W.-H.1
Lu, M.2
-
12
-
-
0001055467
-
The ranking of construction management journals
-
Chau K.W. The ranking of construction management journals. Construction Management & Economics 1997, 15:387-398.
-
(1997)
Construction Management & Economics
, vol.15
, pp. 387-398
-
-
Chau, K.W.1
-
13
-
-
76549129795
-
Sustainable performance criteria for construction method selection in concrete buildings
-
Chen Y., Okudan G.E., Riley D.R. Sustainable performance criteria for construction method selection in concrete buildings. Automation in Construction 2010, 19:235-244.
-
(2010)
Automation in Construction
, vol.19
, pp. 235-244
-
-
Chen, Y.1
Okudan, G.E.2
Riley, D.R.3
-
14
-
-
33744976826
-
Prefabrication and barriers to entry-a case study of public housing and institutional buildings in Hong Kong
-
Chiang Y.-H., Hon-Wan Chan E., Ka-Leung Lok L. Prefabrication and barriers to entry-a case study of public housing and institutional buildings in Hong Kong. Habitat International 2006, 30:482-499.
-
(2006)
Habitat International
, vol.30
, pp. 482-499
-
-
Chiang, Y.-H.1
Hon-Wan Chan, E.2
Ka-Leung Lok, L.3
-
15
-
-
45749117591
-
Relative productivity in the AEC industries in the United States for on-site and off-site activities
-
Eastman C.M., Sacks R. Relative productivity in the AEC industries in the United States for on-site and off-site activities. Journal of Construction Engineering and Management 2008, 134:517-526.
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, pp. 517-526
-
-
Eastman, C.M.1
Sacks, R.2
-
16
-
-
33847679794
-
-
Robert Gordon University, Aberdeen
-
Edge M., Craig A., Laing R., Abbott L., Hargreaves A., Scott J., et al. Overcoming client and market resistance to prefabrication and standardisation in housing 2002, Robert Gordon University, Aberdeen.
-
(2002)
Overcoming client and market resistance to prefabrication and standardisation in housing
-
-
Edge, M.1
Craig, A.2
Laing, R.3
Abbott, L.4
Hargreaves, A.5
Scott, J.6
-
18
-
-
84867077192
-
Sustaining inertia?: construction clients' decision-making and information-processing approach to industrialized building innovations
-
Engström S., Hedgren E. Sustaining inertia?: construction clients' decision-making and information-processing approach to industrialized building innovations. Construction Innovation: Information, Process, Management 2012, 12:393-413.
-
(2012)
Construction Innovation: Information, Process, Management
, vol.12
, pp. 393-413
-
-
Engström, S.1
Hedgren, E.2
-
19
-
-
38149114087
-
Formalization of the flow of component-related information in precast concrete supply chains
-
Ergen E., Akinci B. Formalization of the flow of component-related information in precast concrete supply chains. Journal of Construction Engineering and Management 2008, 134:112-121.
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, pp. 112-121
-
-
Ergen, E.1
Akinci, B.2
-
20
-
-
33846821572
-
Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS
-
Ergen E., Akinci B., Sacks R. Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS. Automation in Construction 2007, 16:354-367.
-
(2007)
Automation in Construction
, vol.16
, pp. 354-367
-
-
Ergen, E.1
Akinci, B.2
Sacks, R.3
-
21
-
-
79960658866
-
Applying activity-based costing approach for construction logistics cost analysis
-
Fang Y., Ng S.T. Applying activity-based costing approach for construction logistics cost analysis. Construction Innovation: Information, Process, Management 2011, 11:259-281.
-
(2011)
Construction Innovation: Information, Process, Management
, vol.11
, pp. 259-281
-
-
Fang, Y.1
Ng, S.T.2
-
22
-
-
34648828639
-
Competitiveness in construction: a critical review of research
-
Flanagan R., Lu W., Shen L., Jewell C. Competitiveness in construction: a critical review of research. Construction Management and Economics 2007, 25:989-1000.
-
(2007)
Construction Management and Economics
, vol.25
, pp. 989-1000
-
-
Flanagan, R.1
Lu, W.2
Shen, L.3
Jewell, C.4
-
23
-
-
0037367528
-
Re-engineering through pre-assembly: client expectations and drivers
-
Gibb A., Isack F. Re-engineering through pre-assembly: client expectations and drivers. Building Research & Information 2003, 31:146-160.
-
(2003)
Building Research & Information
, vol.31
, pp. 146-160
-
-
Gibb, A.1
Isack, F.2
-
25
-
-
84862559793
-
Business design modeling for industrialization in construction: cooperative approach
-
Girmscheid G., Rinas T. Business design modeling for industrialization in construction: cooperative approach. Journal of Architectural Engineering 2012, 18:164-175.
-
(2012)
Journal of Architectural Engineering
, vol.18
, pp. 164-175
-
-
Girmscheid, G.1
Rinas, T.2
-
27
-
-
84873354811
-
Critical analysis of partnering research trend in construction journals
-
Hong Y., Chan D.W., Chan A.P., Yeung J.F. Critical analysis of partnering research trend in construction journals. Journal of Management in Engineering 2011, 28:82-95.
-
(2011)
Journal of Management in Engineering
, vol.28
, pp. 82-95
-
-
Hong, Y.1
Chan, D.W.2
Chan, A.P.3
Yeung, J.F.4
-
28
-
-
0000753522
-
Research productivity in psychology based on publication in the journals of the American Psychological Association
-
Howard G.S., Cole D.A., Maxwell S.E. Research productivity in psychology based on publication in the journals of the American Psychological Association. American Psychologist 1987, 42:975.
-
(1987)
American Psychologist
, vol.42
, pp. 975
-
-
Howard, G.S.1
Cole, D.A.2
Maxwell, S.E.3
-
29
-
-
53349089708
-
Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study
-
Jaillon L., Poon C. Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study. Construction Management and Economics 2008, 26:953-966.
-
(2008)
Construction Management and Economics
, vol.26
, pp. 953-966
-
-
Jaillon, L.1
Poon, C.2
-
30
-
-
58949093608
-
The evolution of prefabricated residential building systems in Hong Kong: a review of the public and the private sector
-
Jaillon L., Poon C.S. The evolution of prefabricated residential building systems in Hong Kong: a review of the public and the private sector. Automation in Construction 2009, 18:239-248.
-
(2009)
Automation in Construction
, vol.18
, pp. 239-248
-
-
Jaillon, L.1
Poon, C.S.2
-
31
-
-
77958617075
-
Design issues of using prefabrication in Hong Kong building construction
-
Jaillon L., Poon C.S. Design issues of using prefabrication in Hong Kong building construction. Construction Management and Economics 2010, 28:1025-1042.
-
(2010)
Construction Management and Economics
, vol.28
, pp. 1025-1042
-
-
Jaillon, L.1
Poon, C.S.2
-
32
-
-
55549143657
-
Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong
-
Jaillon L., Poon C., Chiang Y. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. Waste Management 2009, 29:309-320.
-
(2009)
Waste Management
, vol.29
, pp. 309-320
-
-
Jaillon, L.1
Poon, C.2
Chiang, Y.3
-
33
-
-
84992969499
-
Framework of manufacturer-retailer relationship in the manufactured housing construction
-
Jeong J.G., Hastak M., Syal M. Framework of manufacturer-retailer relationship in the manufactured housing construction. Construction Innovation: Information, Process, Management 2009, 9:22-41.
-
(2009)
Construction Innovation: Information, Process, Management
, vol.9
, pp. 22-41
-
-
Jeong, J.G.1
Hastak, M.2
Syal, M.3
-
34
-
-
63749129585
-
Benchmark tests for BIM data exchanges of precast concrete
-
Jeong Y.-S., Eastman C., Sacks R., Kaner I. Benchmark tests for BIM data exchanges of precast concrete. Automation in Construction 2009, 18:469-484.
-
(2009)
Automation in Construction
, vol.18
, pp. 469-484
-
-
Jeong, Y.-S.1
Eastman, C.2
Sacks, R.3
Kaner, I.4
-
35
-
-
33846798024
-
Impacts of prefabricated temporary housing after disasters: 1999 earthquakes in Turkey
-
Johnson C. Impacts of prefabricated temporary housing after disasters: 1999 earthquakes in Turkey. Habitat International 2007, 31:36-52.
-
(2007)
Habitat International
, vol.31
, pp. 36-52
-
-
Johnson, C.1
-
36
-
-
85009313583
-
Classification of production systems for industrialized building: a production strategy perspective
-
Jonsson H., Rudberg M. Classification of production systems for industrialized building: a production strategy perspective. Construction Management and Economics 2013, 1-17.
-
(2013)
Construction Management and Economics
, pp. 1-17
-
-
Jonsson, H.1
Rudberg, M.2
-
37
-
-
33745095060
-
Diffusion of ISO 9000 certification in the precast concrete industry
-
Kale S., Arditi D. Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics 2006, 24:485-495.
-
(2006)
Construction Management and Economics
, vol.24
, pp. 485-495
-
-
Kale, S.1
Arditi, D.2
-
38
-
-
70349324673
-
Research trend of public-private partnership in construction journals
-
Ke Y., Wang S., Chan A.P., Cheung E. Research trend of public-private partnership in construction journals. Journal of Construction Engineering and Management 2009, 135:1076-1086.
-
(2009)
Journal of Construction Engineering and Management
, vol.135
, pp. 1076-1086
-
-
Ke, Y.1
Wang, S.2
Chan, A.P.3
Cheung, E.4
-
40
-
-
80755153662
-
An approach in architectural design of energy-efficient timber buildings with a focus on the optimal glazing size in the south-oriented façade
-
Leskovar V.Ž., Premrov M. An approach in architectural design of energy-efficient timber buildings with a focus on the optimal glazing size in the south-oriented façade. Energy and Buildings 2011, 43:3410-3418.
-
(2011)
Energy and Buildings
, vol.43
, pp. 3410-3418
-
-
Leskovar, V.Ž.1
Premrov, M.2
-
41
-
-
0036605006
-
GA-based resource-constrained flow-shop scheduling model for mixed precast production
-
Leu S.-S., Hwang S.-T. GA-based resource-constrained flow-shop scheduling model for mixed precast production. Automation in Construction 2002, 11:439-452.
-
(2002)
Automation in Construction
, vol.11
, pp. 439-452
-
-
Leu, S.-S.1
Hwang, S.-T.2
-
42
-
-
79952377493
-
Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong
-
Li H., Guo H., Skitmore M., Huang T., Chan K., Chan G. Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong. Construction Management and Economics 2011, 29:233-245.
-
(2011)
Construction Management and Economics
, vol.29
, pp. 233-245
-
-
Li, H.1
Guo, H.2
Skitmore, M.3
Huang, T.4
Chan, K.5
Chan, G.6
-
43
-
-
67349124855
-
Differentiation of rural development driven by industrialization and urbanization in eastern coastal China
-
Long H., Zou J., Liu Y. Differentiation of rural development driven by industrialization and urbanization in eastern coastal China. Habitat International 2009, 33:454-462.
-
(2009)
Habitat International
, vol.33
, pp. 454-462
-
-
Long, H.1
Zou, J.2
Liu, Y.3
-
44
-
-
57949114791
-
Comparison of environmental impacts of building structures with in situ cast floors and with precast concrete floors
-
Lopez-Mesa B., Pitarch A., Tomas A., Gallego T. Comparison of environmental impacts of building structures with in situ cast floors and with precast concrete floors. Building and Environment 2009, 44:699-712.
-
(2009)
Building and Environment
, vol.44
, pp. 699-712
-
-
Lopez-Mesa, B.1
Pitarch, A.2
Tomas, A.3
Gallego, T.4
-
46
-
-
84883752971
-
Investigating waste reduction potential in the upstream processes of offshore prefabrication construction
-
Lu W., Yuan H. Investigating waste reduction potential in the upstream processes of offshore prefabrication construction. Renewable and Sustainable Energy Reviews 2013, 28:804-811.
-
(2013)
Renewable and Sustainable Energy Reviews
, vol.28
, pp. 804-811
-
-
Lu, W.1
Yuan, H.2
-
47
-
-
0346780751
-
The bollard-the lessons learned from an unusual example of off-site construction
-
Maas G., van Eekelen B. The bollard-the lessons learned from an unusual example of off-site construction. Automation in Construction 2004, 13:37-51.
-
(2004)
Automation in Construction
, vol.13
, pp. 37-51
-
-
Maas, G.1
van Eekelen, B.2
-
49
-
-
33847127363
-
Constructing a complex precast tilt-up-panel structure utilizing an optimization model, 3D CAD, and animation
-
Manrique J.D., Al-Hussein M., Telyas A., Funston G. Constructing a complex precast tilt-up-panel structure utilizing an optimization model, 3D CAD, and animation. Journal of Construction Engineering and Management 2007, 133:199-207.
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, pp. 199-207
-
-
Manrique, J.D.1
Al-Hussein, M.2
Telyas, A.3
Funston, G.4
-
50
-
-
84992974840
-
Innovative managerial control system (IMCS): an application in precast concrete building products industry
-
Marasini R., Dawood N. Innovative managerial control system (IMCS): an application in precast concrete building products industry. Construction Innovation: Information, Process, Management 2006, 6:97-120.
-
(2006)
Construction Innovation: Information, Process, Management
, vol.6
, pp. 97-120
-
-
Marasini, R.1
Dawood, N.2
-
51
-
-
0035399590
-
Stockyard layout planning in precast concrete products industry: a case study and proposed framework
-
Marasini R., Dawood N.N., Hobbs B. Stockyard layout planning in precast concrete products industry: a case study and proposed framework. Construction Management & Economics 2001, 19:365-377.
-
(2001)
Construction Management & Economics
, vol.19
, pp. 365-377
-
-
Marasini, R.1
Dawood, N.N.2
Hobbs, B.3
-
52
-
-
85009305305
-
Astudy of a plan-do-check-act method used in less industrialized activities: two cases from industrialized housebuilding
-
Meiling J.H., Sandberg M., Johnsson H. Astudy of a plan-do-check-act method used in less industrialized activities: two cases from industrialized housebuilding. Construction Management and Economics 2013, 1-17.
-
(2013)
Construction Management and Economics
, pp. 1-17
-
-
Meiling, J.H.1
Sandberg, M.2
Johnsson, H.3
-
53
-
-
84986107433
-
Offsite production in the UK: the way forward? A UK construction industry perspective
-
Nadim W., Goulding J.S. Offsite production in the UK: the way forward? A UK construction industry perspective. Construction Innovation: Information, Process, Management 2010, 10:181-202.
-
(2010)
Construction Innovation: Information, Process, Management
, vol.10
, pp. 181-202
-
-
Nadim, W.1
Goulding, J.S.2
-
55
-
-
54049100446
-
Sustainability in the construction industry: a review of recent developments based on LCA
-
Ortiz O., Castells F., Sonnemann G. Sustainability in the construction industry: a review of recent developments based on LCA. Construction and Building Materials 2009, 23:28-39.
-
(2009)
Construction and Building Materials
, vol.23
, pp. 28-39
-
-
Ortiz, O.1
Castells, F.2
Sonnemann, G.3
-
56
-
-
33847644692
-
-
The Palmer Partnership, Dartford
-
Palmer S., Jones K., Coffey M., Blundell C. Innovation in construction: Maintenance and the Egan agenda 2003, The Palmer Partnership, Dartford.
-
(2003)
Innovation in construction: Maintenance and the Egan agenda
-
-
Palmer, S.1
Jones, K.2
Coffey, M.3
Blundell, C.4
-
57
-
-
40649116485
-
Full-span pre-cast launching method (FPLM) analysis with dynamic simulation-case studies of Taiwan high-speed rail (THSR) project
-
Pan N.-H., Chiu T.-C., Chen K.-Y. Full-span pre-cast launching method (FPLM) analysis with dynamic simulation-case studies of Taiwan high-speed rail (THSR) project. Automation in Construction 2008, 17:592-607.
-
(2008)
Automation in Construction
, vol.17
, pp. 592-607
-
-
Pan, N.-H.1
Chiu, T.-C.2
Chen, K.-Y.3
-
59
-
-
84869465392
-
Establishing and weighting decision criteria for building system selection in housing construction
-
Pan W., Dainty A.R., Gibb A.G. Establishing and weighting decision criteria for building system selection in housing construction. Journal of Construction Engineering and Management 2012, 138:1239-1250.
-
(2012)
Journal of Construction Engineering and Management
, vol.138
, pp. 1239-1250
-
-
Pan, W.1
Dainty, A.R.2
Gibb, A.G.3
-
60
-
-
33847613820
-
Perspectives of UK housebuilders on the use of offsite modern methods of construction
-
Pan W., Gibb A.G., Dainty A.R. Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics 2007, 25:183-194.
-
(2007)
Construction Management and Economics
, vol.25
, pp. 183-194
-
-
Pan, W.1
Gibb, A.G.2
Dainty, A.R.3
-
61
-
-
37049009489
-
Leading UK housebuilders' utilization of offsite construction methods
-
Pan W., Gibb A.G., Dainty A.R. Leading UK housebuilders' utilization of offsite construction methods. Building Research & Information 2008, 36:56-67.
-
(2008)
Building Research & Information
, vol.36
, pp. 56-67
-
-
Pan, W.1
Gibb, A.G.2
Dainty, A.R.3
-
62
-
-
84869443070
-
Strategies for integrating the use of off-site production technologies in house building
-
Pan W., Gibb A.G., Dainty A.R. Strategies for integrating the use of off-site production technologies in house building. Journal of Construction Engineering and Management 2012, 138:1331-1340.
-
(2012)
Journal of Construction Engineering and Management
, vol.138
, pp. 1331-1340
-
-
Pan, W.1
Gibb, A.G.2
Dainty, A.R.3
-
63
-
-
57749112930
-
Maintenance cost implications of utilizing bathroom modules manufactured offsite
-
Pan W., Gibb A.G., Sellars A.B. Maintenance cost implications of utilizing bathroom modules manufactured offsite. Construction Management and Economics 2008, 26:1067-1077.
-
(2008)
Construction Management and Economics
, vol.26
, pp. 1067-1077
-
-
Pan, W.1
Gibb, A.G.2
Sellars, A.B.3
-
64
-
-
84857956160
-
Demystifying the cost barriers to offsite construction in the UK
-
Pan W., Sidwell R. Demystifying the cost barriers to offsite construction in the UK. Construction Management and Economics 2011, 29:1081-1099.
-
(2011)
Construction Management and Economics
, vol.29
, pp. 1081-1099
-
-
Pan, W.1
Sidwell, R.2
-
65
-
-
39349106659
-
Factors affecting the use of precast concrete systems in the United States
-
Polat G. Factors affecting the use of precast concrete systems in the United States. Journal of Construction Engineering and Management 2008, 134:169-178.
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, pp. 169-178
-
-
Polat, G.1
-
66
-
-
79959226284
-
Environmental impacts of prefabricated school buildings in Catalonia
-
Pons O., Wadel G. Environmental impacts of prefabricated school buildings in Catalonia. Habitat International 2011, 35:553-563.
-
(2011)
Habitat International
, vol.35
, pp. 553-563
-
-
Pons, O.1
Wadel, G.2
-
67
-
-
3242723881
-
Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong
-
Poon C.S., Ann T., Ng L. Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong. Engineering, Construction and Architectural Management 2003, 10:88-98.
-
(2003)
Engineering, Construction and Architectural Management
, vol.10
, pp. 88-98
-
-
Poon, C.S.1
Ann, T.2
Ng, L.3
-
68
-
-
14544285498
-
Industrialised building systems: reproduction before automation and robotics
-
Richard R.-B. Industrialised building systems: reproduction before automation and robotics. Automation in Construction 2005, 14:442-451.
-
(2005)
Automation in Construction
, vol.14
, pp. 442-451
-
-
Richard, R.-B.1
-
69
-
-
13944284538
-
Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry
-
Sacks R., Eastman C., Lee G. Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry. Journal of Construction Engineering and Management 2004, 130:206-215.
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, pp. 206-215
-
-
Sacks, R.1
Eastman, C.2
Lee, G.3
-
70
-
-
1642618587
-
Parametric 3D modeling in building construction with examples from precast concrete
-
Sacks R., Eastman C.M., Lee G. Parametric 3D modeling in building construction with examples from precast concrete. Automation in Construction 2004, 13:291-312.
-
(2004)
Automation in Construction
, vol.13
, pp. 291-312
-
-
Sacks, R.1
Eastman, C.M.2
Lee, G.3
-
71
-
-
77950862404
-
The Rosewood experiment-building information modeling and interoperability for architectural precast facades
-
Sacks R., Kaner I., Eastman C.M., Jeong Y.-S. The Rosewood experiment-building information modeling and interoperability for architectural precast facades. Automation in Construction 2010, 19:419-432.
-
(2010)
Automation in Construction
, vol.19
, pp. 419-432
-
-
Sacks, R.1
Kaner, I.2
Eastman, C.M.3
Jeong, Y.-S.4
-
72
-
-
35348858907
-
Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system
-
Shamsai M., Whitlatch E., Sezen H. Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management 2007, 133:864-870.
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, pp. 864-870
-
-
Shamsai, M.1
Whitlatch, E.2
Sezen, H.3
-
73
-
-
20444489509
-
Considering prework on industrial projects
-
Song J., Fagerlund W.R., Haas C.T., Tatum C.B., Vanegas J.A. Considering prework on industrial projects. Journal of Construction Engineering and Management 2005, 131:723-733.
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, pp. 723-733
-
-
Song, J.1
Fagerlund, W.R.2
Haas, C.T.3
Tatum, C.B.4
Vanegas, J.A.5
-
76
-
-
84862846364
-
An examination on the practice of adopting prefabrication for construction projects
-
Tam V.W., Tam C., Ng W. An examination on the practice of adopting prefabrication for construction projects. International Journal of Construction Management 2007, 7:53-64.
-
(2007)
International Journal of Construction Management
, vol.7
, pp. 53-64
-
-
Tam, V.W.1
Tam, C.2
Ng, W.3
-
77
-
-
34249942080
-
Towards adoption of prefabrication in construction
-
Tam V.W., Tam C., Zeng S., Ng W.C. Towards adoption of prefabrication in construction. Building and Environment 2007, 42:3642-3654.
-
(2007)
Building and Environment
, vol.42
, pp. 3642-3654
-
-
Tam, V.W.1
Tam, C.2
Zeng, S.3
Ng, W.C.4
-
78
-
-
40849103501
-
Cutting construction wastes by prefabrication
-
Tam W., Tam C., Chan W., Ng C. Cutting construction wastes by prefabrication. International Journal of Construction Management 2006, 6:15-25.
-
(2006)
International Journal of Construction Management
, vol.6
, pp. 15-25
-
-
Tam, W.1
Tam, C.2
Chan, W.3
Ng, C.4
-
79
-
-
77955517081
-
Areview of studies on public-private partnership projects in the construction industry
-
Tang L., Shen Q., Cheng E.W. Areview of studies on public-private partnership projects in the construction industry. International Journal of Project Management 2010, 28:683-694.
-
(2010)
International Journal of Project Management
, vol.28
, pp. 683-694
-
-
Tang, L.1
Shen, Q.2
Cheng, E.W.3
-
80
-
-
12344305334
-
Research and trends in science education from 1998 to 2002: a content analysis of publication in selected journals
-
Tsai C.C., Lydia Wen M. Research and trends in science education from 1998 to 2002: a content analysis of publication in selected journals. International Journal of Science Education 2005, 27:3-14.
-
(2005)
International Journal of Science Education
, vol.27
, pp. 3-14
-
-
Tsai, C.C.1
Lydia Wen, M.2
-
81
-
-
0028508393
-
Site management and production factors in concrete hall assembly
-
Vukovic S., Trivunic M. Site management and production factors in concrete hall assembly. Building Research & Information 1994, 22:272-276. 10.1080/09613219408727401.
-
(1994)
Building Research & Information
, vol.22
, pp. 272-276
-
-
Vukovic, S.1
Trivunic, M.2
-
82
-
-
84862120176
-
Causes and penalties of variation: case study of a precast concrete slab production facility
-
Wang C., Liu M., Hsiang S.M., Leming M.L. Causes and penalties of variation: case study of a precast concrete slab production facility. Journal of Construction Engineering and Management 2011, 138:775-785.
-
(2011)
Journal of Construction Engineering and Management
, vol.138
, pp. 775-785
-
-
Wang, C.1
Liu, M.2
Hsiang, S.M.3
Leming, M.L.4
-
84
-
-
84878892563
-
Energy-efficient algorithms of the steam curing for the in-situ production of precast concrete members
-
Won I., Na Y., Kim J.T., Kim S. Energy-efficient algorithms of the steam curing for the in-situ production of precast concrete members. Energy and Buildings 2013.
-
(2013)
Energy and Buildings
-
-
Won, I.1
Na, Y.2
Kim, J.T.3
Kim, S.4
-
85
-
-
77956832363
-
Critical review of collaborative working in construction projects: business environment and human behaviors
-
Xue X., Shen Q., Ren Z. Critical review of collaborative working in construction projects: business environment and human behaviors. Journal of Management in Engineering 2010, 26:196-208.
-
(2010)
Journal of Management in Engineering
, vol.26
, pp. 196-208
-
-
Xue, X.1
Shen, Q.2
Ren, Z.3
-
86
-
-
85017102184
-
An overview of previous studies in stakeholder management and its implications for the construction industry
-
Yang J., Shen Q., Ho M. An overview of previous studies in stakeholder management and its implications for the construction industry. Journal of Facilities Management 2009, 7:159-175.
-
(2009)
Journal of Facilities Management
, vol.7
, pp. 159-175
-
-
Yang, J.1
Shen, Q.2
Ho, M.3
-
87
-
-
67349159070
-
Developing a precast production management system using RFID technology
-
Yin S.Y., Tserng H.P., Wang J., Tsai S. Developing a precast production management system using RFID technology. Automation in Construction 2009, 18:677-691.
-
(2009)
Automation in Construction
, vol.18
, pp. 677-691
-
-
Yin, S.Y.1
Tserng, H.P.2
Wang, J.3
Tsai, S.4
-
88
-
-
79951551147
-
Trend of the research on construction and demolition waste management
-
Yuan H., Shen L. Trend of the research on construction and demolition waste management. Waste Management 2011, 31:670-679.
-
(2011)
Waste Management
, vol.31
, pp. 670-679
-
-
Yuan, H.1
Shen, L.2
|