-
1
-
-
85120138676
-
-
J. Agnetis, A. Alfieri, P. Brandimarte, P. Prinsecchi, Joint job/tool scheduling in a flexible manufacturing cell with no on-board tool magazine, CIM Systems 10 (1997) 61–68.
-
-
-
-
2
-
-
85120146979
-
-
F. Baccelli, G. Cohen, G.J. Olsder, J.-P. Quadrat, Synchronization and Linearity (An Algebra for Discrete Event Systems), Wiley, Chichester, 1992.
-
-
-
-
3
-
-
85120097375
-
-
Z. Banaszak, Modelling of manufacturing systems, in: M. Zaremba, B. Prasad (Eds.), Modern Manufacturing: Information Control and Technology, Springer, Berlin, 1994, pp. 253–286.
-
-
-
-
5
-
-
0030107003
-
System approach to design generic software for real-time control of flexible manufacturing systems
-
M. Fanti B. Maione G. Piscitelli B. Turchiano System approach to design generic software for real-time control of flexible manufacturing systems IEEE Transactions on Systems, Man, Cybernetics Part A 26 1996 190 202
-
(1996)
IEEE Transactions on Systems, Man, Cybernetics Part A
, vol.26
, pp. 190-202
-
-
Fanti, M.1
Maione, B.2
Piscitelli, G.3
Turchiano, B.4
-
6
-
-
0030196199
-
Job route selection model for workload balancing between workstations in flexible flow line
-
H.-S. Ham Job route selection model for workload balancing between workstations in flexible flow line Production Planning and Control 7 1996 430 438
-
(1996)
Production Planning and Control
, vol.7
, pp. 430-438
-
-
Ham, H.-S.1
-
7
-
-
85120146431
-
-
http://www.iiz.pz.zgora.pl/wppt/iiz/crp/crp.html , The WWW presentation of the Department of Computer Science and Management, the Technical University of Zielona Góra, Poland, 1999.
-
-
-
-
9
-
-
85120122970
-
-
P. Majdzik, Z. Banaszak, R. Miczynski, Bottlenecks control for repetitive production system, in: Proceedings of the 13th International Conference on Computer-Aided Production Engineering, Warsaw, 1997, pp. 345–352.
-
-
-
-
10
-
-
0346264641
-
Logistics in process industries: is it a specific problem?
-
M.T. Puttman Logistics in process industries: is it a specific problem? Production and Inventory Management Journal 17 1991 61 66
-
(1991)
Production and Inventory Management Journal
, vol.17
, pp. 61-66
-
-
Puttman, M.T.1
-
11
-
-
0009423748
-
Optimal batch sizing and repair strategies for operations with repairable jobs
-
K.C. So C. Tang Optimal batch sizing and repair strategies for operations with repairable jobs Management Science 41 1995 894 908
-
(1995)
Management Science
, vol.41
, pp. 894-908
-
-
So, K.C.1
Tang, C.2
-
14
-
-
0031074548
-
A production order-driven AGV control with object oriented implementation
-
M. Shah L. Lin R. Nagi A production order-driven AGV control with object oriented implementation CIM Systems 10 1997 35 48
-
(1997)
CIM Systems
, vol.10
, pp. 35-48
-
-
Shah, M.1
Lin, L.2
Nagi, R.3
-
15
-
-
85120107222
-
-
I.B. Wilson, Synchronized manufacturing — the route to zero inventory and maximum profitability, in: J. Mortimer (Ed.), Logistics in Manufacturing, Springer, Berlin, 1988, pp. 111–117.
-
-
-
|