-
1
-
-
0027591340
-
A synthesis of decision models for tool management for tool management in automated manufacturing
-
A.E. Gray, A. Seidmann, and K.E. Stecke, "A Synthesis of Decision Models for Tool Management for Tool Management in Automated Manufacturing," Management Science (v39,1993), pp549-567.
-
(1993)
Management Science
, vol.39
, pp. 549-567
-
-
Gray, A.E.1
Seidmann, A.2
Stecke, K.E.3
-
3
-
-
77951591664
-
Tool management in automated manufacturing: A tutorial
-
K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers
-
A.E. Gray, A. Seidmann, and K.E. Stecke, "Tool Management in Automated Manufacturing: A Tutorial," Proc. of 3rd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications, K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers, 1989), pp93-98.
-
(1989)
Proc. of 3rd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications
, pp. 93-98
-
-
Gray, A.E.1
Seidmann, A.2
Stecke, K.E.3
-
5
-
-
0021607371
-
Decision support requirements in flexible manufacturing
-
R. Suri and C.K. Whitney, "Decision Support Requirements in Flexible Manufacturing," Journal of Manufacturing Systems (v3, n 1, 1984), pp61-69.
-
(1984)
Journal of Manufacturing Systems
, vol.3
, Issue.1
, pp. 61-69
-
-
Suri, R.1
Whitney, C.K.2
-
7
-
-
0020718128
-
Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
-
K.E. Stecke, "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science (v29, 1983), pp273-288.
-
(1983)
Management Science
, vol.29
, pp. 273-288
-
-
Stecke, K.E.1
-
8
-
-
21844487443
-
Scheduling a flexible manufacturing system with tooling constraints: An actual case study
-
S.W. Flanders and W.J. Davis, "Scheduling a Flexible Manufacturing System with Tooling Constraints: An Actual Case Study," Interfaces (v25, 1995), pp45-54.
-
(1995)
Interfaces
, vol.25
, pp. 45-54
-
-
Flanders, S.W.1
Davis, W.J.2
-
10
-
-
0026850995
-
A comparison of tool management strategies and part selection for a flexible manufacturing system
-
K. Amoako-Gyampah, J.R. Meredith, and A. Raturi, "A Comparison of Tool Management Strategies and Part Selection for a Flexible Manufacturing System," International Journal of Production Research (v30, 1992),pp733-748.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 733-748
-
-
Amoako-gyampah, K.1
Meredith, J.R.2
Raturi, A.3
-
11
-
-
0003348756
-
Tooling strategies related to fms management
-
P. Tomek, "Tooling Strategies Related to FMS Management," FMS Magazine (v4, 1986), pp102-107.
-
(1986)
FMS Magazine
, vol.4
, pp. 102-107
-
-
Tomek, P.1
-
14
-
-
0026954929
-
Procedures to determine part mix ratios for independent demands in flexible manufacturing systems
-
K.E. Stecke, "Procedures to Determine Part Mix Ratios for Independent Demands in Flexible Manufacturing Systems," IEEE Trans, on Engineering Management (v39, 1992), pp359-369.
-
(1992)
IEEE Trans, on Engineering Management
, vol.39
, pp. 359-369
-
-
Stecke, K.E.1
-
16
-
-
34249836688
-
Cutting-tool management in computer-integrated manufacturing
-
D. Veeramani, D.M. Upton, and M.M. Barash, "Cutting-Tool Management in Computer-Integrated Manufacturing," International Journal of Flexible Manufacturing Systems (v3, 1992), pp237-265.
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.3
, pp. 237-265
-
-
Veeramani, D.1
Upton, D.M.2
Barash, M.M.3
-
18
-
-
0011005678
-
Installation of flexible manufacturing systems teaches management lessons in integration, labor, costs, benefits
-
April
-
J.R. Meredith, "Installation of Flexible Manufacturing Systems Teaches Management Lessons in Integration, Labor, Costs, Benefits," Industrial Engineering (April 1988), pp 17-27.
-
(1988)
Industrial Engineering
, pp. 17-27
-
-
Meredith, J.R.1
-
19
-
-
0001827599
-
Classification and review of FMS scheduling procedures
-
R. Rachamadugu and K.E. Stecke, "Classification and Review of FMS Scheduling Procedures," Production Planning & Control (v5, 1994), pp2-20.
-
(1994)
Production Planning & Control
, vol.5
, pp. 2-20
-
-
Rachamadugu, R.1
Stecke, K.E.2
-
21
-
-
0004829780
-
A constraint-directed method to solve the part selection problem in flexible manufacturing systems planning stage
-
K.E. Stecke and R. Suri, eds., Amsterdam: Elsevier Science Publishers, Aug.
-
S. Hwang, "A Constraint-Directed Method to Solve the Part Selection Problem in Flexible Manufacturing Systems Planning Stage," Proc. of 2nd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications, K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers, Aug. 1986), pp297-309.
-
(1986)
Proc. of 2nd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications
, pp. 297-309
-
-
Hwang, S.1
-
22
-
-
0028466353
-
A comparative study of FMS tool allocation and part type selection approaches for a varying part type mix
-
K. Amoako-Gyampah, "A Comparative Study of FMS Tool Allocation and Part Type Selection Approaches for a Varying Part Type Mix," International Journal of Flexible Manufacturing Systems (v6, 1994), pp 179-207.
-
(1994)
International Journal of Flexible Manufacturing Systems
, vol.6
, pp. 179-207
-
-
Amoako-gyampah, K.1
-
24
-
-
0002874558
-
Formulation and heuristic solutions for parts grouping and tool loading in flexible manufacturing systems
-
K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers, Aug.
-
S. Rajagopalan, "Formulation and Heuristic Solutions for Parts Grouping and Tool Loading in Flexible Manufacturing Systems," Proc. of 2nd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications, K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers, Aug. 1986), pp311-320.
-
(1986)
Proc. of 2nd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications
, pp. 311-320
-
-
Rajagopalan, S.1
-
25
-
-
0000363915
-
Sequential decision procedures for batching and balancing in FMSs
-
C.K. Whitney and T.S. Gaul, "Sequential Decision Procedures for Batching and Balancing in FMSs," Annals of Operations Research (v3, 1985),pp301-316.
-
(1985)
Annals of Operations Research
, vol.3
, pp. 301-316
-
-
Whitney, C.K.1
Gaul, T.S.2
-
27
-
-
0003019633
-
A study of FMS part type selection approaches for short-term production planning
-
K.E. Stecke and I. Kim, "A Study of FMS Part Type Selection Approaches for Short-term Production Planning," International Journal of Flexible Manufacturing Systems (vl, 1988), pp7-29.
-
(1988)
International Journal of Flexible Manufacturing Systems
, vol.1
, pp. 7-29
-
-
Stecke, K.E.1
Kim, I.2
-
28
-
-
0003100937
-
A flexible approach to implementing the short-term fms planning function
-
K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers
-
K.E. Stecke and I. Kim, "A Flexible Approach to Implementing the Short-Term FMS Planning Function," Proc. of 2nd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications, K.E. Stecke and R. Suri, eds. (Amsterdam: Elsevier Science Publishers, 1986),pp283-295.
-
(1986)
Proc. of 2nd ORSA/TIMS Conf. on Flexible Mfg. Systems: Operations Research Models and Applications
, pp. 283-295
-
-
Stecke, K.E.1
Kim, I.2
-
29
-
-
0041536085
-
A planning and scheduling system for flexible manufacturing systems
-
A. Kusiak, ed. (Amsterdam: Elsevier Science Publishers
-
T.E. Morton, and T.L. Smunt, "A Planning and Scheduling System for Flexible Manufacturing Systems," Flexible Manufacturing Systems: Methods and Studies, A. Kusiak, ed. (Amsterdam: Elsevier Science Publishers, 1986), pp151-164.
-
(1986)
Flexible Manufacturing Systems: Methods and Studies
, pp. 151-164
-
-
Morton, T.E.1
Smunt, T.L.2
-
32
-
-
77949999349
-
The problem of the initial transient with respect to mean value in digital computer simulation and the evaluation of some proposed solutions
-
Los Angeles: Univ. of Southern Calif
-
A.V. Gafarian, C.J. Anker, and T. Morisaku, "The Problem of the Initial Transient with Respect to Mean Value in Digital Computer Simulation and the Evaluation of Some Proposed Solutions," Technical Report No. 77-1 (Los Angeles: Univ. of Southern Calif, 1977).
-
(1977)
Technical Report No. 77-1
-
-
Gafarian, A.V.1
Anker, C.J.2
Morisaku, T.3
-
33
-
-
0004267620
-
-
Englewood Cliffs, NJ: Prentice-Hall
-
G. Gordon, System Simulation (Englewood Cliffs, NJ: Prentice-Hall, 1969).
-
(1969)
System Simulation
-
-
Gordon, G.1
-
34
-
-
0026254174
-
Effects of loading and routing decisions on performance of flexible manufacturing systems
-
I.J. Chen and C.H. Chung, "Effects of Loading and Routing Decisions on Performance of Flexible Manufacturing Systems," International Journal of Production Research (v29, 1991), pp2209-2225.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2209-2225
-
-
Chen, I.J.1
Chung, C.H.2
-
35
-
-
0027928107
-
Intermediate tool requirement planning for FMS
-
S.K. Khator and L.C. Leung, "Intermediate Tool Requirement Planning for FMS," Journal of Manufacturing Systems (v13, nl, 1994), pp9-19.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.1
, pp. 9-19
-
-
Khator, S.K.1
Leung, L.C.2
|