-
1
-
-
0010848666
-
An extended dispatching rule approach in an on-line scheduling framework for batch process management
-
N Ishii M Muraki 1996 An extended dispatching rule approach in an on-line scheduling framework for batch process management Int J Prod Res 34 2 329 348 0924.90082 10.1080/00207549608904906 (Pubitemid 126519751)
-
(1996)
International Journal of Production Research
, vol.34
, Issue.2
, pp. 329-348
-
-
Ishii, N.1
Muraki, M.2
-
2
-
-
0031165072
-
Dynamic selection of dispatching rules for manufacturing system scheduling
-
H Pierreval N Mebarki 1997 Dynamic scheduling selection of dispatching rules for manufacturing system Int J Prod Res 35 6 1575 1591 0943.90577 10.1080/002075497195137 (Pubitemid 127549684)
-
(1997)
International Journal of Production Research
, vol.35
, Issue.6
, pp. 1575-1591
-
-
Pierreval, H.1
Mebarki, N.2
-
3
-
-
0038481221
-
Analysis of dynamic dispatching rules for a flexible manufacturing system
-
10.1016/S0924-0136(03)00093-1
-
FTS Chan HK Chan HCW Lau RWL Ip 2003 Analysis of dynamic dispatching rules for a flexible manufacturing system J Mater Process Technol 138 325 331 10.1016/S0924-0136(03)00093-1
-
(2003)
J Mater Process Technol
, vol.138
, pp. 325-331
-
-
Chan, F.T.S.1
Chan, H.K.2
Lau, H.C.W.3
Ip, R.W.L.4
-
4
-
-
3242671403
-
Analysis of dynamic control strategies of an FMS under different scenarios
-
10.1016/j.rcim.2004.03.005
-
FTS Chan HK Chan 2004 Analysis of dynamic control strategies of an FMS under different scenarios Robot Comput Integr Manuf 20 423 437 10.1016/j.rcim.2004.03.005
-
(2004)
Robot Comput Integr Manuf
, vol.20
, pp. 423-437
-
-
Chan, F.T.S.1
Chan, H.K.2
-
5
-
-
2042436401
-
Effect of dynamic and static dispatching strategies on dynamically planned and unplanned FMS
-
10.1016/j.jmatprotec.2004.01.054
-
MG Abou-Ali MA Shouman 2004 Effect of dynamic and static dispatching strategies on dynamically planned and unplanned FMS J Mater Process Technol 148 132 138 10.1016/j.jmatprotec.2004.01.054
-
(2004)
J Mater Process Technol
, vol.148
, pp. 132-138
-
-
Abou-Ali, M.G.1
Shouman, M.A.2
-
6
-
-
34248666540
-
Fuzzy sets
-
219427 0139.24606 10.1016/S0019-9958(65)90241-X
-
LA Zadeh 1965 Fuzzy sets Inf Control 8 338 353 219427 0139.24606 10.1016/S0019-9958(65)90241-X
-
(1965)
Inf Control
, vol.8
, pp. 338-353
-
-
Zadeh, L.A.1
-
7
-
-
14744268610
-
Robust stabilization of nonlinear multiple time-delay large-scale systems via decentralized fuzzy control
-
DOI 10.1109/TFUZZ.2004.836067
-
FH Hsiao JD Hwang CW Chen ZR Tsai 2005 Robust stabilization of nonlinear multiple time-delay large-scale systems via decentralized fuzzy control IEEE Trans Fuzzy Syst 13 1 152 163 10.1109/TFUZZ.2004.836067 (Pubitemid 40324797)
-
(2005)
IEEE Transactions on Fuzzy Systems
, vol.13
, Issue.1
, pp. 152-163
-
-
Hsiao, F.-H.1
Hwang, J.-D.2
Chen, C.-W.3
Tsai, Z.-R.4
-
8
-
-
70349904299
-
Adaptive fuzzy sliding mode control for seismically excited bridges with lead rubber bearing isolation
-
1186.93051 10.1142/S0218488509006224
-
CW Chen K Yeh KFR Liu 2009 Adaptive fuzzy sliding mode control for seismically excited bridges with lead rubber bearing isolation Int J Uncertain Fuzziness Knowl Based Syst 17 5 705 727 1186.93051 10.1142/S0218488509006224
-
(2009)
Int J Uncertain Fuzziness Knowl Based Syst
, vol.17
, Issue.5
, pp. 705-727
-
-
Chen, C.W.1
Yeh, K.2
Liu, K.F.R.3
-
9
-
-
74249095245
-
Fuzzy control for an oceanic structure: A case study in time-delay TLP system
-
2642763 10.1177/1077546309339424
-
CY Chen JW Lin WI Lee CW Chen 2010 Fuzzy control for an oceanic structure: a case study in time-delay TLP system J Vib Control 16 1 147 160 2642763 10.1177/1077546309339424
-
(2010)
J Vib Control
, vol.16
, Issue.1
, pp. 147-160
-
-
Chen, C.Y.1
Lin, J.W.2
Lee, W.I.3
Chen, C.W.4
-
10
-
-
0032686543
-
Fuzzy inference-based multiple criteria FMS scheduling
-
0949.90545 10.1080/002075499190789
-
L Yu HM Shih T Sekiguchi 1999 Fuzzy inference-based multiple criteria FMS scheduling Int J Prod Res 37 10 2315 2333 0949.90545 10.1080/002075499190789
-
(1999)
Int J Prod Res
, vol.37
, Issue.10
, pp. 2315-2333
-
-
Yu, L.1
Shih, H.M.2
Sekiguchi, T.3
-
13
-
-
0036497435
-
A fuzzy logic based methodology to rank shop floor dispatching rules
-
DOI 10.1016/S0925-5273(01)00171-2, PII S0925527301001712
-
A Petroni A Rizzi 2002 A fuzzy logic based methodology to rank shop floor dispatching rules Int J Prod Econ 76 99 108 10.1016/S0925-5273(01)00171-2 (Pubitemid 33107299)
-
(2002)
International Journal of Production Economics
, vol.76
, Issue.1
, pp. 99-108
-
-
Petroni, A.1
Rizzi, A.2
-
14
-
-
0042733401
-
Real time fuzzy scheduling rules in FMS
-
10.1023/A:1024601826420
-
FTS Chan HK Chan A Kazeroomi 2003 Real time fuzzy scheduling rules in FMS J Intell Manuf 14 341 350 10.1023/A:1024601826420
-
(2003)
J Intell Manuf
, vol.14
, pp. 341-350
-
-
Chan, F.T.S.1
Chan, H.K.2
Kazeroomi, A.3
-
15
-
-
0037056107
-
A fuzzy logic approach to an integrated maintenance/production scheduling algorithm
-
DOI 10.1080/00207540210146143
-
A Sudiarso AW Labib 2002 A fuzzy logic approach to an integrated maintenance/production scheduling algorithm Int J Prod Res 40 13 3121 3138 1081.90561 10.1080/00207540210146143 (Pubitemid 35019432)
-
(2002)
International Journal of Production Research
, vol.40
, Issue.13
, pp. 3121-3138
-
-
Sudiarso, A.1
Labib, A.W.2
-
16
-
-
33646394085
-
A fuzzy logic modeling of dynamic scheduling in FMS
-
10.1080/00207540500465493
-
P Srinoi E Shayan F Ghotb 2006 A fuzzy logic modeling of dynamic scheduling in FMS Int J Prod Res 44 11 2138 2203 10.1080/00207540500465493
-
(2006)
Int J Prod Res
, vol.44
, Issue.11
, pp. 2138-2203
-
-
Srinoi, P.1
Shayan, E.2
Ghotb, F.3
-
17
-
-
2442537149
-
Job shop scheduling using fuzzy logic
-
10.1007/s00170-003-1771-2
-
O Bilkay AO Anlagan ASE Kilic 2004 Job shop scheduling using fuzzy logic Int J Adv Manuf Technol 23 7-8 606 619 10.1007/s00170-003-1771-2
-
(2004)
Int J Adv Manuf Technol
, vol.23
, Issue.78
, pp. 606-619
-
-
Bilkay, O.1
Anlagan, A.O.2
Kilic, A.S.E.3
-
18
-
-
27844479532
-
Fuzzy goal-programming model with an artificial immune system (AIS) approach for a machine tool selection and operation allocation problem in a flexible manufacturing system
-
DOI 10.1080/00207540500140823
-
FTS Chan R Swarnkar MK Tiwari 2005 Fuzzy goal-programming model with an artificial immune system (AIS) approach for a machine tool selection and operation allocation problem in a flexible manufacturing system Int J Prod Res 43 19 4147 4163 1080.90513 10.1080/00207540500140823 (Pubitemid 41657427)
-
(2005)
International Journal of Production Research
, vol.43
, Issue.19
, pp. 4147-4163
-
-
Chan, F.T.S.1
Swarnkar, R.2
Tiwari, M.K.3
-
19
-
-
33644751275
-
Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS
-
DOI 10.1016/j.rcim.2005.08.001, PII S073658450500061X
-
FTS Chan R Swarnkar 2006 Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS Robot Comput Integr Manuf 22 4 353 362 10.1016/j.rcim.2005.08.001 (Pubitemid 43343780)
-
(2006)
Robotics and Computer-Integrated Manufacturing
, vol.22
, Issue.4
, pp. 353-362
-
-
Chan, F.T.S.1
Swarnkar, R.2
-
20
-
-
34547373474
-
A fuzzy dispatching strategy for due-date scheduling of FMSs with information delays
-
1197.90196 10.1007/s10696-006-9002-4
-
R Caprihan A Kumar KE Stecke 2006 A fuzzy dispatching strategy for due-date scheduling of FMSs with information delays Int J Flex Manuf Syst 18 29 53 1197.90196 10.1007/s10696-006-9002-4
-
(2006)
Int J Flex Manuf Syst
, vol.18
, pp. 29-53
-
-
Caprihan, R.1
Kumar, A.2
Stecke, K.E.3
-
21
-
-
79751530467
-
Selection of dispatching rules with fuzzy ANP approach
-
10.1007/s00170-010-2739-7
-
HR Yazgan 2010 Selection of dispatching rules with fuzzy ANP approach Int J Adv Manuf Technol 10.1007/s00170-010-2739-7
-
(2010)
Int J Adv Manuf Technol
-
-
Yazgan, H.R.1
-
22
-
-
0030786875
-
Production scheduling/rescheduling in flexible manufacturing
-
AK Jain HA Elmaraghy 1997 Production scheduling rescheduling in flexible manufacturing Int J Prod Res 35 1 281 309 0949.90645 10.1080/002075497196082 (Pubitemid 127553379)
-
(1997)
International Journal of Production Research
, vol.35
, Issue.1
, pp. 281-309
-
-
Jain, A.K.1
Elmaraghy, H.A.2
-
23
-
-
29444438437
-
Dynamic job shop scheduling: A survey of simulation research
-
10.1016/0305-0483(90)90017-4
-
R Ramasesh 1990 Dynamic job shop scheduling: a survey of simulation research Omega Int J Manag Sci 18 1 43 57 10.1016/0305-0483(90)90017-4
-
(1990)
Omega Int J Manag Sci
, vol.18
, Issue.1
, pp. 43-57
-
-
Ramasesh, R.1
-
24
-
-
0026907894
-
Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system
-
10.1080/00207549208948120
-
MR O'Keefe T Kasirajan 1992 Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system Int J Prod Res 30 8 1753 1773 10.1080/00207549208948120
-
(1992)
Int J Prod Res
, vol.30
, Issue.8
, pp. 1753-1773
-
-
O'Keefe, M.R.1
Kasirajan, T.2
|