메뉴 건너뛰기




Volumn 31, Issue 2, 2012, Pages 224-231

A novel 0-1 linear integer programming model for dynamic machine-tool selection and operation allocation in a flexible manufacturing system

Author keywords

Flexible manufacturing system; Operation allocation; Part movement; Production planning; Tool movement, Heuristic method

Indexed keywords

CPU TIME; FLEXIBLE MANUFACTURING SYSTEM (FMS); LINEAR INTEGER PROGRAMMING; MACHINING COSTS; MATERIAL HANDLING COSTS; NP-HARD; OBJECTIVE FUNCTION VALUES; OPERATION ALLOCATION; PART MOVEMENT; PRODUCTION COST; PRODUCTION PHASE; PRODUCTION PLANNING; SETUP COSTS;

EID: 84858336261     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2011.07.008     Document Type: Article
Times cited : (28)

References (24)
  • 1
    • 0038243040 scopus 로고    scopus 로고
    • Operation sequence and tool selection in flexible manufacturing system under dynamic tool allocation
    • C.S. Lee, S.S. Kim, and J.S. Choi Operation sequence and tool selection in flexible manufacturing system under dynamic tool allocation Computer & Industrial Engineering 45 2003 61 73
    • (2003) Computer & Industrial Engineering , vol.45 , pp. 61-73
    • Lee, C.S.1    Kim, S.S.2    Choi, J.S.3
  • 2
    • 33644751275 scopus 로고    scopus 로고
    • Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS
    • DOI 10.1016/j.rcim.2005.08.001, PII S073658450500061X
    • F.T.S. Chan, and R. Swarnkar Ant colony optimization approach to a goal programming model for a machine tool selection and operation allocation problem in an FMS Robotics and Computer-Integrated Manufacturing 22 2006 353 362 (Pubitemid 43343780)
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , Issue.4 , pp. 353-362
    • Chan, F.T.S.1    Swarnkar, R.2
  • 3
    • 27844479532 scopus 로고    scopus 로고
    • Fuzzy goal-programming model with an artificial immune system (AIS) approach for a machine tool selection and operation allocation problem in a flexible manufacturing system
    • DOI 10.1080/00207540500140823
    • F.T.S. Chan, R. Swarnkar, and M.K. Tiwari Fuzzy goal-programming model with an artificial immune system (AIS) approach for a machine-tool selection and operation allocation problem in a flexible manufacturing system International Journal of Production Research 43 19 2005 4147 4163 (Pubitemid 41657427)
    • (2005) International Journal of Production Research , vol.43 , Issue.19 , pp. 4147-4163
    • Chan, F.T.S.1    Swarnkar, R.2    Tiwari, M.K.3
  • 6
    • 13844322261 scopus 로고    scopus 로고
    • A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm
    • DOI 10.1016/j.ijmachtools.2004.10.010, PII S0890695504002640
    • J. Chen, and S. Ho A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm International Journal of Machine Tools & Manufacture 45 2005 949 957 (Pubitemid 40259573)
    • (2005) International Journal of Machine Tools and Manufacture , vol.45 , Issue.7-8 , pp. 949-957
    • Chen, J.-H.1    Ho, S.-Y.2
  • 7
    • 0033318858 scopus 로고    scopus 로고
    • Multiobjective evolutionary algorithms a comparative case study and the strength pareto approach
    • DOI 10.1109/4235.797969
    • E. Zitzler, and L. Thiele Multiobjective evolutionary algorithms: a comparative case study and the strengthen Pareto approach IEEE Transaction on Evolutionary Computation 4 3 1999 257 271 (Pubitemid 30544879)
    • (1999) IEEE Transactions on Evolutionary Computation , vol.3 , Issue.4 , pp. 257-271
    • Zitzler Eckart1    Thiele Lothar2
  • 9
    • 1842864950 scopus 로고    scopus 로고
    • Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach
    • R. Swarnker, and M.K. Tiwari Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach Robotics and Computer-Integrated Manufacturing 20 2004 199 209
    • (2004) Robotics and Computer-Integrated Manufacturing , vol.20 , pp. 199-209
    • Swarnker, R.1    Tiwari, M.K.2
  • 10
    • 33644772055 scopus 로고    scopus 로고
    • A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system
    • DOI 10.1016/j.rcim.2005.07.006, PII S0736584505000608
    • N. Nagarjuna, O. Mahesh, and K. Rajagopal A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system Robotics and Computer-Integrated Manufacturing 22 2006 342 352 (Pubitemid 43343779)
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , Issue.4 , pp. 342-352
    • Nagarjuna, N.1    Mahesh, O.2    Rajagopal, K.3
  • 11
    • 33748437416 scopus 로고    scopus 로고
    • Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm
    • DOI 10.1016/j.ejor.2005.06.025, PII S037722170500528X
    • A. Kumar, N. Prakash, M.K. Tiwari, R. Shankar, and A. Baveja Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm European Journal of Operational Research 175 2 2006 1043 1069 (Pubitemid 44345091)
    • (2006) European Journal of Operational Research , vol.175 , Issue.2 , pp. 1043-1069
    • Kumar, A.1    Prakash2    Tiwari, M.K.3    Shankar, R.4    Baveja, A.5
  • 12
    • 33750307628 scopus 로고    scopus 로고
    • A multi-objective model of operation allocation and material handling system selection in FMS design
    • DOI 10.1016/j.ijpe.2005.07.007, PII S0925527306000697
    • S. Sujono, and R.S. Lashkari A multi-objective model of operation allocation and material handling system selection in FMS design International Journal of Production Economics 105 1 2007 116 133 (Pubitemid 44636201)
    • (2007) International Journal of Production Economics , vol.105 , Issue.1 , pp. 116-133
    • Sujono, S.1    Lashkari, R.S.2
  • 14
    • 0006033920 scopus 로고    scopus 로고
    • A hierarchic approach to production planning and scheduling of a flexible manufacturing system
    • PII S0736584599000344
    • P. Persi, W. Ukovich, R. Pesenti, and M. Nicolich A hierarchic approach to production planning and scheduling of a flexible manufacturing system Robotics and Computer-Integrated Manufacturing 15 1999 373 385 (Pubitemid 129591345)
    • (1999) Robotics and Computer-Integrated Manufacturing , vol.15 , Issue.5 , pp. 373-385
    • Persi, P.1    Ukovich, W.2    Pesenti, R.3    Nicolich, M.4
  • 15
    • 0033904098 scopus 로고    scopus 로고
    • LP-based approach for loading and routing in a flexible assembly line
    • DOI 10.1016/S0925-5273(99)00043-2
    • T. Sawik AnLP-based approach for loading and routing in a flexible assembly line International Journal of Production Economics 64 2000 49 58 (Pubitemid 30557642)
    • (2000) International Journal of Production Economics , vol.64 , Issue.1 , pp. 49-58
    • Sawik, T.1
  • 16
    • 23344453490 scopus 로고    scopus 로고
    • Modelling and heuristics of FMS scheduling with multiple objectives
    • DOI 10.1016/j.cor.2004.07.013, PII S0305054804001789
    • C. Law, Y. Yip, and T. Wu Modeling and heuristics of FMS scheduling with multiple objectives Computer and Operations Research 33 2006 674 694 (Pubitemid 41101119)
    • (2006) Computers and Operations Research , vol.33 , Issue.3 , pp. 674-694
    • Low, C.1    Yip, Y.2    Wu, T.-H.3
  • 17
    • 29344456976 scopus 로고    scopus 로고
    • A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: A quick converging simulated annealing-based approach
    • DOI 10.1080/13528160500245772, PII M51376228127236
    • S. Mishra, N. Prakash, M.K. Tiwari, and R.S. Lashkari A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approach International Journal of Production Research 44 1 2006 43 76 (Pubitemid 43000416)
    • (2006) International Journal of Production Research , vol.44 , Issue.1 , pp. 43-76
    • Mishra, S.1    Prakash2    Tiwari, M.K.3    Lashkari, R.S.4
  • 18
    • 0032070825 scopus 로고    scopus 로고
    • A model of machine-tool selection and operation allocation in FMS
    • A. Atmani, and R.S. Lashkari A model of machine-tool selection and operation allocation in FMS International Journal of Production Research 36 5 1998 1339 1349 (Pubitemid 128553202)
    • (1998) International Journal of Production Research , vol.36 , Issue.5 , pp. 1339-1349
    • Atmani, A.1    Lashkari, R.S.2
  • 19
    • 0037085109 scopus 로고    scopus 로고
    • Machine-tool selection and operation allocation in FMS: Solving a fuzzy goal-programming model using a genetic algorithm
    • DOI 10.1080/00207540110081515
    • R. Rai, S. Kameshwaran, and M.K. Tiwari Machine-tool selection and operation allocation in FMS: solving a fuzzy goal-programming model using a genetic algorithm International Journal of Production Research 40 3 2002 641 665 (Pubitemid 34593819)
    • (2002) International Journal of Production Research , vol.40 , Issue.3 , pp. 641-665
    • Rai, R.1    Kameshwaran, S.2    Tiwari, M.K.3
  • 22
    • 71749103834 scopus 로고    scopus 로고
    • A genetic algorithm based heuristic for scheduling of virtual manufacturing cells (VMCs)
    • S. Erhan Kesen, S.K. Das, and Z. Gungor A genetic algorithm based heuristic for scheduling of virtual manufacturing cells (VMCs) Computers & Operations Research 37 2010 1148 1156
    • (2010) Computers & Operations Research , vol.37 , pp. 1148-1156
    • Erhan Kesen, S.1    Das, S.K.2    Gungor, Z.3
  • 23
    • 75749089533 scopus 로고    scopus 로고
    • A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations
    • L.J. Zeballos, O.D. Quiroga, and G.P. Henning A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations Engineering Applications of Artificial Intelligence 23 2010 229 248
    • (2010) Engineering Applications of Artificial Intelligence , vol.23 , pp. 229-248
    • Zeballos, L.J.1    Quiroga, O.D.2    Henning, G.P.3
  • 24
    • 77955421552 scopus 로고    scopus 로고
    • The simulation design and analysis of a flexible manufacturing system with automated guided vehicle system
    • I. Um, H. Cheon, and H. Lee The simulation design and analysis of a flexible manufacturing system with automated guided vehicle system Journal of Manufacturing Systems 28 4 2009 115 122
    • (2009) Journal of Manufacturing Systems , vol.28 , Issue.4 , pp. 115-122
    • Um, I.1    Cheon, H.2    Lee, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.