메뉴 건너뛰기




Volumn 14, Issue 4, 2005, Pages 442-451

Industrialised building systems: Reproduction before automation and robotics

Author keywords

Analogical model; Building Systems; Industrialization; Load bearing service core; Performance criteria; Process product interaction; Reproduction; Served and serving spaces

Indexed keywords

AUTOMATION; CONCRETE SLABS; CONSTRUCTION INDUSTRY; COSTS; INVESTMENTS; MARKETING; PERFORMANCE; PRESTRESSED CONCRETE; PRODUCTION ENGINEERING; ROBOTICS;

EID: 14544285498     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2004.09.009     Document Type: Conference Paper
Times cited : (97)

References (8)
  • 3
    • 14544294616 scopus 로고    scopus 로고
    • Towards total automation of on-site construction-an integrated approach based on contour crafting
    • B. Khoshnevis Towards total automation of on-site construction-an integrated approach based on contour crafting Proceedings of ISARC 2003, Eindhoven 2003 61 66
    • (2003) Proceedings of ISARC 2003, Eindhoven , pp. 61-66
    • Khoshnevis, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.