메뉴 건너뛰기




Volumn 17, Issue 5, 2008, Pages 592-607

Full-span Pre-cast Launching Method (FPLM) analysis with Dynamic Simulation - Case studies of Taiwan High-Speed Rail (THSR) Project

Author keywords

Construction technology; Dynamic Simulation (DS); Full span Pre cast Launching Method (FPLM)

Indexed keywords

BRIDGES; COMPUTATIONAL METHODS; COMPUTER SIMULATION; COMPUTER SOFTWARE; CONSTRUCTION INDUSTRY; DYNAMIC MODELS; SENSITIVITY ANALYSIS;

EID: 40649116485     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2007.10.009     Document Type: Article
Times cited : (16)

References (12)
  • 1
    • 4344700333 scopus 로고    scopus 로고
    • Planning gang mould operations for building construction using simulations
    • Huang R.-y., Chen J.-J., and Sun K.-S. Planning gang mould operations for building construction using simulations. Automation in Construction 13 6 (2004) 765-779
    • (2004) Automation in Construction , vol.13 , Issue.6 , pp. 765-779
    • Huang, R.-y.1    Chen, J.-J.2    Sun, K.-S.3
  • 5
    • 40649110357 scopus 로고    scopus 로고
    • Insights of FPLM for long-viaduct construction in Taiwan high-speed railway project: overcoming the interfaces
    • Chiu S.L. Insights of FPLM for long-viaduct construction in Taiwan high-speed railway project: overcoming the interfaces. Automation and Robotics in Construction XVII, Taiwan (2000) 323-328
    • (2000) Automation and Robotics in Construction XVII, Taiwan , pp. 323-328
    • Chiu, S.L.1
  • 6
    • 40649085666 scopus 로고    scopus 로고
    • Application of the full-span precast and launching method in KHSR
    • Taiwan Construction Research Institute, Taipei, Taiwan
    • Chiu S.L. Application of the full-span precast and launching method in KHSR. Proceeding of the Conference on Bridge automation (1999), Taiwan Construction Research Institute, Taipei, Taiwan 61-111
    • (1999) Proceeding of the Conference on Bridge automation , pp. 61-111
    • Chiu, S.L.1
  • 8
    • 40649099182 scopus 로고    scopus 로고
    • CACI Produced Company, New York, USA
    • CACI Produced Company. SIMPROCESS Getting Started (2004), New York, USA 16-19
    • (2004) SIMPROCESS Getting Started , pp. 16-19
  • 9
    • 15944379640 scopus 로고    scopus 로고
    • Computer simulation model: construction analysis for pavement rehabilitation strategies
    • April
    • Lee E.-B., and Ibbs C.W. Computer simulation model: construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering & Management ASCE 131 (2005) 449-458 April
    • (2005) Journal of Construction Engineering & Management ASCE , vol.131 , pp. 449-458
    • Lee, E.-B.1    Ibbs, C.W.2
  • 11
    • 33750119008 scopus 로고    scopus 로고
    • Application framework for mapping and simulation of waste handling processes in construction
    • Nov.
    • Lu M., M.ASCE, Poon C.-S., and Wong L.-C. Application framework for mapping and simulation of waste handling processes in construction. Journal of Construction Engineering & Management 132 No 11 (2006) 1212-1221 Nov.
    • (2006) Journal of Construction Engineering & Management , vol.132 , Issue.No 11 , pp. 1212-1221
    • Lu, M.1    M.ASCE2    Poon, C.-S.3    Wong, L.-C.4
  • 12
    • 33846021274 scopus 로고    scopus 로고
    • Automated simulator development: a strategy for modeling modular housing production
    • Nasereddin M., Mullens M.A., and Cope D. Automated simulator development: a strategy for modeling modular housing production. Automation in Construction 16 (2007) 212-223
    • (2007) Automation in Construction , vol.16 , pp. 212-223
    • Nasereddin, M.1    Mullens, M.A.2    Cope, D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.