메뉴 건너뛰기




Volumn 39, Issue 5, 2014, Pages 4315-4323

Knowledge-Based Genetic Algorithm for Dynamic Machine-Tool Selection and Operation Allocation

Author keywords

Flexible manufacturing system; Knowledge management; Knowledge based genetic algorithm; Machine tool combination

Indexed keywords


EID: 84899629627     PISSN: 2193567X     EISSN: 21914281     Source Type: Journal    
DOI: 10.1007/s13369-014-0980-3     Document Type: Article
Times cited : (5)

References (76)
  • 1
    • 0011792093 scopus 로고
    • An iterative approach to system setup problems in flexible manufacturing systems
    • Kim Y. D., Yano C. A.: An iterative approach to system setup problems in flexible manufacturing systems. Int. J. Flex. Manuf. Syst. 4, 183-209 (1992).
    • (1992) Int. J. Flex. Manuf. Syst. , vol.4 , pp. 183-209
    • Kim, Y.D.1    Yano, C.A.2
  • 2
    • 79958839768 scopus 로고    scopus 로고
    • Dynamic dispatching for a flexible manufacturing system based on fuzzy logic
    • Lu M. S., Liu Y. J.: Dynamic dispatching for a flexible manufacturing system based on fuzzy logic. Int. J. Adv. Manuf. Technol. 54, 1057-1065 (2011).
    • (2011) Int. J. Adv. Manuf. Technol. , vol.54 , pp. 1057-1065
    • Lu, M.S.1    Liu, Y.J.2
  • 3
    • 34250111322 scopus 로고
    • Design, planning, scheduling and control problems of flexible manufacturing systems
    • Stecke K. E.: Design, planning, scheduling and control problems of flexible manufacturing systems. Ann. Oper. Res. 3, 3-12 (1985).
    • (1985) Ann. Oper. Res. , vol.3 , pp. 3-12
    • Stecke, K.E.1
  • 4
    • 79959630163 scopus 로고    scopus 로고
    • Modelling of FMS control policy: AIS-based fuzzy expert system
    • Prakash A., Deshmukh S. G.: Modelling of FMS control policy: AIS-based fuzzy expert system. Int. J. Ind. Syst. Eng. 8(1), 38-60 (2011).
    • (2011) Int. J. Ind. Syst. Eng. , vol.8 , Issue.1 , pp. 38-60
    • Prakash, A.1    Deshmukh, S.G.2
  • 5
    • 84855983474 scopus 로고    scopus 로고
    • Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints
    • Kim H. W., Yu J. M., Kim J. S., Doh H. H., Lee D. H., Nam S. H.: Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints. Int. J. Adv. Manuf. Technol. 58, 683-691 (2012).
    • (2012) Int. J. Adv. Manuf. Technol. , vol.58 , pp. 683-691
    • Kim, H.W.1    Yu, J.M.2    Kim, J.S.3    Doh, H.H.4    Lee, D.H.5    Nam, S.H.6
  • 6
    • 0027541129 scopus 로고
    • A new classification scheme for flexible manufacturing systems
    • MacCarthy B. L., Liu J.: A new classification scheme for flexible manufacturing systems. Int. J. Prod. Res. 31(2), 299-309 (1993).
    • (1993) Int. J. Prod. Res. , vol.31 , Issue.2 , pp. 299-309
    • MacCarthy, B.L.1    Liu, J.2
  • 7
    • 84866930822 scopus 로고    scopus 로고
    • An integrated modeling approach for shop-floor scheduling and control problem of flexible manufacturing systems
    • Tuncel G.: An integrated modeling approach for shop-floor scheduling and control problem of flexible manufacturing systems. Int. J. Adv. Manuf. Technol. 59, 1127-1142 (2012).
    • (2012) Int. J. Adv. Manuf. Technol. , vol.59 , pp. 1127-1142
    • Tuncel, G.1
  • 8
    • 84876449087 scopus 로고    scopus 로고
    • Earliness and tardiness minimizing on a realistic hybrid flowshop scheduling with learning effect by advanced metaheuristic
    • doi: 10. 1007/s13369-012-0347-6
    • Behnamian, J.; Zandieh, M.: Earliness and tardiness minimizing on a realistic hybrid flowshop scheduling with learning effect by advanced metaheuristic. Arab. J. Sci. Eng. doi: 10. 1007/s13369-012-0347-6.
    • Arab. J. Sci. Eng
    • Behnamian, J.1    Zandieh, M.2
  • 9
    • 84887298155 scopus 로고    scopus 로고
    • Development of both the AIS and PSO for solving the flexible job shop scheduling problem
    • Sadrzadeh A.: Development of both the AIS and PSO for solving the flexible job shop scheduling problem. Arab. J. Sci. Eng. 38(12), 3593-3604 (2013).
    • (2013) Arab. J. Sci. Eng. , vol.38 , Issue.12 , pp. 3593-3604
    • Sadrzadeh, A.1
  • 10
    • 2642567726 scopus 로고    scopus 로고
    • Tool allocation in flexible manufacturing systems with tool alternatives
    • Buyurgan, N.; Saygin, C.; Kilic, S. E.: Tool allocation in flexible manufacturing systems with tool alternatives. Robot. Comput. Integr. Manuf. 20, 341-379 (2004).
    • (2004) Robot. Comput. Integr. Manuf , vol.20 , pp. 341-379
    • Buyurgan, N.1    Saygin, C.2    Kilic, S.E.3
  • 11
    • 84858336261 scopus 로고    scopus 로고
    • A novel 0-1 linear integer programming model for dynamic machine-tool selection and operation allocation in a flexible manufacturing system
    • Jahromi, M. H. M. A.; Tavakkoli-Moghaddam, R.: A novel 0-1 linear integer programming model for dynamic machine-tool selection and operation allocation in a flexible manufacturing system. J. Manuf. Syst. 31(2), 224-231 (2012).
    • (2012) J. Manuf. Syst , vol.31 , Issue.2 , pp. 224-231
    • Jahromi, M.H.M.A.1    Tavakkoli-Moghaddam, R.2
  • 12
    • 84865793297 scopus 로고    scopus 로고
    • A novel GA-FCM strategy for motion learning and prediction: application in wireless tracking of intelligent subjects
    • Tang S. H., Motlagh O., Ramli A. R., Ismail N., Nakhaei Nia D.: A novel GA-FCM strategy for motion learning and prediction: application in wireless tracking of intelligent subjects. Arab. J. Sci. Eng. 37(7), 1929-1958 (2012).
    • (2012) Arab. J. Sci. Eng. , vol.37 , Issue.7 , pp. 1929-1958
    • Tang, S.H.1    Motlagh, O.2    Ramli, A.R.3    Ismail, N.4    Nakhaei Nia, D.5
  • 13
    • 34548237317 scopus 로고    scopus 로고
    • A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness
    • Tavakkoli-Moghaddam R., Rahimi-Vahed A., Mirzaei A. H.: A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness. Inform. Sci. 177, 5072-5090 (2007).
    • (2007) Inform. Sci. , vol.177 , pp. 5072-5090
    • Tavakkoli-Moghaddam, R.1    Rahimi-Vahed, A.2    Mirzaei, A.H.3
  • 14
    • 84858700224 scopus 로고    scopus 로고
    • A genetic algorithm with the heuristic procedure to solve the multi-line layout problem
    • Sadrzadeh, A.: A genetic algorithm with the heuristic procedure to solve the multi-line layout problem. Comput. Ind. Eng. 62(4), 1055-1064 (2012).
    • (2012) Comput. Ind. Eng , vol.62 , Issue.4 , pp. 1055-1064
    • Sadrzadeh, A.1
  • 15
    • 84859198850 scopus 로고    scopus 로고
    • Genetic algorithm-based fuzzy controller for improving the dynamic performance of self-excited induction generator
    • Attia, A. F.; Al-Turki, Y. A.; Soliman, H. F.: Genetic algorithm-based fuzzy controller for improving the dynamic performance of self-excited induction generator. Arab. J. Sci. Eng. 37(3), 665-682 (2012).
    • (2012) Arab. J. Sci. Eng , vol.37 , Issue.3 , pp. 665-682
    • Attia, A.F.1    Al-Turki, Y.A.2    Soliman, H.F.3
  • 16
    • 80052197923 scopus 로고    scopus 로고
    • Application of a modified NSGA method for multi-objective static distributed generation planning
    • Soroudi, A.; Ehsan, M.: Application of a modified NSGA method for multi-objective static distributed generation planning. Arab. J. Sci. Eng. 36(5), 809-825 (2011).
    • (2011) Arab. J. Sci. Eng , vol.36 , Issue.5 , pp. 809-825
    • Soroudi, A.1    Ehsan, M.2
  • 17
    • 71749103834 scopus 로고    scopus 로고
    • A genetic algorithm based heuristic for scheduling of virtual manufacturing cells (VMCs)
    • Kesen S. E., Das S. K., Güngör Z.: A genetic algorithm based heuristic for scheduling of virtual manufacturing cells (VMCs). Comput. Oper. Res. 37, 1148-1156 (2010).
    • (2010) Comput. Oper. Res. , vol.37 , pp. 1148-1156
    • Kesen, S.E.1    Das, S.K.2    Güngör, Z.3
  • 18
    • 84861487810 scopus 로고    scopus 로고
    • Estimating Penman-Monteith reference evapotranspiration using artificial neural networks and genetic algorithm: A case study
    • Eslamian, S. S.; Gohari, S. A.; Zareian, M. J.; Firoozfar, A.: Estimating Penman-Monteith reference evapotranspiration using artificial neural networks and genetic algorithm: a case study. Arab. J. Sci. Eng. 37(4), 935-944 (2012).
    • (2012) Arab. J. Sci. Eng , vol.37 , Issue.4 , pp. 935-944
    • Eslamian, S.S.1    Gohari, S.A.2    Zareian, M.J.3    Firoozfar, A.4
  • 20
    • 60849089888 scopus 로고    scopus 로고
    • Economic statistical design of non-uniform sampling scheme X bar control charts under non-normality and Gamma shock using genetic algorithm
    • Chen, F. L.; Yeh, C. H.: Economic statistical design of non-uniform sampling scheme X bar control charts under non-normality and Gamma shock using genetic algorithm. Expert Syst. Appl. 36, 9488-9497 (2009).
    • (2009) Expert Syst. Appl , vol.36 , pp. 9488-9497
    • Chen, F.L.1    Yeh, C.H.2
  • 21
    • 84874094362 scopus 로고    scopus 로고
    • Power system stability enhancement via bacteria foraging optimization algorithm
    • doi: 10. 1007/s13369-012-0423-y
    • Abd-Elazim, S. M.; Ali, E. S.: Power system stability enhancement via bacteria foraging optimization algorithm. Arab. J. Sci. Eng. doi: 10. 1007/s13369-012-0423-y.
    • Arab. J. Sci. Eng
    • Abd-Elazim, S.M.1    Ali, E.S.2
  • 24
    • 78650699442 scopus 로고    scopus 로고
    • FMS scheduling with knowledge based genetic algorithm approach
    • Prakash A., Chan F. T. S., Deshmukh S. G.: FMS scheduling with knowledge based genetic algorithm approach. Expert Syst. Appl. 38, 3161-3171 (2011).
    • (2011) Expert Syst. Appl. , vol.38 , pp. 3161-3171
    • Prakash, A.1    Chan, F.T.S.2    Deshmukh, S.G.3
  • 25
    • 35548953433 scopus 로고    scopus 로고
    • Supply chain flexibility and knowledge management: A decision knowledge sharing focus
    • Wadhwa S., Saxena A.: Supply chain flexibility and knowledge management: A decision knowledge sharing focus. Stud. Inf. Control 15(1), 31-50 (2006).
    • (2006) Stud. Inf. Control , vol.15 , Issue.1 , pp. 31-50
    • Wadhwa, S.1    Saxena, A.2
  • 26
    • 82255193981 scopus 로고    scopus 로고
    • Network Optimization in Supply Chain: A KBGA Approach
    • Prakash, A.; Chan, F. T. S.; Liao, H.; Deshmukh, S. G.: Network Optimization in Supply Chain: A KBGA Approach. Decision Support Syst. 52(2), 528-538 (2012).
    • (2012) Decision Support Syst , vol.52 , Issue.2 , pp. 528-538
    • Prakash, A.1    Chan, F.T.S.2    Liao, H.3    Deshmukh, S.G.4
  • 27
    • 84867050422 scopus 로고    scopus 로고
    • Application of knowledge based artificial immune system (KBAIS) for computer aided process planning in CIM Context
    • Prakash, A.; Chan, F. T. S.; Deshmukh, S. G.: Application of knowledge based artificial immune system (KBAIS) for computer aided process planning in CIM Context. Int. J. Prod. Res. 50(18), 4937-4954 (2012).
    • (2012) Int. J. Prod. Res , vol.50 , Issue.18 , pp. 4937-4954
    • Prakash, A.1    Chan, F.T.S.2    Deshmukh, S.G.3
  • 28
    • 33644751275 scopus 로고    scopus 로고
    • Ant colony optimization approach to a goal programming model for a machine tool selection and operation allocation problem in an FMS
    • Chan F. T. S., Swarnkar R.: Ant colony optimization approach to a goal programming model for a machine tool selection and operation allocation problem in an FMS. Robot. Comput. Integr. Manuf. 22, 353-362 (2006).
    • (2006) Robot. Comput. Integr. Manuf. , vol.22 , pp. 353-362
    • Chan, F.T.S.1    Swarnkar, R.2
  • 29
    • 27844479532 scopus 로고    scopus 로고
    • Fuzzy goal-programming model with an artificial immune system (AIS) approach for a machine-tool selection and operation allocation problem in a flexible manufacturing system
    • Chan, F. T. S.; Swarnkar, R.; Tiwari, M. K.: Fuzzy goal-programming model with an artificial immune system (AIS) approach for a machine-tool selection and operation allocation problem in a flexible manufacturing system. Int. J. Prod. Res. 43(19), 4147-4163 (2005).
    • (2005) Int. J. Prod. Res , vol.43 , Issue.19 , pp. 4147-4163
    • Chan, F.T.S.1    Swarnkar, R.2    Tiwari, M.K.3
  • 31
    • 0006033920 scopus 로고    scopus 로고
    • A hierarchic approach to production planning and scheduling of a flexible manufacturing system
    • Persi P., Ukovich W., Pesenti R., Nicolich M.: A hierarchic approach to production planning and scheduling of a flexible manufacturing system. Robot. Comput. Integr. Manuf. 15, 373-385 (1999).
    • (1999) Robot. Comput. Integr. Manuf. , vol.15 , pp. 373-385
    • Persi, P.1    Ukovich, W.2    Pesenti, R.3    Nicolich, M.4
  • 32
    • 33750307628 scopus 로고    scopus 로고
    • A multi-objective model of operation allocation and material handling system selection in FMS design
    • Sujono, S., Lashkari, R. S.: A multi-objective model of operation allocation and material handling system selection in FMS design. Int. J. Prod. Econ. 105(1), 116-33 (2007).
    • (2007) Int. J. Prod. Econ , vol.105 , Issue.1 , pp. 116-133
    • Sujono, S.1    Lashkari, R.S.2
  • 33
    • 0023416625 scopus 로고
    • A new formulation of operation allocation problem in flexible manufacturing systems: mathematical modelling and computational experience
    • Lashkari R. S., Dutta S. P., Padhye A. M.: A new formulation of operation allocation problem in flexible manufacturing systems: mathematical modelling and computational experience. Int. J. Prod. Res. 25, 1267-1283 (1987).
    • (1987) Int. J. Prod. Res. , vol.25 , pp. 1267-1283
    • Lashkari, R.S.1    Dutta, S.P.2    Padhye, A.M.3
  • 34
    • 0024714612 scopus 로고
    • An alternative formulation of the operation allocation problem in flexible manufacturing systems
    • Wilson J. M.: An alternative formulation of the operation allocation problem in flexible manufacturing systems. Int. J. Prod. Res. 27, 1405-1412 (1989).
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 1405-1412
    • Wilson, J.M.1
  • 35
    • 75749089533 scopus 로고    scopus 로고
    • A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations
    • Zeballos, L. J.; Quiroga, O. D.; Henning, G. P.: A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations. Eng. Appl. Artif. Intell. 23, 229-48 (2010).
    • (2010) Eng. Appl. Artif. Intell , vol.23 , pp. 229-248
    • Zeballos, L.J.1    Quiroga, O.D.2    Henning, G.P.3
  • 36
    • 79957602862 scopus 로고    scopus 로고
    • Performance analysis of a flexible manufacturing system under planning and control strategies
    • Wadhwa, S.; Ducq, Y.; Ali, M.; Prakash, A.: Performance analysis of a flexible manufacturing system under planning and control strategies. Stud. Inform. Control 17(3), 273-284 (2008).
    • (2008) Stud. Inform. Control , vol.17 , Issue.3 , pp. 273-284
    • Wadhwa, S.1    Ducq, Y.2    Ali, M.3    Prakash, A.4
  • 37
    • 79953667406 scopus 로고    scopus 로고
    • Performance analysis of a flexible manufacturing system
    • Wadhwa S., Ducq Y., Ali M., Prakash A.: Performance analysis of a flexible manufacturing system. Glob. J. Flex. Syst. Manag. 10(3), 23-34 (2009).
    • (2009) Glob. J. Flex. Syst. Manag. , vol.10 , Issue.3 , pp. 23-34
    • Wadhwa, S.1    Ducq, Y.2    Ali, M.3    Prakash, A.4
  • 38
    • 23344453490 scopus 로고    scopus 로고
    • Modeling and heuristics of FMS scheduling with multiple objectives
    • Law C., Yip Y., Wu T.: Modeling and heuristics of FMS scheduling with multiple objectives. Comput. Oper. Res. 33, 674-694 (2006).
    • (2006) Comput. Oper. Res. , vol.33 , pp. 674-694
    • Law, C.1    Yip, Y.2    Wu, T.3
  • 39
    • 0038243040 scopus 로고    scopus 로고
    • Operation sequence and tool selection in flexible manufacturing system under dynamic tool allocation
    • Lee, C. S.; Kim, S. S.; Choi, J. S.: Operation sequence and tool selection in flexible manufacturing system under dynamic tool allocation. Comput. Ind. Eng. 45, 61-73 (2003).
    • (2003) Comput. Ind. Eng , vol.45 , pp. 61-73
    • Lee, C.S.1    Kim, S.S.2    Choi, J.S.3
  • 40
    • 1842864950 scopus 로고    scopus 로고
    • Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach
    • Swarnker, R.; Tiwari, M. K.: Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach. Robot. Comput. Integr. Manuf. 20, 199-209 (2004).
    • (2004) Robot. Comput. Integr. Manuf , vol.20 , pp. 199-209
    • Swarnker, R.1    Tiwari, M.K.2
  • 42
    • 77955421552 scopus 로고    scopus 로고
    • The simulation design and analysis of a flexible manufacturing system with automated guided vehicle system
    • Um, I.; Cheon, H.; Lee H.: The simulation design and analysis of a flexible manufacturing system with automated guided vehicle system. J. Manuf. Syst. 28(4), 115-22 (2009).
    • (2009) J. Manuf. Syst , vol.28 , Issue.4 , pp. 115-122
    • Um, I.1    Cheon, H.2    Lee, H.3
  • 43
    • 0037284917 scopus 로고    scopus 로고
    • Performance modelling and evaluation of dynamic tool allocation in flexible manufacturing systems using coloured Petri nets: An object-oriented approach
    • Chen, J.; Chen, F. F.: Performance modelling and evaluation of dynamic tool allocation in flexible manufacturing systems using coloured Petri nets: an object-oriented approach. Int. J. Adv. Manuf. Technol. 21(2), 98-109 (2003).
    • (2003) Int. J. Adv. Manuf. Technol , vol.21 , Issue.2 , pp. 98-109
    • Chen, J.1    Chen, F.F.2
  • 44
    • 0002016604 scopus 로고    scopus 로고
    • A simulation study of FMS tool allocation procedures
    • Amoako-Gyampah K., Meredith J. R.: A simulation study of FMS tool allocation procedures. J. Manuf. Syst. 15(6), 419-431 (1996).
    • (1996) J. Manuf. Syst. , vol.15 , Issue.6 , pp. 419-431
    • Amoako-Gyampah, K.1    Meredith, J.R.2
  • 45
    • 13844322261 scopus 로고    scopus 로고
    • A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm
    • Chen J., Ho S.: A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm. Int. J. Mach. Tools Manuf. 45, 949-957 (2005).
    • (2005) Int. J. Mach. Tools Manuf. , vol.45 , pp. 949-957
    • Chen, J.1    Ho, S.2
  • 46
    • 0033318858 scopus 로고    scopus 로고
    • Multiobjective evolutionary algorithms: A comparative case study and the strengthen Pareto approach
    • Zitzler, E.; Thiele, L.: Multiobjective evolutionary algorithms: a comparative case study and the strengthen Pareto approach. IEEE Trans. Evol. Comput. 4(3), 257-271 (1999).
    • (1999) IEEE Trans. Evol. Comput , vol.4 , Issue.3 , pp. 257-271
    • Zitzler, E.1    Thiele, L.2
  • 47
    • 33644772055 scopus 로고    scopus 로고
    • A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system
    • Nagarjuna, N.; Mahesh, O.; Rajagopal, K.: A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system. Robot. Comput. Integr. Manuf. 22, 342-352 (2006).
    • (2006) Robot. Comput. Integr. Manuf , vol.22 , pp. 342-352
    • Nagarjuna, N.1    Mahesh, O.2    Rajagopal, K.3
  • 48
    • 29344456976 scopus 로고    scopus 로고
    • A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: A quick converging simulated annealing-based approach
    • Mishra, S.; Prakash, N.; Tiwari, M. K.; Lashkari, R. S.: A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approach. Int. J. Prod. Res. 44(1), 43-76 (2006).
    • (2006) Int. J. Prod. Res , vol.44 , Issue.1 , pp. 43-76
    • Mishra, S.1    Prakash, N.2    Tiwari, M.K.3    Lashkari, R.S.4
  • 49
    • 33750593629 scopus 로고    scopus 로고
    • Solving parttype and operation allocation problems in an FMS: An approach using constraints-based fast simulated annealing algorithm
    • Tiwari, M. K.; Kumar, S.; Kumar, S.; Prakash, P. S. R.: Solving parttype and operation allocation problems in an FMS: an approach using constraints-based fast simulated annealing algorithm. IEEE Trans. Syst. Man Cybern. A 36, 1170-1184 (2006).
    • (2006) IEEE Trans. Syst. Man Cybern. A , vol.36 , pp. 1170-1184
    • Tiwari, M.K.1    Kumar, S.2    Kumar, S.3    Prakash, P.S.R.4
  • 50
    • 33748437416 scopus 로고    scopus 로고
    • Solving machineloading problem of a flexible manufacturing system with constraint-based genetic algorithm
    • Kumar A., Prakash N., Tiwari M. K., Shankar R., Baveja A.: Solving machineloading problem of a flexible manufacturing system with constraint-based genetic algorithm. Eur. J. Oper. Res. 175(2), 1043-1069 (2006).
    • (2006) Eur. J. Oper. Res. , vol.175 , Issue.2 , pp. 1043-1069
    • Kumar, A.1    Prakash, N.2    Tiwari, M.K.3    Shankar, R.4    Baveja, A.5
  • 51
    • 36749027726 scopus 로고    scopus 로고
    • Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems
    • Prakash A, Khilwani N, Tiwari MK, Cohen Y. Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems. Adv. Eng. Softw. 39, 219-232 (2008).
    • (2008) Adv. Eng. Softw , vol.39 , pp. 219-232
    • Prakash, A.1    Khilwani, N.2    Tiwari, M.K.3    Cohen, Y.4
  • 52
    • 56349133631 scopus 로고    scopus 로고
    • Minimizing the number of tool switching instants in flexible manufacturing systems
    • Konak A., Kulturel-Konak S., Azizoglu M.: Minimizing the number of tool switching instants in flexible manufacturing systems. Int. J. Prod. Econ. 116, 298-307 (2008).
    • (2008) Int. J. Prod. Econ. , vol.116 , pp. 298-307
    • Konak, A.1    Kulturel-Konak, S.2    Azizoglu, M.3
  • 53
    • 78751507490 scopus 로고    scopus 로고
    • Operation allocation in automated manufacturing system using GA-based approach with multifidelity models
    • Chan F. T. S., Chaub A., Mohan V., Arora V., Tiwari M. K.: Operation allocation in automated manufacturing system using GA-based approach with multifidelity models. Robot. Comput. Integr. Manuf. 26(5), 526-534 (2010).
    • (2010) Robot. Comput. Integr. Manuf. , vol.26 , Issue.5 , pp. 526-534
    • Chan, F.T.S.1    Chaub, A.2    Mohan, V.3    Arora, V.4    Tiwari, M.K.5
  • 54
    • 0009993525 scopus 로고
    • A dynamic theory of organizational knowledge creation
    • Nonaka I.: A dynamic theory of organizational knowledge creation. Organ. Sci. 5(1), 14-37 (1994).
    • (1994) Organ. Sci. , vol.5 , Issue.1 , pp. 14-37
    • Nonaka, I.1
  • 56
    • 0037291526 scopus 로고    scopus 로고
    • From R&D management to knowledge management: An overview of studies of innovation management
    • Nietok, M.: From R&D management to knowledge management: An overview of studies of innovation management. Technol Forecast. Soc. Chang. 70, 135-161 (2003).
    • (2003) Technol Forecast. Soc. Chang , vol.70 , pp. 135-161
    • Nietok, M.1
  • 57
    • 84861497257 scopus 로고    scopus 로고
    • Improved applied element simulation of RC and composite structures under extreme loading conditions
    • EL-Kholy S. A., Gomaa M. S., Akl A. Y.: Improved applied element simulation of RC and composite structures under extreme loading conditions. Arab. J. Sci. Eng. 37(4), 921-933 (2012).
    • (2012) Arab. J. Sci. Eng. , vol.37 , Issue.4 , pp. 921-933
    • EL-Kholy, S.A.1    Gomaa, M.S.2    Akl, A.Y.3
  • 58
    • 84859168760 scopus 로고    scopus 로고
    • Applying agent-based system and negotiation mechanism in improvement of inventory management and customer order fulfilment in multi echelon supply chain
    • Saberi, S.; Nookabadi, A. S.; Hejazi, S. R.: Applying agent-based system and negotiation mechanism in improvement of inventory management and customer order fulfilment in multi echelon supply chain. Arab. J. Sci. Eng. 37(3), 851-861 (2012).
    • (2012) Arab. J. Sci. Eng , vol.37 , Issue.3 , pp. 851-861
    • Saberi, S.1    Nookabadi, A.S.2    Hejazi, S.R.3
  • 62
    • 84899655664 scopus 로고    scopus 로고
    • Developing knowledge management cycle processes based on knowledge management success factors
    • Dastranj Mamaghani N., Akhavan P., Oliyaee E., Saghafi F.: Developing knowledge management cycle processes based on knowledge management success factors. J. Sci. Technol. Policy 3(2), 1-13 (2011).
    • (2011) J. Sci. Technol. Policy , vol.3 , Issue.2 , pp. 1-13
    • Dastranj Mamaghani, N.1    Akhavan, P.2    Oliyaee, E.3    Saghafi, F.4
  • 65
    • 84899623827 scopus 로고    scopus 로고
    • The effect of protection of intellectual property rights on brain drain from selected developing investigating infrastructural barriers in knowledge management implementation and proposing an improvement model in higher education
    • Rabiee A., Maali M.: The effect of protection of intellectual property rights on brain drain from selected developing investigating infrastructural barriers in knowledge management implementation and proposing an improvement model in higher education. J. Sci. Technol. Policy 5(1), 1-16 (2012).
    • (2012) J. Sci. Technol. Policy , vol.5 , Issue.1 , pp. 1-16
    • Rabiee, A.1    Maali, M.2
  • 67
    • 84875093620 scopus 로고    scopus 로고
    • Social network analysis application for knowledge management system needs elicitation in knowledge-based organizations
    • Sepehri M., Riahi A.: Social network analysis application for knowledge management system needs elicitation in knowledge-based organizations. J. Sci. Technol. Policy 3(2), 81-95 (2011).
    • (2011) J. Sci. Technol. Policy , vol.3 , Issue.2 , pp. 81-95
    • Sepehri, M.1    Riahi, A.2
  • 68
    • 84899647612 scopus 로고    scopus 로고
    • A practical model for evaluating the maturity of knowledge management in the software industry
    • Sohrabi B., Raeesi Vanani I., Alidousti S.: A practical model for evaluating the maturity of knowledge management in the software industry. J. Sci. Technol. Policy 3(1), 63-81 (2010).
    • (2010) J. Sci. Technol. Policy , vol.3 , Issue.1 , pp. 63-81
    • Sohrabi, B.1    Raeesi Vanani, I.2    Alidousti, S.3
  • 70
    • 9744248703 scopus 로고    scopus 로고
    • Review: Knowledge management and knowledge management systems: Conceptual foundations and research issues
    • Alavi M., Leidner D. E.: Review: Knowledge management and knowledge management systems: Conceptual foundations and research issues. MIS Q. 25, 107-136 (2001).
    • (2001) MIS Q. , vol.25 , pp. 107-136
    • Alavi, M.1    Leidner, D.E.2
  • 71
    • 4143146193 scopus 로고    scopus 로고
    • Knowledge management metrics
    • Bose R.: Knowledge management metrics. Ind. Manag. Data Syst. 104(6), 457-468 (2004).
    • (2004) Ind. Manag. Data Syst. , vol.104 , Issue.6 , pp. 457-468
    • Bose, R.1
  • 72
    • 42149113468 scopus 로고    scopus 로고
    • Knowledge management in small and mediumsized enterprises
    • Chan I., Chao C.: Knowledge management in small and mediumsized enterprises. Commun. ACM 51(4), 83-88 (2008).
    • (2008) Commun. ACM , vol.51 , Issue.4 , pp. 83-88
    • Chan, I.1    Chao, C.2
  • 73
    • 27644502207 scopus 로고    scopus 로고
    • A thematic analysis of the thinking in knowledge management
    • In: Despres, C.; Chauval, D. (Eds.), Butterworth-Heinemann, Boston
    • Despres, C.; Chauval, D.: A thematic analysis of the thinking in knowledge management. In: Despres, C.; Chauval, D. (Eds.) The Present and Promise of Knowledge Management. Butterworth-Heinemann, Boston (2000).
    • (2000) The Present and Promise of Knowledge Management
    • Despres, C.1    Chauval, D.2
  • 74
    • 0034906005 scopus 로고    scopus 로고
    • Knowledge management: an organizational capabilities perspective
    • Gold A. H., Malhotra A., Segars A. H.: Knowledge management: an organizational capabilities perspective. J. Manag. Inform. Syst. 18(1), 185-214 (2001).
    • (2001) J. Manag. Inform. Syst. , vol.18 , Issue.1 , pp. 185-214
    • Gold, A.H.1    Malhotra, A.2    Segars, A.H.3
  • 75
    • 84859179804 scopus 로고    scopus 로고
    • Siting, sizing, timing and determining the service area of MV/LV transformers: a novel approach
    • Jannaty H., Moshtagh J.: Siting, sizing, timing and determining the service area of MV/LV transformers: a novel approach. Arab. J. Sci. Eng. 37(3), 683-695 (2012).
    • (2012) Arab. J. Sci. Eng. , vol.37 , Issue.3 , pp. 683-695
    • Jannaty, H.1    Moshtagh, J.2
  • 76
    • 84899632263 scopus 로고    scopus 로고
    • Solving the job shop scheduling problem via a modified PSO
    • Sadrzadeh A.: Solving the job shop scheduling problem via a modified PSO. Tech. J. Eng. Appl. Sci. 3(1), 59-64 (2013).
    • (2013) Tech. J. Eng. Appl. Sci. , vol.3 , Issue.1 , pp. 59-64
    • Sadrzadeh, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.