메뉴 건너뛰기




Volumn 15, Issue 6, 1996, Pages 419-431

A simulation study of fms tool allocation procedures

Author keywords

Flexible manufacturing systems; Simulation; Tool allocation; Tool changes; Tool magazine capacity

Indexed keywords


EID: 0002016604     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0278-6125(97)83055-5     Document Type: Article
Times cited : (22)

References (35)
  • 1
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management for tool management in automated manufacturing
    • A.E. Gray, A. Seidmann, and K.E. Stecke, "A Synthesis of Decision Models for Tool Management for Tool Management in Automated Manufacturing," Management Science (v39,1993), pp549-567.
    • (1993) Management Science , vol.39 , pp. 549-567
    • Gray, A.E.1    Seidmann, A.2    Stecke, K.E.3
  • 5
    • 0021607371 scopus 로고
    • Decision support requirements in flexible manufacturing
    • R. Suri and C.K. Whitney, "Decision Support Requirements in Flexible Manufacturing," Journal of Manufacturing Systems (v3, n 1, 1984), pp61-69.
    • (1984) Journal of Manufacturing Systems , vol.3 , Issue.1 , pp. 61-69
    • Suri, R.1    Whitney, C.K.2
  • 7
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • K.E. Stecke, "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science (v29, 1983), pp273-288.
    • (1983) Management Science , vol.29 , pp. 273-288
    • Stecke, K.E.1
  • 8
    • 21844487443 scopus 로고
    • Scheduling a flexible manufacturing system with tooling constraints: An actual case study
    • S.W. Flanders and W.J. Davis, "Scheduling a Flexible Manufacturing System with Tooling Constraints: An Actual Case Study," Interfaces (v25, 1995), pp45-54.
    • (1995) Interfaces , vol.25 , pp. 45-54
    • Flanders, S.W.1    Davis, W.J.2
  • 10
    • 0026850995 scopus 로고
    • A comparison of tool management strategies and part selection for a flexible manufacturing system
    • K. Amoako-Gyampah, J.R. Meredith, and A. Raturi, "A Comparison of Tool Management Strategies and Part Selection for a Flexible Manufacturing System," International Journal of Production Research (v30, 1992),pp733-748.
    • (1992) International Journal of Production Research , vol.30 , pp. 733-748
    • Amoako-gyampah, K.1    Meredith, J.R.2    Raturi, A.3
  • 11
    • 0003348756 scopus 로고
    • Tooling strategies related to fms management
    • P. Tomek, "Tooling Strategies Related to FMS Management," FMS Magazine (v4, 1986), pp102-107.
    • (1986) FMS Magazine , vol.4 , pp. 102-107
    • Tomek, P.1
  • 14
    • 0026954929 scopus 로고
    • Procedures to determine part mix ratios for independent demands in flexible manufacturing systems
    • K.E. Stecke, "Procedures to Determine Part Mix Ratios for Independent Demands in Flexible Manufacturing Systems," IEEE Trans, on Engineering Management (v39, 1992), pp359-369.
    • (1992) IEEE Trans, on Engineering Management , vol.39 , pp. 359-369
    • Stecke, K.E.1
  • 18
    • 0011005678 scopus 로고
    • Installation of flexible manufacturing systems teaches management lessons in integration, labor, costs, benefits
    • April
    • J.R. Meredith, "Installation of Flexible Manufacturing Systems Teaches Management Lessons in Integration, Labor, Costs, Benefits," Industrial Engineering (April 1988), pp 17-27.
    • (1988) Industrial Engineering , pp. 17-27
    • Meredith, J.R.1
  • 19
    • 0001827599 scopus 로고
    • Classification and review of FMS scheduling procedures
    • R. Rachamadugu and K.E. Stecke, "Classification and Review of FMS Scheduling Procedures," Production Planning & Control (v5, 1994), pp2-20.
    • (1994) Production Planning & Control , vol.5 , pp. 2-20
    • Rachamadugu, R.1    Stecke, K.E.2
  • 21
    • 0004829780 scopus 로고
    • A constraint-directed method to solve the part selection problem in flexible manufacturing systems planning stage
    • K.E. Stecke and R. Suri, eds., Amsterdam: Elsevier Science Publishers, Aug.
    • S. Hwang, "A Constraint-Directed Method to Solve the Part Selection Problem in Flexible Manufacturing Systems Planning Stage," Proc. of 2nd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications, K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers, Aug. 1986), pp297-309.
    • (1986) Proc. of 2nd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications , pp. 297-309
    • Hwang, S.1
  • 22
    • 0028466353 scopus 로고
    • A comparative study of FMS tool allocation and part type selection approaches for a varying part type mix
    • K. Amoako-Gyampah, "A Comparative Study of FMS Tool Allocation and Part Type Selection Approaches for a Varying Part Type Mix," International Journal of Flexible Manufacturing Systems (v6, 1994), pp 179-207.
    • (1994) International Journal of Flexible Manufacturing Systems , vol.6 , pp. 179-207
    • Amoako-gyampah, K.1
  • 24
    • 0002874558 scopus 로고
    • Formulation and heuristic solutions for parts grouping and tool loading in flexible manufacturing systems
    • K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers, Aug.
    • S. Rajagopalan, "Formulation and Heuristic Solutions for Parts Grouping and Tool Loading in Flexible Manufacturing Systems," Proc. of 2nd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications, K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers, Aug. 1986), pp311-320.
    • (1986) Proc. of 2nd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications , pp. 311-320
    • Rajagopalan, S.1
  • 25
    • 0000363915 scopus 로고
    • Sequential decision procedures for batching and balancing in FMSs
    • C.K. Whitney and T.S. Gaul, "Sequential Decision Procedures for Batching and Balancing in FMSs," Annals of Operations Research (v3, 1985),pp301-316.
    • (1985) Annals of Operations Research , vol.3 , pp. 301-316
    • Whitney, C.K.1    Gaul, T.S.2
  • 27
    • 0003019633 scopus 로고
    • A study of FMS part type selection approaches for short-term production planning
    • K.E. Stecke and I. Kim, "A Study of FMS Part Type Selection Approaches for Short-term Production Planning," International Journal of Flexible Manufacturing Systems (vl, 1988), pp7-29.
    • (1988) International Journal of Flexible Manufacturing Systems , vol.1 , pp. 7-29
    • Stecke, K.E.1    Kim, I.2
  • 29
    • 0041536085 scopus 로고
    • A planning and scheduling system for flexible manufacturing systems
    • A. Kusiak, ed. (Amsterdam: Elsevier Science Publishers
    • T.E. Morton, and T.L. Smunt, "A Planning and Scheduling System for Flexible Manufacturing Systems," Flexible Manufacturing Systems: Methods and Studies, A. Kusiak, ed. (Amsterdam: Elsevier Science Publishers, 1986), pp151-164.
    • (1986) Flexible Manufacturing Systems: Methods and Studies , pp. 151-164
    • Morton, T.E.1    Smunt, T.L.2
  • 32
    • 77949999349 scopus 로고
    • The problem of the initial transient with respect to mean value in digital computer simulation and the evaluation of some proposed solutions
    • Los Angeles: Univ. of Southern Calif
    • A.V. Gafarian, C.J. Anker, and T. Morisaku, "The Problem of the Initial Transient with Respect to Mean Value in Digital Computer Simulation and the Evaluation of Some Proposed Solutions," Technical Report No. 77-1 (Los Angeles: Univ. of Southern Calif, 1977).
    • (1977) Technical Report No. 77-1
    • Gafarian, A.V.1    Anker, C.J.2    Morisaku, T.3
  • 33
    • 0004267620 scopus 로고
    • Englewood Cliffs, NJ: Prentice-Hall
    • G. Gordon, System Simulation (Englewood Cliffs, NJ: Prentice-Hall, 1969).
    • (1969) System Simulation
    • Gordon, G.1
  • 34
    • 0026254174 scopus 로고
    • Effects of loading and routing decisions on performance of flexible manufacturing systems
    • I.J. Chen and C.H. Chung, "Effects of Loading and Routing Decisions on Performance of Flexible Manufacturing Systems," International Journal of Production Research (v29, 1991), pp2209-2225.
    • (1991) International Journal of Production Research , vol.29 , pp. 2209-2225
    • Chen, I.J.1    Chung, C.H.2
  • 35
    • 0027928107 scopus 로고
    • Intermediate tool requirement planning for FMS
    • S.K. Khator and L.C. Leung, "Intermediate Tool Requirement Planning for FMS," Journal of Manufacturing Systems (v13, nl, 1994), pp9-19.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.1 , pp. 9-19
    • Khator, S.K.1    Leung, L.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.